Requests That Safe Energy Coalition of Michigan 860215 2.206 Petition Be Denied Due to Lack of Basis.Five Allegations Deemed as Legal Arguments or Conclusions in Support of Requested Relief
ML20154S603
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/28/1986
From: Charnoff G
DETROIT EDISON CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-#286-690 2.206, NUDOCS 8604020109
Download: ML20154S603 (17)


Text

. s

, . s SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNERSMsP INCLUDING PROFESS'ONAL CORPORATIONS 1800 he STREET, N. W.

Ye ASHINGTON, D. C. 20036 raaeSAY D. POTTS. P.C. STEVEN M LUCAS, P C. } TMO*4AS C MILL E. SUE SPRAGUE FTruART L. PiTTMs.m. P C. - 3AveD se RueENSTEine. P C - L DuaNE CHEEn DOANE r. euECHEL Hs ATEPHEN D. POTTS. P C. MATIAS F. TRAveESO 04A2. P C. M*CM AE L R MADDEN GRUCE S. McE LVEtN*

GERALD CMARNOFF. P C. YsCTORtA J. PERM 8NS. P C. TELECOPtER . RALPM A. TAYLOR. JR ALANft WASSERMAN PMfLL89 D 50STwsCM. P C. ' JOHN M O NE8LL JR . P C. (202) 8221099 6,822m99 ALLE N J MLEW wetet RT WA$meeGTON H EL TsMOTHY MANLON. P C. ' JAY A. EPSTIEN P C. M ANNAM E. M LtE SE Rhe AN DOROTHE A w. OsCME RheAN GEORGE M ROGE RS. JR P C. JEFFERY L YABLON. P C - JUDITM A SANOLER JONATH AN T. CAsN' FRED A LITTLE, P C. JACM MenAY. P C

  • MsCMARD A. SAMP DOLGL AS L. M*LLE BOE JOwas S RMINELANDER. P C. - MARRY M. GL AS$ PiEGEL RAPtFAx 100 TMOM AS E CROCa E R. J R R* CHARD s ANSs*CHER N' I "C".eN*M,5. P C. wYLt"A N Js"AN '" * * *##' '#

EARYMIe ptNNETM R M row AN #

  • N NAEJ E 'OTA EVANS MUSER M/ RTIN D, RRALb P C- PAUL I M'C"ET* j g; -

JOHN L CARR J. - JOMN M. MORE'LLER JUDY wEtseURGM JAY E. SILBERG. P C TELEM PAUL S. psLEcus ETMAN J. F ReE DMAme OSERh M.GCint ON

O EVA EN J PC* EEL a t FER 89 693 (SMAwLAW wSM) 'DE LIN M T'E REYD **UTC MING S *
2. hENLY WE SSTER P C. C$"D p J. ON CABLE "$M awl AW' STANLEYes SARG E

ROSE ANN S. LLivAN NATMANIE L P. G RE E D. JR., D C. LOUISE A. MAv *EWS LE S L8E M. S8d' M BARBARAB MAN NIG AN MsRM AUGENGLtCK. P.C A RLM EGS M.

JEAN

  • ON T A.NG E AL.OWAY

~

MAML8 w%J JOSE PH E ME NDALL ERNE ST L BLAnt JR., P C. STEPHEN 9 MElh4 A *eN RCHE RT ** Ds Grov ANNI CAPLETON S JONE S. P C. PMW d MA8evEY WRGt8e6A OFFtCE PAMEL A M. ANDERSON AMeE MARE MCMT THOMAS A. SAXTER. P C BONestE S. GOTTL'ES SOi FARM CREDfT DRevE ALE xaNDE R D. TO**ASZCZUM JOHN N. N AS$smAS lit

  • SMELI.ri,eet J. WEISE L. P.C, MowARD M. SMAFFE RMAN JEFFREY J A. GissS D6ANE S SMAPsRO J. PATR4CK MICKEY, P.C

" . N. I 10 4 L AURE NCE w. COMEN CRsSTE E tea G NASER*

S TA ANE 4 TMOMAS LENMART. P C paygu'two NBERG Ag '703)730 7900 DE RE M w LINDE N SvLvea M LOTRECM CALvfN M COBS lie MAmitvesF.DREES STEVEN L. ME LTZER. P C. ~

- JEFFREYR SNYDER* SUSAN C. LONGSYREET**

DEAN D. AULtCM* P,C. GEORGE F ALBRtGMT JR *. DARvL AseNE LaosOE R MtCMAEL C. MOE TELL W.*O'*e"AS'hC S .u. P C.-

RO7ERTE.COMN nW, ^4 "?C"O'G A S, A N g',c "',', ", n'n'a g,J'sR/,=R g;;;'Ta, man,g a" A

