Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20153G3141998-06-29029 June 1998 Transcript of 980629 Public Meeting Re Peach Bottom Unit 1, Decommissioning Status in Delta,Pa.Pp 1-65.Reporter Certificate Encl ML20249B9981998-06-22022 June 1998 Exemption from Requirements of 10CFR70.24 Re Criticality Accident Requirements. Exemption Authorized ML20247M8801998-05-19019 May 1998 Confirmatory Order Modifying Licenses Effective Immediately. PECO Energy Co Shall Complete Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G0321998-03-0404 March 1998 Comment Re Draft RG DG-1071, Std Format & Content for Post- Shutdown Decommissioning Activities Rept. Recommends That Draft RG Be Revised to Accommodate Situations Similar to That Described for Unit 1 ML20198J0931997-12-18018 December 1997 Order Approving Application Re Merger Between Atlantic Energy Inc,& Delmarva Power & Light Co ML20113C6631996-06-24024 June 1996 Comments on Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20115H7061996-06-0404 June 1996 Submits Addl Info to Support Petition for Rulemaking PRM-72-3 Re Amend to SAR ML20083N3971995-04-26026 April 1995 Comment Supporting Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20083C1191995-04-25025 April 1995 Exemption from Requirements of Sections III.D.2(a) & III.D.3 of App J to 10CFR50,which Requires That Type B & C Tests Be Performed During Each Reactor Shutdown for Refueling ML20081B3811995-03-0101 March 1995 Comment Supporting Proposed Suppl 5 to GL 88-20, IPEEE for Severe Accident Vulnerabilities ML20078P9331994-12-0707 December 1994 Exemption Granted from Requirements of 10CFR73.55 Re Returning of Picture Badges Upon Exit from Protected Area Such That Individuals Not Employed by Licensee May Take Picture Badges Offsite ML20073H9821994-09-30030 September 1994 Exemption Granted from Requirements of 10CFR50,App J, Section III.D.1(a) to Perform Type a Tests at Approx Equal Intervals & within 10-yr Svc Period ML20071H0521994-07-0505 July 1994 Exemption from Application of 10CFR50,App J,Sections III.D.2(a) & III.D.3,extending Testing Intervals to Allow Testing to Be Performed During Unit 2 Cycle 10 Refueling Outage ML20059L3201993-11-24024 November 1993 Exemption from Training Requirements of 10CFR50.120 Re Establishment,Implementation & Maintenance of Training Program ML20126F2721992-12-21021 December 1992 Comment Endorsing Positions & Comments of NUMARC & BWROG Re Draft GL, Augmented Inservice Insp Requirments for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20086U1571991-12-26026 December 1991 Exemption Granting One Time Schedular Exemption to Eight SROs Limited to Fuel Handling,To Take First Annual Requalification Operating Test During Jan 1992 Instead of End of 1991 ML20006D3821990-02-0606 February 1990 Comment on Proposed Rule 10CFR2 Re Policy & Procedures for Enforcement Actions;Policy Statement.Util Uncertain as to Whether Changes Necessary ML20006A7871989-08-0707 August 1989 Comment on NUREG-1150, Severe Accident Risks:Assessment for Five Us Nuclear Power Plants. Notes Numerous Places in Rept Where Conclusions Stated or Implied Which Conflict W/Results of Previous Analyses ML20247B6151989-07-19019 July 1989 Memorandum & Order.* Grants Commonwealth of PA Motion Requesting Order Confirming Commonwealth Withdrawal of Petition to Intervene & Proposed Contentions & Terminating Proceeding.W/Certificate of Svc.Served on 890720 ML20246N8071989-06-30030 June 1989 NRC Staff Fourth Status Rept Re Settlement Agreement.