ML20196B921

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20196B921
Person / Time
Site: Peach Bottom, Limerick, 05000000
Issue date: 06/08/1988
From: Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-00592, 53FR16435-592, NUDOCS 8806300404
Download: ML20196B921 (1)


Text

-

DOCKET NUMBER pg

.DPOSE0 ROLE ._

gg

($$v LS3 ft i; 425)

PHILADELPHIA ELECTRIC COMPAflY g.iig '-

2301 MARKET STREET P.O. BOX C699 g g jQ gQ $3 PHILADELPHIA. PA.19101 10 CFR 50.74(d) 12 m e 4 i 4 qpie .. 2.<

vF ' 5 ,,,"

June 8, 099859'LN&j Wi-Docket Nos. 50-277 50-278 50-352 50-353 Secretary of the Commission Attention: Docketing & Service Branch U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station Units 2 and 3 Limerick Generating Station Units 1 and 2 Emergency Planning and Preparedness Requirements for Nuclear Power Plant Fuel Loading and Initial Low-Power Operations

Dear Secretary:

Philadelphia Electric Company supports the proposed rule change to 10 CFR 50.47(d) clarifying emergency planning prerequisites for fuel loading and low power operations as specified in the Federal Register, Volume 53, No. 89, May 9, 1988.

This proposed change: (1) is in the best interest of ensuring station and public health and safety during fuel loading and initial low power operation of a nuclear power plant, and (2) establishes clear emergency planning standards and direction for licensees during the licensing process. i 1

us. If you have any questions, please do not hesitate to contact Ver truly rs, I y ,] v

  • R. H. Logue 1 Assistant Manager l Nuclear Support Division l

l 880600 8806300404 PR IfidW35 PDR 5

O s /o