SME sL A McC MARvEY Ap. T A J. F,N E LSTripe . LESL E C. ZiM eE RG **

CMARLES 8 TEMutN. P C- DELISSA A. RtDGwAY - DAV8D R SAMR J ANE T C. HECR*

STEPMEN 3. MUTTLE R, P.C. ME NNETH J. MAUTMAN C SowDO DsAmet MONTLLOM WR'GMT**

wipeTM ROP N. BROWN. P.C. DAVID L AwRE PeCE M8LLE R* FRED DRASNE R JE FFRE v w'ee TRatN

.mAMPELMAN se E NDRA A GALLAGMER**

JAMESB MAMLIN. P C. FREDEmeCM L mLEtN JOHN r. DE ALY, mENNETH A GALLO DOROTMvA SCMLOTM*

RANDAL S. KELL. P.C STEVE N P. PeTLE R David m Lgwe$ N ANCY C. WAGNE R R. SCOTT CUSTER. J4- RICH ARD J PARRsNO RecteARD S. SE ATTY A PATR'CM LE'GMTON tit RfCMARD C. DON ALDSON#* '

ROXE RT E. ZAMLER. P C. ELLE*e A. FREDEL ROSERTE. CONN JEFFREY G SE RMa ae MELLY M C Am*e E S

  • RO6ERT S. RosetNS. P.C M AR8E N. DOL AND* MEV8N FLYNN OS*E L. MOORE
  • GEORGE r. TRowmRiDGE *,,,,,,,,,.,,,c.

COUNSEL

  • Aommitteo ses Vaseo.es.4 wester S D4 Rect DaAL NuesaER (202) 822-1032 March 28, 1986 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission  ;

799 Roosevelt Road Glen Ellyn, Illinois 60137 Re: The Detroit Edison Company (Fermi 2)-

Docket No. 50-341; License No. NPF-43

Dear Mr. Keppler:

On February 15, 1986, the Safe Energy Coalition of Michigan ("SECOM") filed a petition with the Nuclear Regulatory Commission ("NRC") requesting that, pursuant to 10 C.F.R.

SS 2.202 and 2.206, certain enforcement proceedings be.insti-

, tuted against The Detroit Edison Company, co-owner and licensed operator of Fermi 2; Wolverine Power Supply Cooperative, Inc.

is the plant's other co-owner. The relief sought was two-fold (Pet. at 2):

1. To " elevate" enforcement action against Detroit Edison resulting in a proceeding to revoke the Fermi 2 operating license; and P

'h

. .a "s SH Aw, PITTMAN, PoTTs & TROWBRIDGE

' A PARTNER $>HP WCLUD*G PROFES$@NAL COR*ORATICMS Mr. James G. Keppler March 28, 1986 Page 2-

2. To issue an order to show cause why Detroit Edison's license to operate Fermi 2 should not be revoked.

Though-listed as two separate forms of relief, it is clear that the SECOM requests are identical ~and seek the commencement of a show cause proceeding under 10~C.F.R. $ 2.202. -

For the reasons discussed below, SECOM's petit _on is with-out basis and should be denied in all respects.

I. The SECOM-Petition In support of its requested relief, SECOM identifies- five

" allegations" which- in its view warrant initiation of a show cause proceeding. The five~SECOM " allegations" are (Pet. at 2-3):

1. The U.S. Nuclear Regulatory Commission has not ele-vated.the enforcement actions against the licensee to the necessary levels mandated and provided for in the Acts a'nd Code of Federal Regulations, as a result of the events that have occurred at the Fermi 2 nuclear power plant;
2. Continuing lack of management controls at levels re-quired to meet NRC regulations and requirements; the result has been ineffective programs and incompetence at critical levels of the organization including operations, maintenance, security, and engineering;
3. The twenty-six violations issued recently were willful, in other words, showed careless disregard for requirements;
4. The licensee has been unable to comply with certain NRC requirements; and
5. The recently released operations improvement- plan will -not provide the rubstantive changes needed to correct the serious breakdown of operations at the Fermi 2 nuclear plant.

[ Emphasis in original.)

In reality, the five claims are not allegations, but in-stead are conclusions or legal arguments in support of the

- , - _ ,- --, , - , - .-.~.-.-,-,-,_..__-----.__._,,,_..-_m_-

m i SHAw, PITTMAN, PoTTs & TROWBRIDGE A PARTNERSMtP INCLUOtNG PROFES5 ION AL CORaOR ATIONS Mr. James G. Keppler March 28, 1986 Page 3 requested relief. The factual bases for these conclusions and legal arguments are spread throughout the remaining 17 pages of SECOM's petition in random fashion. The SECOM petition- does not clearly address each of the five " allegations," nor does it precisely identify the separate facts which are claimed-to sup-port each " allegation."

In order to better focus our analysis on the factual bases for the petition, and to determine whether there are any mat-ters which require consideration in a show cause proceeding, listed below 'are those few issues which SECOM asserts warrant '

increased enforcement action.

1. Those items described as operational errors, degraded plant equipment and programmatic weaknesses in Mr.

Keppler's letter of December 24, 1985. See Pet. at 6, 12.