* NRC Responded to Agreement,Per Encl ,Advising Licensee That NRC Has No Objection to Agreement Between Licensee & Commonwealth of Pa.W/Certificate of Svc ML20246P2951989-06-29029 June 1989 Notice of Withdrawal & Motion to Terminate Proceeding.* Withdraws 880122 Petition to Intervene & Requests Termination of Proceeding,Per Agreement Between Parties Re Licensee Commitment to Take Actions.W/Certificate of Svc ML20248B4631989-06-0101 June 1989 NRC Staff Third Status Rept Re Settlement Agreement.* Final Agreement Being Prepared,Per 890428 Meeting Resolving Outstanding Issues.W/Certificate of Svc ML20245J2331989-04-28028 April 1989 NRC Staff Second Status Rept Re Settlement Agreement.* Next Status Rept Will Be Filed by 890601.Certificate of Svc Encl ML20247B0641989-04-17017 April 1989 Transcript of 890417 Discussion/Possible Vote in Rockville, MD Re Plant Restart.Pp 1-64.Viewgraphs Encl ML20247A2971989-04-0404 April 1989 Comment Supporting Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants ML20246P6921989-04-0404 April 1989 Requests Party Brief on Support of Appeal of Denial of FOIA Request Re Records of Investigation Into Events Surrounding 870331 Shutdown of Plant ML20248F5411989-03-31031 March 1989 NRC Staff Status Rept Concerning Settlement Agreement.* NRC Informed Commonwealth of PA & Util of Certain Concerns Noted in Review of Settlement Documents Forwarded by .W/Certificate of Svc ML20247A8861989-03-27027 March 1989 Memorandum & Order.* Stays Util Obligation to Respond to Contentions,Per Ongoing Settlement Discussions Between Util & Commonwealth of Pa.Monthly Status Rept Requested.W/ Certificate of Svc.Served on 890327 ML20247A6541989-03-24024 March 1989 Philadelphia Electric Co consented-to Motion to Stay Responses to Commonwealth of PA Proposed Contentions.* Requests That ASLB Stay Util Obligation to Respond to Commonwealth of PA 880824 Contentions.W/Certificate of Svc ML20236B4551989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Peach Bottom Restart.Pp 1-129 ML20236B4001989-03-0808 March 1989 Transcript of ACRS GE Reactor Plants Subcommittee 890308 Meeting in Bethesda,Md Re Plant Restart.Pp 130-280. Supporting Documentation Encl ML20235N2611989-02-21021 February 1989 Philadelphia Electric Co consented-to Motion for 30-day Extension to Respond to Commonwealth of PA Contentions.* Requests That Deadline for Response & NRC Response to 880824 Contentions Be Extended by 30 Days.W/Certificate of Svc ML20235J5451989-02-0606 February 1989 Transcript of 890206 Briefing in Rockville,Md Re Status of Plant.Pp 1-49.Supporting Info Encl ML20206L6081988-11-18018 November 1988 Exemption from Schedular Requirements of 10CFR50.54(w) Re Property Insurance Required to Be Carried by Reactor Licensees ML20205R4041988-11-0404 November 1988 Order.* Grants Applicant 881103 Unopposed Motion for 45-day Extension of Time to Respond to Commonwealth of PA Contentions.Served on 881107 ML20205R8161988-11-0303 November 1988 PECO consented-to Motion for 45-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20205Q2061988-10-28028 October 1988 Comment Opposing Petition for Rulemaking PRM 50-52 Re Exemption of Financial Qualifications of Applicants from Review of OL Applications.Petition Presents No Compelling Reason to Amend Current Rules ML20195E6501988-10-24024 October 1988 Comment Supporting Petition for Rulemaking PRM 50-52 Re NRC Reinstatement of Financial Qualifications of Util as Consideration in Operating Licensing Hearings for Electric Utils ML20155F1681988-10-0505 October 1988 Transcript of 881005 Public Meeting in Rockville,Md Re Status of Plant.Pp 1-56.Viewgraphs & Notes Encl ML20155E8931988-10-0303 October 1988 Comment on Proposed Rule 10CFR50.54(w)(5)(i) Re Amending Implementation Schedule for Stabilization & Decontamination Priority & Trusteeship Provisions of Property Insurance Regulations.Nrc Initiated Exemptions Expected Before 881004 ML20154R6491988-09-25025 September 1988 Requests Extension of Comment Period on Proposed Rule 10CFR52 Re Reactor Licensing ML20153H6781988-09-0202 September 1988 Order.