MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20134L1081996-10-10010 October 1996 Part 21 Rept Re Defect in Component of Nordberg Model FS1316HSC Sdg.Nak Engineering,Inc Has Established & Adopted Procedures to Assemble Fuel Oil Lines & Climinate Possible Defective Condition ML20116H2031996-08-0505 August 1996 Part 21 Rept Re Potential Defect on Condition in Component of Nordberg Model FS1316HSC Sdg W/Fuel Injection Line Assembly Which Connects Fuel Pump to Injector.Caused by Loose Fuel Line Sleeve ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML20097A5641996-01-31031 January 1996 Final Part 21 Rept Re Ball Valves Supplied by Cardinal Industrial Products Containing Suspect Pressure Boundary Bolting.Valves Containing Suspect Bolts Returned to Canadian Worcester Controls Ltd to Have Bolting Replaced ML20092H3641995-09-13013 September 1995 Part 21 Rept Re 3/4 Inch ASME Section III Class 2 Ball Valves Supplied by Canadian Worcester Controls Ltd (Cwcl) ML20078C2591994-10-19019 October 1994 Part 21 Rept Re Valtek Valves Addressed in NRC Part 21 Log Number 93-325,installed at South Texas Project.Valtek re-designed Trim to Meet All Requirements & Built Parts to Retrofit in Valves ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20126J5961992-12-31031 December 1992 Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20106E1951992-11-0202 November 1992 Part 21 Rept Re Cracked Fuel Nozzle Tips Purchased from Bendic.Initially Reported on 910405.Addl Testing of Tips Performed Completed,Reviewed & Recommendation to Prevent Failures Made ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20095J3061992-04-24024 April 1992 Initial Part 21 Rept Re Defectively Installed Bolting in Emergency Diesel Generator Bldg Internal Wall Seismic Supports.Repairs to Reestablish Seismic Qualification of Walls Continuing & Emergency Buses Declared Inoperable ST-HL-AE-3903, Suppl to Special Rept:On 901126,fuel Oil Leak Noted at Injection Pump 1L of Standby Diesel 23.Caused by Crack on Threaded Portion of Delivery Valve Holder.Injection Pump Delivery Valve & Valve Holder Replaced on 9011271991-11-0404 November 1991 Suppl to Special Rept:On 901126,fuel Oil Leak Noted at Injection Pump 1L of Standby Diesel 23.Caused by Crack on Threaded Portion of Delivery Valve Holder.Injection Pump Delivery Valve & Valve Holder Replaced on 901127 ML20086P1591991-10-31031 October 1991 Part 21 Rept Re Microscopic Cracks in Fuel Nozzle Tip from Mfg Lot D87001.Cracks Perpendicular to Axis of Nozzle & Extend Through Case Hardening & Stop at Core.Interim/Final Report Will Be Forwarded as Further Development Occurs ML20083D7711991-09-20020 September 1991 Interim Part 21 Rept Re Failure of Fuel Injector Nozzle Tips.Initially Reported on 910723.Each Util Will Continue to Monitor Exhaust Gas Temps During Monthly Runs & Will Sample Lube Oil on Quarterly Basis for Contamination ML20079G8921991-08-27027 August 1991 Part 21 Rept Re Failure of Normally Energized Asco Model L206-832 Solenoid Valves Due to Gelling of Lubricant (Dow Corning 550).Initially Reported on 910826 Via Telcon.Ler 2-91-005 Re ESF Actuations Caused by Transient Encl ML20077A4041991-04-29029 April 1991 Deficiency Rept Re Possible Mfg Problems W/Certain Coils Used on Asco Nuclear Qualified Valves.Problems Discussed in NRC Info Notice 86-057.All Purchasers Will Be Notified & Replacement Product Will Be Offered If Item Still in Svc BSEP-91-0191, Part 21 Rept Re Discrepancy Noted Between Torque Indicated by motor-actuator Characterization Sys & Output Torque Measured by Limitorque Actuator Test Stand.Initially Reported on 910426.Vendor Contacted Re Software Problem1991-04-29029 April 1991 Part 21 Rept Re Discrepancy Noted Between Torque Indicated by motor-actuator Characterization Sys & Output Torque Measured by Limitorque Actuator Test