2. The 26 violations reported in NRC Inspection Report No. 50-341/85040. See Pet. at 6-7, 13-15.
3. Concerns over the number, tracking and evaluation of Licensee Event Reports ("LER's"), as identified in NRC Inspection Report No. 50-341/85042 and an inter-nal NRC memorandum of January 3, 1986. See Pet. at 7-9, 15.
4. Findings from various audits of Detroit Edison made during the construction phase of the Fermi 2 project which allegedly demonstrate that the Reactor Opera-tions Improvement Plan and the Nuclear Operations Improvement Plan are inadequate to correct identified problems in the areas of plant operations, engineer-ing, maintenance and security. See Pet. at 18-19.

The common characteristic of these items is that all were garnered from publicly available information. Indeed, most of the SECOM allegations are drawn directly from material in NRC inspection reports, letters and memoranda. Those allegations not based on NRC documents come from third-party audits of Detroit Edison's construction programs. The SECOM petition simply contains no new facts or claims; all of the information was previously available.

. .. i SHAw, PITTM AN, PoTTs & TROWBRIDGE A PARTNCRSMap sNCLUDiNG PROFES$sONAL CORI* ORATIONS Mr. James G. Keppler March 28, 1986 Page 4 II. Legal Standards Governing a Section 2.206 Petition Pursuant to Section 2.206, one can petition the Commission to issue an order to show cause instituting a proceeding to modify, suspend, or revoke a license, or to take such other ac-tion as may be proper. The petition is to specify the action requested and " set forth the facts that constitute the basis for the request." 10 C.F.R. 5 2.206(a). Well-established Com-mission precedent holds that a show cause proceeding will not be instituted unless " substantial health or safety issues" have-been raised. See Consolidated Edison Co. of New York (Indian Point, Unit Nos. 1, 2 and 3), CLI-75-8, 2 N.R.C. 173, 176 (1975); Northern Indiana Public Service Co. (Bailly Generating Station, Nuclear-1), CLI-78-7, 7 N.R.C. 429, 432-33 (1978),

aff'd sub nom. Porter County Chapter of the Izaak Walton League

v. NRC, 606 F.2d 1363, 1368 (1979).

Where the allegations in a Section 2.206 petition are drawn primarily from NRC inspection activities -- as is cer-tainly the case here -- show cause proceedings generally have been viewed as unnecessary. See, e.g., Washington Public Power Supply System (WNP No. 2), DD-84-7, 19 N.R.C. 899, 922-23 (1984). This is because in such cases the petitioner does not seriously challenge the NRC Staff statement of the facts, but only disagrees as to the significance of those facts and the nature or extent of enforcement action to be taken. But,

"[t]he choice of a remedy for a violation is 'within the sound judgment of the Commission, and not foreordained.'" Censumers Power Co. (Midland Plants, Units 1 and 2), DD-84-17, 10 N.R.C.

226, 231 (1984), quoting Petition for Emergency and Remedial Action, CLI-78-6, 7 N.R.C. 400, 406 (1978); see also Duke Power Cc. (Catawba Nuclear Station, Units 1 and 2), DD-85-9, 21 N.R.C. 1759, 1771 (1985). Thus, show cause proceedings or other formal adjudicatory proceedings are inappropriate forums for resolving wholly discretionary matters like the extent of enforcement action to be taken.

Indeed, Commission case law recognizes that the purpose of the NRC's inspection and enforcement program is to identify problems and failures to comply with applicable requirements.

I t. is common that deficiencies will be found as a result of such inspections. Corrective actions by the licensee that address the deficiencies and minimizes the likelihood of

reoccurrence are what the Commission requires when violations are identified. See Duke Power Co. (Catawba Nuclear Station, e

SH Aw, PITTM AN, PoTTs & TROWBRIDGE A PARTNEF-SMsP kNCLUDING PROFESSCNAL COR80 RATIONS Mr. James G. Keppler March 28, 1986 Page 5 Units 1 and 2), DD-84-16, 20 N.R.C. 161, 165-66 (1984). Con-trary to the view apparently held by SECOM, license revocation or suspension is neither required nor appropriate simply be-cause there have been. violations of NRC requirements. See, e.g., Pacific Gas & Electric Co. (Diablo Canyon Nuclear Power Plant, Unit 1), DD-84-8, 19, NRC 924, 933 (1984); Washington Public Power Supply System (WNP Nos. 4 and 5), DD-82-6, 15 N.R.C. 1761, 1766 n.9 (1982). As the Director stated in Pacific Gas & Electric Co. (19 N.R.C. at 933):

The choice of enforcement sanctions for violations of NRC requirements rests within the sound discretion of the Commission, based on consideration of such factors as the significance of the underlying viola-tions and the effectiveness of the sanction in securing lasting corrective action.

The thrust of the SECOM petition is that Detroit Edison has violated Commission requirements, that these violations have occurred frequently, and, as a result, the NRC can have no assurance that Detroit Edison will be able to operate the Fermi 2 plant safely in the future. Similar claims have been presented to the Commission in proceedings involving other nuclear plants and generally have been found inadequate _because uof the petitioners' failure to recognize corrective action that has been taken and changes in plant management that- have been made. E.g., Mississippi Power & Light Co. (Grand Gulf Nuclear Station, Unit 1), DD-84-21, 20 N.R.C. 788, 796-97 (1984). To succeed on such a claim, the petitioner bears the heavy burden of demonstrating that corrective action has been insufficient and that the NRC's ongoing inspection and enforcement program will be inadequate to monitor and detect any remaining con-cerns. Id. at 796-97; Duke Power Co. (Catawba Nuclear Station, Units 1 and 2), DD-84-16, 20 N.R.C. 161, 165) (1984).