* Grants Applicant Unopposed Motion for 60-day Extension of Time to Respond to Commonwealth of PA Contentions.Nrc Also Granted Extension of Time.Served on 880906 ML20153H6901988-09-0101 September 1988 Philadelphia Electric Co Consented to Motion for 60-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20153D0451988-08-24024 August 1988 Supplement to Petition & Statement of Contentions of Commonwealth of Pa.* Requests That Board Grant Petition to Intervene & Request for Hearing on Contentions.Certificate of Svc Encl ML20151U7821988-08-10010 August 1988 Order Modifying License DPR-44,DPR-56,NPF-39 & CPPR-107 for Violations Involving Licensed Operators Sleeping in Control Room,Reading Matls Not Directly Job Related & Otherwise Inattentive to Obligations of License ML20247N7531988-07-28028 July 1988 Petition for Rulemaking PRM-50-53 Requesting NRC Action to Review Undue Risk Posed by BWR Thermal Hydraulic Instability.Nrr Should Issue Order Requiring All GE BWRs to Be Placed in Cold Shutdown for Stated Reasons ML20151G0031988-07-19019 July 1988 Comment on Proposed Rule 10CFR50 Re Cooperation W/States at Commercial Nuclear Power Plants & Other Facilities. Suggests Rev to Policy to Grant Same Rights & Responsibilities to All States within 10 Miles of Plant ML20195D1681988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Commonwealth of PA Requests That Board Grant Addl Extension of Time Until 880824 for Filing of Contentions.Granted for Licensing Board.Served on 880621 ML20196B4521988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Granting of Addl Extension of Time of 60 Days Until 880824 for Filing of Contentions in Matter Requested. W/Certificate of Svc ML20196B9211988-06-0808 June 1988 Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations 1998-06-29
[Table view] Category:PLEADINGS
MONTHYEARML20246P2951989-06-29029 June 1989 Notice of Withdrawal & Motion to Terminate Proceeding.* Withdraws 880122 Petition to Intervene & Requests Termination of Proceeding,Per Agreement Between Parties Re Licensee Commitment to Take Actions.W/Certificate of Svc ML20247A6541989-03-24024 March 1989 Philadelphia Electric Co consented-to Motion to Stay Responses to Commonwealth of PA Proposed Contentions.* Requests That ASLB Stay Util Obligation to Respond to Commonwealth of PA 880824 Contentions.W/Certificate of Svc ML20235N2611989-02-21021 February 1989 Philadelphia Electric Co consented-to Motion for 30-day Extension to Respond to Commonwealth of PA Contentions.* Requests That Deadline for Response & NRC Response to 880824 Contentions Be Extended by 30 Days.W/Certificate of Svc ML20205R8161988-11-0303 November 1988 PECO consented-to Motion for 45-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20153H6901988-09-0101 September 1988 Philadelphia Electric Co Consented to Motion for 60-day Extension to Respond to Commonwealth of PA Contentions.* Certificate of Svc Encl ML20196B4521988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Granting of Addl Extension of Time of 60 Days Until 880824 for Filing of Contentions in Matter Requested. W/Certificate of Svc ML20195D1681988-06-17017 June 1988 Motion for Third Extension of Time in Which to File Contentions.