Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20210N9871999-07-0101 July 1999 Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts ML20209B3571999-06-28028 June 1999 Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl ML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML20196A9801999-06-17017 June 1999 Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl ML20195G8091999-06-14014 June 1999 Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition ML20195K4201999-06-11011 June 1999 Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other ML20195H1561999-06-10010 June 1999 Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 ML20195E4981999-06-0808 June 1999 Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints ML20196L3191999-05-24024 May 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 ML20207A3831999-05-24024 May 1999 Responds to NRC 990326 RAI on DG Srs.Proposed to Add Listed Sentence to TS Bases for SRs 3.8.1.7,3.8.1.12 & 3.8.1.15,as Result of Discussion with NRC During 990427 Telcon ML20211K4261999-05-18018 May 1999 FOIA Request for Documents Re San Onofre OI Repts 4-98-041, 4-98-043 & 4-98-045 ML20206S7161999-05-17017 May 1999 Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3 ML20206N4711999-05-13013 May 1999 Provides Info Requested by NRC Re Reduced Pressurizer Water Vol Change Amends Application 172 & 158 for Songs,Units 2 & 3,respectively.Proposed Change Will Reduce Pressurizer Water Level Required for Operability ML20206M7791999-05-13013 May 1999 Informs NRC of Changes Being Made to Emergency Response Data Sys (ERDS) at SONGS Unit 3.Revised Page to ERDS Data Point Library Is Provided in Encl ML20206K6891999-05-11011 May 1999 Forwards Approved Amends to NPDES Permits CA0108073,Order 94-49 & CA0108181,Order 94-50 & State Water Resources Board Resolution ML20206M0681999-05-10010 May 1999 Submits Correction to Info Contained in Licensee to NRC Re Proposed TS Change Number NPF-10/15-475.Stated Info Was Incorrect in That Overtime Provisions Were Not Contained in TR at Time of Was Submitted ML20206H0451999-05-0404 May 1999 Forwards Annual Financial Repts for Listed Licensees of Songs,Units 1,2 & 3.Each Rept Includes Appropriate Certified Financial Statement Required by 10CFR50.71(b) ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML20206E5851999-04-29029 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for SONGS Units 1,2 & 3. Also Encl Are Rev 13 to Unit 1 ODCM & Rev 31 to Units 2 & 3 Odcm ML20206C5151999-04-29029 April 1999 Forwards 1998 Radiological Environ Operating Rept for Songs,Units 1,2 & 3. Annual Radiological Environ Operating Rept Covers Operation of Songs,Units 1,2 & 3 During CY98 & Includes Summaries Interpretations & Analysis of Trends 1999-09-29
[Table view] |
Text
-
1
.I
(
o I
Westinghouse Electric Company, Box 355 6
j-a dMeson of CBS Corporation Pinsburgh Pennsylvania 15230 0355 l
- July 7,1998 j
CAW-98-1263 Document Control Desk U.S. Nuclear Regulatory Commission i
~ Washington, DC 20555 h
i Attention: Mr. Samuel L Collins I
5 i
j APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE j
Subject:
WCAP-13698, Revision 2, Addendum 1, " Laser Welded Sleeves for 3/4 Inch Diameter Tulx i
Feedring-Type and Westinghouse Preheater Steam Generators Generic Sleeving Report,"
l' (Proprietary)
I l
Dear Mr. Collins:
I The proprietary information for which withholding is being requested in the above-referenced report is j
further identified in Affidavit CAW-98-1263 signed by the owner of the proprietary information, j
Westinghouse Electric Company, a division of CBS Corporation (" Westinghouse"). The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public e
disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of j
10 CFR Section 2.790 of the Commission's regulations..
i Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Southern Califorma e
l Edison Company, Correspondence with respect to the proprietary aspects of the application for withholding or the l
Westinghousa affidavit should reference this letter, CAW-98-1263, and should be addressed to nr undersigned.
i Very truly yours, i
xq'
'a e
j J.'M: Brennan, Manager i
Engineering and Licensing Site Ser5 ices i
Enclosures cc: T. Carter /NRC (SE7)
ADOCK05000361]()
9812290074 981222 PDR P
PDR g 276 N 070795 D h Ol*]
-. - - ~ -
I t'
Proprietary Information Notice Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.