As described in the following two sections, the scope and effectiveness of the NRC's inspection program at Fermi 2 and the corrective actions and management changes made by Detroit Edison are sufficient to provide reasonable assurance that the Fermi 2 plant can be operated safely and without undue risk to

, the health and safety of the public. In such circumstances, instituting a show cause proceeding to review the matter is both unnecessary and inappropriate.

r 1

i

e e 16 SHAw, PITTMAN, PoTTs & TROWBRIDGE A PARTNER $MiP INCLUOspeG mROFES$CNAL CORPORAf@re$

Mr. James G. Keppler March 28, 1986 Page 6 III. The NRC Inspection and Enforcement Program at the Fermi 2 Plant NRC issued Detroit Edison a fuel loading and low power license.for Fermi 2 on March 20, 1985. That license was issued after extensive reviews of the operating license application by the NRC Staff and the Advisory Committee on Reactor Safeguards

("ACRS"). Hearings on the application had been held before an Atomic Safety and Licensing Board, a favorable decision ren-dered,'and appellate review by an Atomic Safety and Licensing

' Appeal Board had been completed. See The Detroit Edison Co.

(Enrico Fermi Atomic Power Plant, Unit 2), LBP-82-96, 16 N.R.C.

1408 (1982), aff'd, ALAB-730, 17 N.R.C. 1057 (1983). Two re-

, quests for action under 10 C.F.R. 5 2.206 had been denied. by the Director of Nuclear Reactor Regulation; a third request

filed.after issuance of the low power license was denied by the Director of Inspection and Enforcement. See The Detroit Edison

, Co. (Enrico Fermi Atomic Power Plant, Unit 2), DD-84-ll, 19 N.R.C. 1108 (1984); DD-85-4, 21.N.R.C. 546 (1985); DD-85-13, 22 N.R.C. 454 (1985).

Before actual plant operations began, inspectors from NRC 4

Region III had reviewed and assured themselves that Detroit i Edison operating personnel and procedures were adequate to

] safely operate Fermi 2. This inspection process included nor-

mal and augmented reviews to assess operational readiness, as

! well as evaluations made' pursuant to the NRC's Systematic l Assessment of Licensee Performance ("SALP") program.

.. In its SALP 5 Report, covering the period October 1, 1983' through September 30, 1984, the NRC rated Detroit Edison "Cate-

~

gory 2" in those areas relating to plant operations, including Preoperational Testing, Radiological Controls, Security and I

Safeguards, and Operational Readiness. Such a rating means that " Licensee management attention and involvement are evident a and are concerned with nuclear safety; licensee resources are adequate and are reasonably effective such that satisfactory performance with respect to operational safety or construction is being achieved."

In its SALP 6 Report, covering the period October 1, 1984 through June 30, 1985, in those areas again relating to plant

, operations, the NRC. rated Detroit Edison " Category 1" for Fuel-i ing and Preoperational and Startup Phase Testing, and "Cate-gory 2" for Plant Operations, Radiological Controls, Mainte-

nance, Surveillance, Security, and Quality Programs and i

i

SH Aw, PITTM AN, PoTTs & TROWBRIDGE A PARTNERS +P eNCLUDING PROFESSION AL CORPORATIONS Mr. James G. Keppler March 28, 1986 Page 7 Administrative Controls. The Category 1 ratings mean that

" Licensee management attention and involvement are aggressive and oriented toward nuclear safety; licensee resources are anple and effectively used so that a high level of performance with respect to operational safety or construction is being achieved."

Initial criticality of Fermi 2 was achieved on June 21, 1985. During the late evening and early morning of July 1 to 2, while the plant was beginning its third startup sequence, criticality was achieved prematurely. As a result of the pre-mature criticality event, on July 16, 1985, NRC Region III Ad-ministrator James Keppler sent Detroit Edison a Confirmatory Action Letter. The purpose of the letter was to confirm that Detroit Edison would take five specific corrective actions to evaluate the premature criticality event and to assure that similar events would not reoccur. In addition, the Con-firmatory Action Letter specified that Detroit Edison would ob-tain verbal concurrence from the NRC Region III Administrator, or his designee, prior to exceeding five percent (5%) reactor power.

Following the Confirmatory Action Letter, NRC inspection activities at the Fermi 2 plant became more intensive. On July 23, 1985, Detroit Edison made a prcsentation to Region III personnel describing the event, evaluating the safety signifi-cance and reportability of the event, and identifying the root causes and corrective actions being undertaken by the company.