* Commonwealth of PA Requests That Board Grant Addl Extension of Time Until 880824 for Filing of Contentions.Granted for Licensing Board.Served on 880621 ML20197E1071988-05-25025 May 1988 Second Motion for Extension of Time in Which to File Contentions.* Served on 880525.Granted for ASLB on 880520 ML20154H7821988-05-19019 May 1988 Second Motion for Extension of Time in Which to File Contentions.* Requests Extension for Filing Until 880620 Due to Continued Discussions Between Util & Commonwealth of Pa. Certificate of Svc Encl ML20151T4841988-04-22022 April 1988 Request for Extension of Time in Which to File Contentions & Supplement to Petition to Intervence & Request for Hearing.* Thirty-day Extension Sought for Listed Reasons. Certificate of Svc Encl ML20147B9941988-02-0808 February 1988 Comments Opposing Petition of Commonwealth of PA to Intervene & to Request Hearing in Proceeding on Proposed Amends to Ols.Util Concurs W/Nrc That Amends Raise Nshc. Certificate of Svc Encl ML20151Q1941987-11-20020 November 1987 Commonwealth of PA Petition for Hearing.* Petition for Public Hearing to Consider Safety Problems & Contemplated Licensing Changes Involved in Commission Proceedings Re Plant Requested ML20151Q2351987-11-20020 November 1987 Commonwealth of PA Petition for Hearing.* Public Hearing to Consider Safety Problems & Contemplated Licensing Changes Requested ML20028C9131983-01-11011 January 1983 Answer Opposing Environ Coalition on Nuclear Power & Other Intervenor 821227 Petition for Review of ALAB-701.Petition Amounts to Simple Disagreement on Witness Qualification & Raises No Important Issues.Certificate of Svc Encl ML20028C8951983-01-11011 January 1983 Answer Opposing Citizens for Safe Environ & Environ Coalition on Nuclear Power 821227 Petition for Review of ALAB-701.Reliance on Perkins Record for Determining Health Effects of Radon Releases Correct.Certificate of Svc Encl ML20028D0361983-01-10010 January 1983 Motion for Recusal of Commissioner Palladino from Consideration of Radon Issue Due to Possible Bias. Certificate of Svc Encl ML20040E2911982-02-0101 February 1982 Answer Opposing Intervenors Response to ALAB-654.ASLAB Should Adopt Findings of Perkins Case.Intervenors Failed to Proffer Any Evidence That Radon Releases Will Produce Significant Environ Impacts.Certificate of Svc Encl ML20040E4011982-02-0101 February 1982 Reply to Intervenor Response to ALAB-654.ASLAB Should Determine That De Minimis Approach Adopted in Perkins Case Was Correct & Health Effects from Radon Releases Are Negligible ML20032D8691981-11-0606 November 1981 Request for 60-day Period for Responding to ALAB-654 to Run from 811106,day Following Receipt of Notification That Commission Declined Review.Certificate of Svc Encl ML19344E2491980-08-22022 August 1980 Request for Free Hearing Transcripts Per 800725 Fr Notice Re Procedural Assistance Change in Adjudicatory Licensing Proceedings Necessary for Further Procedural Involvement. Certificate of Svc Encl ML19327A1881980-07-23023 July 1980 Motion for Leave to File Out of Time to NRC Proposed Findings of Fact & Conclusions of Law.Intervenors Representative Was Out of Town.Certificate of Svc Encl ML19327A1981980-07-23023 July 1980 Response to NRC Reply Brief.Adopts Ecology Action of Oswego Reply to NRC Proposed Findings of Fact.Suppls Matls w/13 Paragraphs Re Sealing Techniques in Underground Mines & Other Methods of Reducing Radon Emissions ML19327A1951980-07-22022 