Stand.Initially Reported on 910426.Vendor Contacted Re Software Problem ML20072S9501991-04-0505 April 1991 Interim Part 21 Rept Re Failure of Standby Diesel Generator Fuel Nozzle Tips Mfg by Bendix.Initially Reported on 910327. on 910327 Memo Issued Requesting Recall of Affected Parts. Technical Evaluation Underway by Util ML20072T3081991-04-0404 April 1991 Advises That Ongoing Investigation Into Emergency Diesel Generator Failure Raised Questions Re Fuel Nozzle Tips Furnished by Cooper Energy Svc.Records Indicate Tips Supplied to Company ST-HL-AE-3655, Deficiency Rept & Part 21 Rept Re Change in Commitment to Procure Class 1E Battery Cables from Gould Nuclear Batteries Inc.Gould Discontinued Implementation of QA Program & Removed from Util Approved Vendor List1991-01-0303 January 1991 Deficiency Rept & Part 21 Rept Re Change in Commitment to Procure Class 1E Battery Cables from Gould Nuclear Batteries Inc.Gould Discontinued Implementation of QA Program & Removed from Util Approved Vendor List ST-HL-AE-3568, Revised Part 21 Rept Re Failure of Feedwater Isolation Valve Due to Thermal Incompatibility of Hydraulic Fluid1990-10-15015 October 1990 Revised Part 21 Rept Re Failure of Feedwater Isolation Valve Due to Thermal Incompatibility of Hydraulic Fluid ML20043A6091990-04-27027 April 1990 Part 21 Rept Re Defective Axial Cracks in Pump Shaft in Region Immediately Above Impeller & in Reactor Recirculation Pumps.Probably Caused by Crack Growth as Thermal Fatigue. Technical Advisory Bulletin Will Be Sent to Each Util ML20012C1351990-03-0808 March 1990 Part 21 Rept Re Failure of Connecting Rod in Standby Diesel Generator 22.Initially Reported on 891208.On 891128,master Connecting Rod Failed.Caused by over-drilling of Oil Holes. Final Rept, Finite Element Analysis of KSV-4-2A... Encl ML20012A9011990-02-27027 February 1990 Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp ML20011F1941990-02-22022 February 1990 Part 21 Rept Re Abb 27/59 Relay Catalog Series 211L.Solder Connections to Printed Wiring Runs on Bottom of Circuit Board Deteriorated Due to Thermal Stress.No Actual Failure Occurred & Relays to Be Changed at Next Outage ML20011F5971990-02-22022 February 1990 Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used ML18153C1011990-02-0202 February 1990 Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl ML17223A7451990-01-26026 January 1990 Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML20011D4321989-12-15015 December 1989 Suppl to Part 21 Rept Re Completion of Replacement of Unit 1 CR205 Series Auxiliary Contacts w/CR305 Contacts.Initially Reported on 871030.Implementation of Five of Six Auxiliary Contacts Extended Until 900131 ML20011D1971989-12-0808 December 1989 Part 21 Rept Re 891128 Failure of Master Connecting Rod 4 & Ejection of Rod & Broken Pieces Through Right Ctr Door Frame Opening.Caused by High Cycle Fatigue to Transverse Oil Passage.Repairs to Crankshaft & Engine Underway ML19325E4571989-10-20020 October 1989 Part 21 Rept Re Potential Inconsistencies in Mac Diagnostic Sys Software.Licensee to Review All Smb,Sb & Sbd Size 3 Mac Torque Test Data Using Mac Software Version 2.96 to Insure That Torque Switch Settings Meet Valve Design Requirements ML19325E0861989-10-16016 October 1989 Followup Part 21 Rept Re Class 1E Battery Chargers W/ Transformers Running at Temps Exceeding Those Used in Qualification Rept When Operating at or Near Full Load Rating of Equipment.Listed Corrective Actions Underway ML19351A2941989-10-0909 October 1989 Part 21 Rept Re Potential of Ambient Compensated Molded Case Circuit Breakers to Deviate from Published Info. Instantaneous Trip Check Will Be Instituted on All Class 1E Thermal/Magnetic Ambient Breakers Prior to Shipment ML19325C9521989-09-29029 September 1989 Part 21 Rept Re Potential Common Failure of SMB-000 & SMB-00 Cam Type Torque Switches Supplied Prior to 1981 & 1976. Vendor Recommends That Switch W/Fiber Spacer Be Replaced ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20246P7111989-07-17017 July 1989 Part 21 Rept Re Quench Cracks in Bar of A-SA-193 Grade B7 Component.Quench Cracks Found in One Bar of Matl.Listed Purchasers Informed of Potential Defect.Next Rept Will Be Submitted When Addl Info Becomes Available ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified ML20245B6651989-06-15015 June 1989 Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint BSEP-89-0342, Part 21 Rept Re Problem in Pump Suction & Discharge Valves of Standby Liquid Control Sys.Initially Reported on 890427. Evaluation Found Defect Consisting of Casting Flaws/Surface Irregularities in Valves1989-05-0101 May 1989 Part 21 Rept Re Problem in Pump Suction & Discharge Valves of Standby Liquid Control Sys.Initially Reported on 890427. Evaluation Found Defect Consisting of Casting Flaws/Surface Irregularities in Valves ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20244D8161989-04-13013 April 1989 Part 21 Rept Re Failure of Rosemount Transmitters.All Failed Transmitters Replaced,Inservice Test Procedure Prepared & Monthly Test of All 12 Transmitters in RCS Throughout Cycle 2 Operation Will Be Performed.Review Continuing 1999-03-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 1999-09-09
[Table view] |
Text
_
w l
/11/86 V EK Director, Office of Inspection and Enforcement US Nuclear Regulatory Commission Washington, D.C. 20555 Dear Director We have been advised by letter received on Feb. 27, 1986, by a former vendor, Cardinal Industrial Products Corporation (3873 West Oquendo, Las Vegas, Nevada 89118) that material on several purchase orders furnished by Cardinal to Valtek Incorporated deviated from ASME Section III, NOA 3800 in that " Improper Qualification of Stock Materials: (NCA-3866.3 (a)) Materials certified as meeting Section III where the stock material was either purchased from a non-qualified source or the audit used to qualify the source was inadequate. No subsequent upgrading was performed." Cardinal has also reported this problem to the NRC. Our investigation has determined that these parts were furnished to the following customers en the following valves:
Carolina Power & Light - Brunswick Steam Electric Plant Valves serial no.
35411-1-1, 35411-1-2 (This only Nuclear intent, not N-Stamp)
Houston Lighting & Power - South Texas Project valves serial no.
34752.004, 34752.009, 34752.010, 34752.011, 34752.012, 34752.014, 34752.015, 34752.016, 34752.017, 34752.020, 34752.039, 34753.009, 34753.010, 34753.011, 34753.012, 34753.014, 34752.015, 34753.016, 34753.017, 34752.039, Each of these customers are also being notified of this problem.
We still have in stock additional quantities of some of these parts which will be tested. As soon as those test reports are complete you w1il be notified of the applicable valve and customer.
Sincerely 8603180204 860311 PDR ADOCK 05000324 g PDR O[ j' e f[ ;,
, /) , ,
L L Schroeppel V.P. Administration Director of Region IV Office of Inspection and Enforcement US Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 -
Arlington, Texas 76012 NNN Mountain Spnngs Parkway Box 2200/ Spnngville, Utah 84663 USA / Phone 801-489-8611i Telex 388-458
Page 2 Director, office of Inspection and Enforcement 03/11/86 cc Mr. Gary G. Zech,
. Chief Vendor Program Br.anch
. Division of Quality Assurance
' Nuclear Regulatory Commission washington, D.C 20555 Re Docket No. 99900840/84-01 Attachmentis
- 1. Letter to Carolina Power & Light
~(Brunswick Steam Electric Plant)
- 2. Letter to Bechtel Energy Corp.;
Agents for Houston Light and Power (South Texas Project) a
9 S
VALTEK Bectitel Energy Corporation 03/12/86 Agents for Houston Light & Power Co.