Detroit Edison's response to the Confirmatory Action Letter was submitted on September 5, 1985. It included a po1nt-by-point response to the six items raised in the Confirmatory Action Letter, as well as an updated copy of the July 23 presentation reflecting the status of the corrective actions being under-taken. Detroit Edison made a further presentation to NRC Region III personnel on September 10, 1985. At that time a Re-actor Operations Improvement Plan was described.

On August 18-20 and September 16-20, 1985, NRC inspectors performed a special, unannounced Operational Readiness Team re-view of the Fermi 2 facility. Five inspectors spent 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> onsite, including 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> during the backshifts. The purpose of this review was to evaluate the effectiveness of management controls over operations, the conduct of operations, the au-thority and responsibilities of operational personnel, and the methods used to accomplish shift turnovers, communications and recordkeeping. In addition, Detroit Edison's corrective

SHAw, PITTM AN, PoTTs & TROWBRIDGE <

A PARTNERSMrP tNCLUD'NG PROFESStCN AL CORRORATSONS Mr. James G. Keppler March 28, 1986 Page 8

, actions taken in reponse to the Confirmatory Action Letter were reviewed. The results of this evaluation are reflected in NRC Inspection Report No. 50-341/85043, transmitted to Detroit i Edison on November 8, 1985. In its report the NRC listed .both licensee strengths and weaknesses, and no violations of NRC requirements were identified.

Additional NRC inspections dealing with the premature 4 criticality event and with other plant operational issues have been undertaken. Summarized below are four of those inspec-tions.

Between July 1 and October 15, 1985, the Fermi 2 resident inspectors conducted a special, unannounced review of various operational activities. Two hundred forty-six hours were spent

onsite by three inspectors, including 77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br /> during the i backshifts. The results of their review are presented in NRC Inspection Report- No. 50-341/85040, transmitted to Detroit Edison on January 7, '986.

. Twenty-six apparent violations

, (including multiple examples) were identified during the inspection; nine of the violations dealt with the premature

. criticality event, the others related to events surrounding i

various plant operational matters. Specific enforcement action

based on this inspection report has not yet been made known to Detroit Edison.

i Between October 1 and November 30, 1985, two regional in-spectors conducted a routine, unannounced review of plant ac-i tivities. Two hundred ninety-seven inspector hours were spent i onsite, including 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> during the backshifts. Areas in-spected included LER reviews, operational safety verification,

, monthly maintenance observations, monthly surveillance observa-tions, plant trip reviews, and other similar matters. Of the 12 areas reviewed, no violations or deviations were identified in 11 areas. One Level IV severity violation relating to the

. ate submission of LER's was identified, but the inspectors concluded this violation had no impact on safety. The results of this inspection are reported in Inspection- Report No.

50-341/85042, transmitted to Detroit Edison on December 31, 1985.

A similar routine, unannounced review of plant activities

was conducted by two resident inspectors between December 1 and t

31, 1985. One hundred ninety-two inspection hours were spent onsite, including 47 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br /> during the backshifts. Areas in-spected included engineering design verification procedures, t

I I

. o .

SH Aw, PITTM AN, PoTTs & TROWBRIDG E A PARTNERSM6P INCLUDING PaOr[SSiON AL C04pOR ATIONS Mr. James G. Keppler March 28, 1986 Page 9 operational safety verification, monthly maintenance observa-tions, monthly surveillance observations, emergency diesel gen-erator repairs, and other similar matters. In the areas re-viewed no violations or deviations were identified. The results of this review are contained in NRC Inspection Report No. 50-341/85048, transmitted to Detroit Edison on January 28, 1986.

Between November 12 and December 27, 1985, the NRC con-ducted an in-depth inspection of the security program at Fermi 2. This inspection was discussed with senior plant per-sonnel on November 21 and December 13 and 19, 1985. Fourteen potential violations of NRC requirements were identified during this inspection. The results of this security program review are contained in NRC Inspection Report No. 50-341/85047, trans-mitted to Detroit Edison on February 11, 1986.

Based on these inspections, and on other ongoing reviews of Detroit Edison's activities at Fermi 2, the NRC became con-cerned over the growing number of apparent operational errors, degraded plant equipment and programmatic weaknesses. Accord-ingly, on December 24, 1985, NRC Region III Administrator Keppler sent to Detroit Edison a letter pursuant to 10 C.F.R. 6 50.54(f) requesting that additional information be submitted under oath or affirmation to enable the NRC to determine wheth-er or not the Fermi 2 license should be modified, suspended or revoked. Detroit Edison responded to this request in a letter dated January 29, 1986, from Walter J.~McCarthy, Jr., Chief Ex-ecutive Officer and Chairman of the Board of Directors.

Detroit Edison's January 29 letter reiterated the company's commitment to the highest standards for managing and operating the Fermi 2 plant, and responded in detail to the NRC's in-formation request. It identified a Nuclear Operations Improve-ment Plan, described the role of a newly-formed Independent Overview Committee, updated progress on the Reactor Operations Improvement Plan, and described those specific actions Detroit Edison would be taking prior and subsequent to restart of the Fermi 2 plant.