July 1980 Response in Opposition to NRC Motion to Include Health Effects in Proposed Findings of Fact Re Magnitude of Radon Emissions.Kepford 790626 Affidavit Must Be Adopted.Response Joined by Ecology Action of Oswego.Certificate of Svc Encl ML19330B4821980-07-18018 July 1980 Response to Ecology Action of Oswego & Environ Coalition on Nuclear Power Proposed Findings of Fact & Conclusions of Law Re Emissions from Mill Tailings Piles & Water Pathways. Certificate of Svc Encl ML19330B4091980-07-18018 July 1980 Response to Other Parties Positions Re Effect of NUREG/CR- 1273 on ALAB-562 Disposition of Deficiency 1.New Estimates of Rn-222 U Mine Emissions More Reliable than Perkins Record.Deficiency re-examination Unwarranted ML19327A2181980-07-18018 July 1980 Response in Opposition to NRC 800703 Motion to Include Findings of Health Effects in Proceeding.Aslab Presently in Position to Reach Issue & Resolve Radon Question.Aslab Should Decide De Minimus Issue ML19327A2311980-07-18018 July 1980 Response to Aslab 800307 Order Requesting Position Re Whether Disposition of Alleged Deficiency 1 in ALAB-562 Has Been Affected by NUREG/CR-1273.Better Estimates of Radon Emissions Do Not Require re-examination of Disposition ML19327A2321980-07-18018 July 1980 Response to NRC 800703 Motion to Include Health Effects Findings.Urges Aslab to Make Findings Re Radon Emissions Level.Requests Application of De Minimus Theory to Exclude Insignificant Environ Impacts.Certificate of Svc Encl ML19330B2121980-07-16016 July 1980 Response in Support of NRC 800703 Pleading Asserting Validity of Perkins Record on Radon Releases from U Mining & Milling.Objects to NRC Position Eliminating Health Effects Issues from Consideration.Supporting News Articles Encl ML19318D1521980-07-0303 July 1980 Motion to Include De Minimus Theory of Health Effects in NRC 800703 Findings of Fact & Conclusions of Law Presented in Form of Memorandum & Order.Inclusion Is Consistent w/ALAB- 509,ALAB-540 & ALAB-562.Certificate of Svc Encl ML19318D1991980-06-20020 June 1980 Response to Aslab Request Re Deficiency 1.Urges Reversal of Decision Rejecting Deficiency Re Correlation Between U Mine Radon Releases & Amount of U Fuel.Portion of Perkins Decision Re Correlation Must Be Vacated ML19317H4541980-05-23023 May 1980 Response to Intervenors,York Committee for Safe Environ & Citizens for Safe Environ Request for Extension Until 800618 to File Proposed Findings of Fact in Generic Radon Proceeding.Many Delays in Proceeding Are Cause for Concern ML19317H4431980-05-20020 May 1980 Request for Extension Until 800618 for Parties,Except Nrc,To Submit post-hearing Memoranda Re Radon Issue.Record Lengthy & Intervenors Have Other Commitments Made Prior to Feb 1980. Certificate of Svc Encl ML19263F0031979-06-27027 June 1979 Opposes Utils Joint Motion for Summary Disposition & NRC Motion for Partial Summary Disposition on Radon Emissions. Radon Emissions Endanger Public Health.Adopts Intervenor Ecology Action of Oswego Concurrent Filing ML19225A0561979-06-14014 June 1979 Responds to Utils Motion for Summary Disposition Re Radon issues.Twenty-one Alleged Deficiencies in Perkins Record Advanced by Intervenors Are Supported in Part & Opposed in Part.Certificate of Svc Encl ML19224B7951979-05-25025 May 1979 Statement of Matl Facts Re Radon Proceedings,For Which There Is No Genuine Issue to Be Heard.Discusses Alleged Deficiencies 1-7,9-18,20-24 & 26.Affidavit of Mi Goldman & Supporting Documentation Encl ML19224B7931979-05-25025 May 1979 Request by Utils That Aslab Grant