P.O. Box 2166 Houston, TX 77252-2166 Attn: L.M. Ray RE: South Texas Project Valtek was advised by letter from Cardinal Industrial Products Corporation who has supplied us with bolting materials that materials used in some bolting deviated from ASME Section III, NCA 3800 in that " Improper Qualification of Stock Materials: (NCA-3866.3 (a)) Materials certified as meeting Section III where the stock material was either purchased from a non-qualified source or the audit used to qualify the source was inadequate. No subsequent upgrading was performed." They also indicated they have reported this condition to NRC.
The following valves shipped to you on this project have included the questionable bolting:
P.O. 84N0056, quantity 64, .c'rt e no. 42283, was used on 2" valves utilizing 4 nuts each valve, (16 total valves)
Trace Letter: J25 Part Number: 1571.014.0009018 Valve SN: 34752.009, 34752.010, 34752.011, 34752.012, 34752.014, 34752.015, 34752.016, 34752.017 34753.009, 34753.010, 37453.011, 34753.013, 34753.014, 34753.015, 34753.016, 34753.017 f
Mountain Springs Parkway Box 2200 / Springville. Utah 84663-2200 US A / Phone 801-489-8611/ Telex 388-458
Page 2 -
Bechtel Energy Corporation 3/12/86
'd:
P.O. 85N0004, quantity 17, cert no. 43103, was used on 4" valves utilizing 8 studs each valve (2 total valves). The extra stud has been removed from stock,and placed on hold.
Trace Letter: 267 Part Number: 3680.012.0009007 Valve SN: 34752.004, 34752.020 P.O.'85N0022, quantity 8, cert no. 44156, was used on a 1" valve utilizing 4 nuts each valve (2 total valves)
Trace Number: 'HS Part Number: 1571.014.0009018 Valve SN 34752.039 34753.039 Sincerely L L Schroeppel '
V.P. Administration cc: Houston Light & Power '
South Texas Project P.O. Box 1700 Houston, TX 77001 Attn: Project Manager NRC is being notified of this problem, including a copy of this letter.
t 6
4
- . ~
03/12/o6 VALTEK Carolina Po or & Light Company Brunswick Steam Electric Plant F.O. Box 11060 Southport, North Carolina 28461 ATTN: L.H. Dishman, Principal Buyer RE: Brunswick Steam Electric Plant valtek was advised by letter from Cardinal Industrial Products Corporation who has supplied us with bolting materials that materials used in some bolting deviated from ASME Section III, NCA 3800 in that " Improper Qualification of Stock Materials: (NCA-3866.3 (a)) Materials certified as meeting Section III where the stock material was either purchased from a non-qualified source or the audit used to qualify the source was inadequate. No subsequent upgrading was performed." They also indicated they have reported this condition to NRC.
The following valves shipped to you on this project even though they are not "N-Stamp" they have used the questioned bolting:
VALVE SN QTY PART NO. DESCRIPTION TRACE NO.
--- _. --- - - - - - - - _ - - - - - - - - ---==_____ .- ---------
35411-1-1 24 2383.542.0009021 1 1/4-8 SB 164 139 Monel Heavy Hex Nut 21 9979.542.0009021 1 1/4-8x8 SB 164 4G32 Monel Stud 3 25568.542.0009021 1 1/4-8-8 1/2 SB 164 4G17 Monel Stud 35411-1-2 24 2383.542.0009021 1 1/4-8SB 164 133 Monel Heavy Hex Nut 21 9979.542.0009021 1 1/4-8x8 Sa 164 4G32 .
Menel Stud 3 25568.542.0009021. 1 1/4-8x8 1/2 SB 164 4G17 '
Monel Stud We have additional quantities of those parts which will be tested to determine if they can be acceptably upgraded.
NRC is being notified of this problem, including a copy of this letter.
Sincerely
- 7f L L Schroeppel V.go,4pgj9hr7 tit [sNMy Box 2200 / Spnngvdie. Utah 84663-2200 USA / Phone 801-489-8611/ Telex 388-458