By letter dated March 7, 1986, the NRC acknowledged re-ceipt of Detroit Edison's response to the 10 C.F.R. $ 50.54(f) request, ntated that no further written response would be re-quired, indicated that it had received the initial report of the Independent Overview Committee, that it would like to meet with the committee prior to restart, and that it would like to meet with Detroit Edison monthly to monitor and evaluate the

. o o SH Aw, PITTMAN, PoTTs & TROWBRIDGE A PARTNERSMIP 18eCLUO4NG PROFES$sONAL CORPORATtONS Mr. James G. Keppler March 28, 1986 Page 10 company's progress in implementing corrective actions. On March 12, 1986, the NRC Commissioners were briefed by the Staff, Detroit Edison, and two interested members of the public (including a representative from SECOM) on the status of the Fermi 2 plant.

Detroit Edison believes it undeniable that NRC inspection and enforcement activities have been especially intensive at the Fermi 2 plant. Since the premature criticality event on

' July 1, numerous inspections and enforcement meetings have been conducted. These inspection and enforcement activities have been supplemented by information submitted in response to the NRC's 10 C.F.R. 5 50.54(f) request, and by NRC reviews of cor-rective action programs and evaluations developed by Detroit Edison, including the Reactor Operations Improvement Plan, a proposed Nuclear Operations Improvement Plan, and the initial report of the Independent Overview Committee. The allegations in SECOM's Section 2.206 petition are the result of this inten-sive NRC review focused on Fermi 2. Rather than evidencing. a ,

situation where formal adjudicatory proceedings are necessary to discover the facts, the SECOM petition itself demonstrates that existing NRC methods and procedures have been adequate to identify the problems and to cause Detroit Edison to develop appropriate corrective actions. The full scope and extent of those corrective actions are described next.

IV. Detroit Edison's Program'to Improve Performance at the Fermi 2 Plant In response to the problems experienced at the Fermi 2 plant, Detroit Edison has developed a number of far-reaching programs that address both short-term concerns and longer-term, more programmatic issues. The approach of the company is aptly captured in'the opening remarks of Mr. McCarthy during the'Com-mission's briefing on March 12, 1986. Mr. McCarthy there stat-ed (Transcript at 61-62, 65-66):

[W]e [ Detroit Edison] let you down and I'm very, very sorry about that. The inci-dent, I think, that has caused the greatest concern in my professional life was the rod pull incident of July 1 [to] 2. I have carefully examined the incident itself. It was a very dumb thing for the Detroit Edison Company people not to have realized the sensitivity of that, whether or not it

, e- .- 1 l

l SHAw, PITTM AN, PoTTs & TROWBRIDGiI A PARTNER $MiP INCLUO'NG PROFESS 8CNAL CORPORAT60NS Mr. James G. Keppler March 28, 1986~

'Page 11 was a reportable incident or not. It should have been brought.much higher than it was. * * *'* That has poisoned the re-lationship between the NRC and the Detroit Edison Company ever since then and we are fighting our way to get out of that situa-tion. And we will succeed.

We are doing lots of things. You have heard from Mr. Keppler about our reply to the150.54(f) letter. We have, I think, fo-cused the entire attention of the company upon the Fermi plant. And that starts with me. I, the Chief Executive Officer of the company, am now the person to whom the Vice President of Nuclear Operations reports. I spend, personally, three mornings a week at the Fermi plant and lots and lots of after-noons not at the Fermi plant but working on the Fermi plant. I do that because it is absolutely essential to the company that we get back to the standard that we had when I appeared before you last. We are going to do that. We have the people to do it.

It's the same people, virtually, who were there. They're the people who got the plant done, who did the low power testing, and they can perform excellently again.

[T]he attention of this company is directed toward the safe operation of Fermi. We have no schedule, at the present time, for startup because the most impor-tant thing, I think, from our standpoint and also from the plant standpoint, is that when that start takes place that we do it right. I'm not in any hurry. I have said that' publicly, a number of' times. I've got to be convinced before we call up Region III and say we want to start up again.

i I

a O S SH AW, PITTM AN, PoTTs & TROWBRIDGE A PARTNERS >4tp INCLUDimG PROFES5*ON AL CORPORATIONS Mr. James G. Keppler March 28, 1986 Page 12 One part of the company's corrective action program is the Reactor Operations Improvement Plan. That plan was initially presented to the NRC at a meeting en September 10, 1985. The objective of the plan is to go beyond the corrective actions implemented following the Confirmatory Action Letter, and to develop short- and long-term programs in three general areas relating to management support of operations, shift management and administrative systems. The Reactor Operations Improvement Plan was formally. transmitted to the NRC in a letter dated October 10, 1985. As described in that letter, Detroit Edison is implementing corrective actions in six broad areas:

1. Increased management support and operating staff effectiveness in control room
2. Improved communication practices
3. Improved administrative procedures and systems
4. Improved effectiveness of incident evaluation and corrective action process
5. Increased awareness of consequences of errors and strengthened accountability
6. Reduced number of equipment repairs and modifications being worked at any one time The company has identified criteria for measuring the effec-tiveness of the program and specified an independent verifica-tion of implementation by the Nuclear Quality Assurance organi-zation.