Summary Disposition of All Issues in Consolidated Radon Proceeding.Utils Seek Decision as Matter of Law;No Genuine Issue as to Matl Facts ML19273B9911979-05-0202 May 1979 Motion for Reconsideration of ALAB-540 & Severence from Consolidation Established by ALAB-540.Admits Issues Not Raised by Any Party & Departs from Lead Case Procedure Previously Adopted.Certificate of Svc Encl ML19220C8111979-04-11011 April 1979 Response to 790404 Brief of Philadelphia Electric Co,Public Svc Electric & Gas,& Atlantic City (Nj) Electric Co Re De Minimus Theory.Certificate of Svc Encl ML19220C6681979-04-11011 April 1979 Response to ALAB-509 Re Radon Emissions & De Minimus Theory from Perkins Record.Certificate of Svc Encl ML19289F8931979-04-0202 April 1979 Motion for Extension Until 790411 to Prepare Response to ALAB-509.Granted for Appeal Board on 790403 ML19224A1341978-09-15015 September 1978 NRC Answer to Intervenors 780727 Joint Filing to Receive Further Evidence on Radon Issue.Requests Adoption of Findings of Aslab on Radon Emissions & Health Effects ML19224A1111978-08-21021 August 1978 Intervenors Response to NRC 780809 Motion.Objects to Extension of 14-day Response Period Re ALAB-480;ample Time Available to NRC for Negotiation ML19206A2701978-08-0909 August 1978 Request for Extension Until 780929 in Which to Respond to Intervenors 780727 Joint Filing.Also Seeks Deferral of Time to File Memo Re Effect of Alab 480.Certificate of Svc Encl ML19338C1101976-10-22022 October 1976 Responds to NRC 761013 Directive Re Suspension of Show Cause Proceedings on Fuel Cycle Issues.Supports Suspension in View of Court Staying Mandate,Notice of Proposed Rulemaking Issuance & Environ Survey Suppl.Certificate of Svc Encl 1989-06-29
[Table view] |
Text
_ +.
x.
6/S b UMm O
Q
%:mza S_M, APR 23 ;ggO5 UNITED STATES OF AMERICA 11 NUCLEAR REGULATORY tymuTSSION
-l o
I ATOKIC SAFETY AND LICENSING BOARD Pj' Cut C
Before Fi=inistrative Judges m
John H. Frye, III, Chairman Glenn O. Bright Richard F. Cole In the Matter of Oocket Nc,s. 50-277-OLA 50-278-OLA Philadelphia Electric Company :
ASLBP No. 88-569-06-OLA (Peach Bottom Atomic Power Station, Units 2 and 3)
Request for an Extension of Time in which to File Contentions and Supplement to Petition to Intervene and Request for a Hearina The Commonwealth of Pennsylvania (hereinafter "Commonwealth"), by and through its attorneys, requests that the Atomic Safety and Licensing Board (hereinafter "Board") grant a thirty (30) day extension for the Commonwealth to file its contentions and supplement to Petition to Intervene and Request for a Hearing.
As indicated in more detail in paragraph 18, counsel for the Philadelphia Electric Company (hereinafter "PECO") does not object to the extension.
In support of this request the Commonwealth states the following:
1.
On. December 23, 1987 the Nuclear Regulatory Commission (hereinafter "Commission") published a Notice of Opportunity for Hearing with respect to the Commission's proposed issuance of amendments to the licenses held by PECO for the Peach Bottom 1
880429004o eso422 PDR ADOCK 05000277 0
PDR 9
D
)S
~
n.
g.-
w,-
e
- ~ -
Atomic Power Station, Units No. 2 and No. 3 (hereinafter "Peach Bottom").
52 F.R.
48693 (December 23, 1987).
2.
The Commonwealth filed a Petition to Intervene, Request for Hearing and Comments Opposing No Significant Hazards Consideration on January 22, 1988.
The Petition, inter alia, requested a hearing under 10 C.F.R. S2.714 concerning the proposed amendments to the facility operating license of PECO for Peach Bottom.
i 3.