4 1
In order to conform to the requirements of 10 CFR 2.790 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is i
proprietary in the proprietary versions is contained within brackets, and where the proprietary informrdon has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) contained within parentheses located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary t
or in the margin opposite such information. These lower case letters refer to the types of mformation Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the i
affidavit accompanying this transmittal pursuant to 10 CFR 2.790(b)(1).
i i
s 1
4 i
r 4
i
.m Copyright Notice The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requ'irements of 10 CFR 2.790 regarding restrictions -
on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reportsi the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
l I
1 i
i a
CAW-98-1263 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss
- COUNTY OF ALLEGHENY:
Before me, the undersigned authority, personally appeared James M. Brennan, who, being by me duly sworti according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company, a division of CBS Corporation (" Westinghouse"), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
D%1
'hww-Jannes.hi. Brennan, Manager Engineering and Licensing Site Services
]
Sworn to and subscribed before this [ M day of
,1998 j' /
Notarial Seal
\\
Janet A. Schsab, Notary PtMc jffg M
nnI a pr May 2
~ '~~
Notary Public unnter. Pennsy%nia AssocWlon of homes 1
21 esc ttAtelom
i
-2 CAW-98-1263 i
l (1)
I am Manager, Engineering and Licensing Site Services, in the Nuclear Services Division, of the Westinghouse Electric Company, a division of CBS Corporation (" Westinghouse"), and as j
I such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing l
and rulerr.aking proceedings, and am authorized to apply for its withholding on behalf of the Westinghouse Energy Systems Business Unit.
I (2)
I am making this Affidavit in conformance with the provisions of 10CFR Section 2.790 of the Commission's regulations and in conjunction with the Westinghouse application for withholding accompanying this Affidavit.
3 l
(3)
I have personal knowledge of the criteria and procedures utilized by the Westinghouse Energy Systems Business Unit in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4)
Pursuant to the provisions of paragraph (b)(4) of Section 2.790 of the Commission's l
regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i)
The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii)
The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and. in that connection, I
utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of i
2*eew-2mm CAW-98-1263 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b)
It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved m;;ketability.
(c)
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d)
It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e)
It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f)
It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a)
The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b)
It is information which is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c)
Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
wunom CAW-96-1263 (d)
Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e)
Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f)
The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii)
The information is being transmitted to the Commission in confidence and, under the provisions of 10CFR Section 2.790, it is to be received in confidence by the Commission.
(iv)
The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v)
The proprietary information sought to be withheld in this submittal is tnat which is appropriately marked in the WCAP-13698, Revision 2, Addendum 1, " Laser Welded Sleeves for 3/4 Inch Diameter Tube Feedring-Type and Westinghouse Preheater Steam Generators Generic Sleeving Report," (Proprietary), June,1998 for the Southern California Edison Company being transmitted by Southern California Edison Company letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk, Attention Mr. Samuel J. Collins. The proprietary information as submitted for use by the Southern California Edison Company is expected to be applicable in other submittals for related license amendment packages.
This information is part of that which will enable Westinghouse to:
wcummm c - -
.-..-=-- _ _ -.
{
5-CAW-98-1263 (a)
Provios documentation to support related license amendments for laser welded sleeves on steam generators.
l t
(b)
Establish applicable codes and standards which are to be applied to the process.
l j
(c)
Assist the customer to obtain NRC approval.
Further this information has substantial commercial value as follows:
(a)
Westinghouse plans to sell the use of similar information to its customers for purposes of meeting NRC requirements for licensing documentation.
(b)
Westinghouse can sell support and defense of the technology to its customers in the licensing process.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar Ibensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended for developing testing and analytical methods and performing tests.
Further the depenent sayeth not.
2=cm==
a r -