On November 8, 1985, the NRC acknowledged receipt of the Reactor Operations Improvement . Plan, concluded that the plan "contains the appropriate attributes which, if properly imple-mented, should achieve the desired results," and requested Detroit Edison to provide specific quantitative criteria that could be used for measuring the effectiveness of the plan.

Those quantitative criteria were provided on November 27, to-gether with graphical information showing that during the three month period between September and November 1985 positive trends were established indicating that Fermi 2 is approaching the desired level of performance.

, c4 t-SHAw, PITTM AN, PoTTs & TROWBRIDGE j mor.os . .cwca onss.o .c com o..rio~s Mr. James G. Keppler March 28, 1986 Page 13 As previously noted, in response to the NRC's request for information pursuant to 10 C.F.R. 5 50.54(f), Detroit Edison is

-developing an even more broadly-based corrective action pro-gram, which is referred to as the Nuclear Operations Improve-ment Plan. This plan is in addition to the Reactor Operations '

Improvement Plan and is intended to " strengthen the sensitivi-e ty, discipline and responsiveness of the Nuclear Operations or-ganization" by addressing " planning, accountability, attitude, j communications, teamworn, follow-up and training in the entire organization." See January 29, 1986 letter from McCarthy to Keppler at page 2. The Nuclear Operations Improvument Plan will be' initiated no later than May 1, 1986, and will be fully

implemented by July 1, 1986.

4 An integral part of the overall program for improvement at

, Fermi 2 includes the formation of an Independent Overview Com-mitte'e ("IOC"). The IOC is composed of recognized experts .in

, the nuclear industry. Its purpose is to provide Detroit Edison i management and the Board of Directors with an evaluation of operations at the Fermi 2 plant and an assessment of perfor-mance of the Nuclear Operations management. The IOC is to pro-vide advice concerning changes in management, management sys-tems or structures, and in the operation of Fermi 2. The j initial report by the IOC was forwarded to the NRC on February 10, 1986. Detroit Edison has committed to implement corrective. action with respect to the six recommendations contained in the report and also to address the concerns iden-

! tified by the IOC as the underlying factors which are the basis for the committee's recommendations. The IOC also will review the Reactor Operations Improvement Plan, evaluate performance

against that plan, advise about the company's plans to restart Fermi 2, evaluate plant operations, and make recommendations to management about increasing reactor power beyond five percent.

i In addition to establishing-the IOC, Detroit Edison has made a number of significant changes in its management struc-

ture. Mr. McCarthy, as Chief Executive Officer and Chairman of l the Board, has taken direct responsibility for'the safe opera-tion of the Fermi 2 plant. A new Vice President, Nuclear Oper-

!' ations reports directly to Mr. McCarthy. The company is ac-1 tively seeking additional senior management candidates with commercial nuclear experience from outside the company.

Mr. McCarthy has directed Charles M. Heidel, President and

! Chief Operating Officer, to assist him in monitoring the per-formance of Nuclear Operations; the Nuclear Quality Assurance organization reports directly to Mr. Heidel in this regard.

)

ii

SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNER $Mf p eNCLUDeNG PROFES$6CN AL CORPORATIONS Mr. James G. Keppler March 28, 1986 Page 14 The Nuclear Engineering and Nuclear Production departments are developing additional methods and procedures to.further clarify responsibilities and work priorities and to better im-prove communications. Management systems and practices are being reviewed and evaluated to assure better planning, coordination and completion of work activities. Similarly, plant maintenance activities are being reviewed with special attention on post-maintenance test requirements and methods for removing and placing into service critical. plant equipment. A Security Improvement Plan has been developed, and on January 17, 1986, the major elements of the plan were presented' to the NRC Staff. The plan seeks to improve the security pro-gram by correcting adverse trends, clarifying security respon-sibilities, improving personnel understanding of the security plan and implementing procedures, and implementing a management system to track required surveillances.

Taken together, these initiativos by Detroit Edison, as more fully described in correspondence and meetings with the NRC Staff, provide an aggressive plan for correcting past prob-lems and maintaining operations at Fermi 2 at the highest lev-els of safety. The program is responsive both to the specific problems identified by the NRC Staff and to the underlying fac-tors which have caused the problems. . Substantial resources both within and outside the company are being brought to bear to better assure'the success of the program.

Significantly, in its petition SECOM presents no facts and no serious argument as to why these corrective actions will not be adequate to ensure the public health and safety. SECOM no-where addresses the Reactor Operations Improvement Plan or the Independent Overview Committee. In essence, SECOM's argument is that there have been problems at the Fermi 2 plant and no amount of corrective action can be sufficient to assure safe operation in the future.*/ That claim is reckless and without any factual support. It is inconsistent with the fundamental objective of NRC enforcement policy which is that violations of requirements should be followed by corrective actions aimed at avoiding similar violations in the future. In short, SECOM

  • / Indeed, the SECOM representative who addressed the Commis-sion at its March 12, 1986 briefing on Fermi 2 readily conceded that in the group's view "this plant can never operate safely" and that SECOM " object [s] to the technology being used to gen-erate electricity" at Fermi 2. Transcript at 45.

r --

. s .

SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNERS ** 7 sNCLUDtNG FROFESSIONAL CORPCRAiroNS Mr. James G. Keppler March 28, 1986 Page 15 offers no constructive criticism of Detroit Edison's broad-based improvement plans.

V. Evaluation of the SECOM Petition Detroit Edison's belief that the SECOM petition seeking show cause proceedings should be denied rests on two fundamen-tal propositions.

First, the Fermi 2 plant has been subject to intensi"a NRC scrutiny during the past nine months which has disclosed a num -

ber of problem areas. The SECOM petition merely repeats back to the NRC findings disclosed by the company or matters already known to the NRC. In such circumstances, a show cause proceed-ing to review yet again what already has been disclosed as a result of ongoing NRC inspection and enforcement proceedings is unnecessary and inappropriate.

Second, Detroit Edison has responded promptly and force-fully to the identified deficiencies. The improvement plans currently being developed and implemented are intended to en-sure that past problems have been corrected and to minimize the likelihood that future problems will arise. SECOM offers no credible reason for challenging these conclusions and the NRC can itself properly assess the adequacy of Detroit Edison's corrective actions without convening a show cause proceeding.

The review of the NRC inspection and enforcement program set forth in Section III above and the description of the Detroit Edison improvement plans set forth in Section IV above fully support the conclusions just drawn. We briefly respond to SECOM's five " allegations" below.

1. Lack of " elevated" enforcement action by the NRC.

Contrary to SECOM's allegations, the NRC has intensively in-spected operations at the Fermi 2 plant and has taken aggres-sive enforcement action against Detroit Edison. No legitimate enforcement policy would now be served by initiating a show cause proceeding that would be a mere rehash of already com-pleted NRC inspection activities. Nor has SECOM in any way supported the need for the type of " elevated" enforcement ac-tion -- i.e., license revocation or suspension -- that it oug-gests.

. s a SHAW, PITTMAN. PoTTs & TROWBRIDGE A PARTNERSMiP INCLUDtNG PROFESS ONAt CORPORATIONS Mr. James G. Keppler March 28,.1986 Page 16

2. Lack of Detroit Edison management controls. Detroit Edison recognizes that management performance at Fermi 2 could and should have been better. But that alone is no reason to initiate a show cause proceeding. The company has expended substantial resources to identify the problems, develop improvement programs, and implement the necessary corrective actions. Region III has reviewed Detroit Edison's initiatives and believes that if properly implemented they will be suffi-cient to correct the identified problems.
3. Willful violation of NRC requirements. SECOM's claim that Detroit Edison has willfully violated NRC requirements by showing a careless disregard for those requirements is nothing more than a bald, unsupp3rted statement. SECOM can marshal no facts or even argument t support such a conclusion. The claim is refuted by an unbiased review of Detroit Edison's entire en-forcement history. NRC evaluations of the company, like those in the SALP 5 and 6 Reports confirm this fact. The quantita-tive performance factors now being tracked by the company also confirm that the company does not have a careless diaregard for NRC requirements. In any event, there is no need to convene a

- show cause proceeding to determine if Detroit Edison has acted willfully. That could be determined without hearing on the basis of the facts alleged by SECOM.

4. Inability of Detroit Edison to comply with NRC requirements. While recognizing that past performance at the Fermi 2 plant can,be improved. it is totally incorrect to con-clude that the problems experienced at the plant demonstrate a total inability to comply with NRC requirements. The special operational readiness review conducted by the NRC in August. and September 1985 found no violation of NRC requirements. The routine inspection during December 1985 similarly found no vio-lations. SECOM's argument clearly overstates the record and is without any factual support.
5. Detroit Edison's improvement plans are inadequate.

The sole support for this claim are selected bits-and-pieces of third-party audits of Detroit Edison conducted during the construction phase of the Fermi 2 project. This provides no basis for concluding that the substantial corrective actions now being undertaken by Detroit Edison will be inadequate to resolve the identified problems. SECOM nowhere addresses 'any specific pcrt of Detroit Edison's improvement plans and identifies not a single weakness in the plans. The NRC can effectively monitor the implementation of the improvement plans

. .. O SHAw, PITTM AN, PoTTs & TROWBRIDGE A PARTNERSMIP INCLUDING PROFESSIONAL CORPORAT*ONS Mr. James G. Keppler March 28,.1986 Page 17 and determine for itself whether they are adequate to correct the problems. In such circumstances, little purpose would be served by instituting a show cause proceeding to duplicate this Staff effort.

For all the foregoing reasons, the SECOM petition seeking the commencement of show cause proceedings should be denied.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE Gerald Charnoff V Robert E. Zahler Counsel for The Detroit Edison Company cc: James M. Taylor (Director, NRC Office of Inspection and Enforcement)

Harold R. Denton (Director, NRC Office of Reactor Regulation)

Chief, NRC Docketing and Service Branch Ms. Jennifer Puntenney (Safe Energy Coalition of Michigan)

!