An important concern set forth in the Petition was the
)
Commonwealth's belief that the top corporate management at PECO was inappropriately deflecting responsibility for the problems at Peach Bottom, and therefore, was failing to propose satisfactory changes in its corporate structure.
4.
In a letter dated January 11, 1988, the Institute of Nuclear Power Operations (hereinnfter "INPO") provided a Report to PECO which was highly critical of PECO's operation and management of Peach Bottom.
5.
On February 8, 1988, PECO filed an Answer to the Commonwealth's Petition.
6.
On February 11, 1988, the Nuclear Regulatory Commission Staff (hereinafter "NRC Staff") filed a Response to Commonwealth of Pennsylvania's Petition to Intervene and Request for Hearing.
In the Response the NRC Staff concluded that "the Commission 2
m,n
~
should find that the Commonwealth has established its standing to intervene and has identified at least one aspect of the proposed amendment request in which it is interested."
7.
After a special meeting of PECO's Board of Directors on February 1, 1988 to consider the INPO Report, PECO announced several changes in the highest levels of corporate management at PECO.
The INPO Report and the Commonwealth's Petition were critical of the corporate management of PECO for its actions regarding Peach Bottom.
8.
On March 28, 1988, the Commonwealth met with William T.
Russell, NRC Administrator for Region I, and his staff to review the status of various matters involving Peach Bottom, the Commonwealth and the Commission.
9.
On April 1, 1988, the Commission issued an order in response to the Commonwealth's Petition to Intervene and Request for a Hearing.
The order, inter alia, referred the matter to the Chairman of the Atomic Safety and Licensing Board Panel for a Licensing Board to consider whether the Commonwealth petition to intervene should be granted in accordance with the notice and the order.
10.
On April 6, 1988, an Atomic Safety and Licensing Board was established to preside over the proceeding.
The Board was designated, pursuant to the Commission's Order issued on April 1, 1988, to consider the issues arising from the proposed issuance of amendment to the licenses held by PECO for Psach Bottom.
3
_. _.,.=
-_- y
_ m y
11.
On April 8, 1988, John H. Frye, III, Chairman, Administrative Judge, Atomic Safety and Licensing Board Panel, issued a Memorandum and Order (Setting a Deadline for Filing of Contentions).
The Memorandum and Order established a deadline of April 25, 1988 for the filing of the Commonwealth's contentions and any amendment it may wish to make to its petition.
12.
In a letter dated April 6, 1988, Lando W.
Zech, Jr.,
Chairman of the Commission responded to Governor Robert P.
Casey's letter of February 4, 1988.
Chairman Zech declined to establish a discretionary, formal adjudicatory proceeding to consider matters involving Peach Bottom which the Commission believes are beyond the scope of the proposed license amendment which was requested.
13.
In a letter dated April 8, 1988 PECO submitted a revised Restart Plan,Section I and II.
According to the letter, the Restart Plan was revised after and as a result of the corporate management changes at PECO related to the Peach Bottom l
situation.
14.
In response to a request from the Commission, the Commonwealth has recently agreed to jointly host public meetings to receive public comments on PECO's revised restart plans for Peach Bottom.
The meetings are tentatively scheduled for May 16 l
and 17, 1988.
Public comments will be received regarding all issues raised by the revised plans and not merely issues raised by the proposed license amendments.
4 I
l
g,.
- s _.-
w, 4
15.
The Commonwealth requires additional time to prepare its contentions and any amendments which it may wish to make to its petition in light of the recent management changes at PECO and the submission of the revised Restart Plan.
Both of these new developments have a bearing on the proposed license amendments and the Commonwealth's Petition.
16.
The Board has the authority under 10 C.F.R.
S2.714(b),
based upon a balancing of the factors in paragraph 2.714(a)(1),
to grant additional time to file contentions.
17.
Pursuant to 10 C.F.R.
S2.714(b), the Commonwealth avers that (1) it has good cause for the request for an extension; (2) there is no other means to protect its interest; (3) the extension is reasonably expected to assist in developing a sound record; (4) the Commonwealth's interest is not represented by any other party; and (5) the extension will allow the Commonwealth to better focus on the issues, in light of the recent developments, and should ultimately prevent delay in the proceeding.
18.
Counsel for the Commonwealth and for PECO have conferred on the Commonwealth's Request, and the Commonwealth is authorized to state that PECO has no objection to the relief l
which the Commonwealth has requested.
In light of the foregoing the Commonwealth requests a thirty (30) day extension in which to file its contentions and i
l l
5
m-.
_n
=.
7,
.,-._g-amendments to its petition, if any, from the deadline established in the Board's April 8, 1988 Order.
For The Commonwealth of Pennsylvania Department of Environmental Resources
/
TIMOTHY D.' SEARCHINGER Deputy General Counsel RICHARD P. MATHER THOMAS Y. AU Assistant Counsel Room 505 Executive House P.O. Box 2357 Harrisburg, Pennsylvania 17120 (717) 787-7060 Dated:
6
y m.
.c,-
w_-
3, 5~ih 4
qq N
s UNITED sTATas Or AuxRICA NUCLEAR RacnATORY COuxIssIon APR 22 W"E '
ATOMIC SAFETY AND LICENSING BOARD k, c=tocav.f.
/.c.
- at...,
Y Before Ni=inistrative Judges
'/pb{/
John H. Frye, III, chairman j
Glenn O. Bright Richard F. Cole In the Matter of a
Docket Nos. 50-277-OLA Philadelphia Electric Company :
ASLBP No. 88-569-06-OLA (Peach Bottom Atomic Power Station, Units 2 and 3)
Certificate of Service I hereby certify that copies of the Commonwealth's "Request for an Extension of Time in which to File Contentions and Supplement to Petition to Intervene and Request for a Hearing" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, this 22nd day of April, 1988:
Samuel J. Chilk George C. Freeman, Jr., Esq.
Office of the Secretary Donald P.
Irwin, Esq.
U.S. Nuclear Regulatory Comm.
Hunton & Williams Washington, D.C.
20555 707 East Main Street P.O. Box 1535 Docketing and Service Section Richmond, Virginia 23212 Office of the Secretary U.S. Nuclear Regulatory Comm.
William T. Coleman, Esq.
Washington, D.C.
20555 John H.
Beisner, Esq.
O'Melveny & Meyers Atomic Safety & Licensing 555 - 13th Street, b.W.
Board Panel Washington, D.C.
20004 i
U.S. Nuclear Regulatory Comm.
Washington, D.C.
20555
w _v--
- - :_~ = w,, m.w e:: _-
n-
)
e John H. Frye, III, Chairman E. G. Bauer, Jr.
Atomic Safety & Licensing Board Philadelphia Electric Company U.S. Nuclear Regulatory Comm.
2301 Market Street Washington, D.C.
20555 Philadelphia, PA 19101 Glenn O. Bright Ann P. Hodgdon Atomic Safety & Licensing Board Counsel for NRC Staff j
U.S. Nuclear Regulatory Comm.
U.S. Nuclear Regulatory Comm.
l Washington, D.C.
20555 Washington, D.C.
20555 Richard F. Cole Jay Gutierrez Atomic Safety & Licensing Board Regional Counsel U.S. Nuclear Regulatory Comm.
U.S. Nuclear Regulatory Comm.
Washington, D.C.
20555 475 Allendale Road King of Prussia, PA 1940G Atomic Safety & Licensing Appeal Board Panel U.S. Nuclear Regulatory Comm.
Washington, D.C.
20555
/
,?/
2Wsuo RIdHARD P. MATIIER
'~
~'
Assistant Counsel Room 505 Executive House P.O. Box 2357 Harrisburg, Pennsylvania 17120 (717) 787-7060 Dated l
l
_ _ _ _ _ _ _ _ _ _ _ _ _