ML20141H418

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1986
ML20141H418
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/1986
From: Bregni L, Lenart R
DETROIT EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NP860069, NUDOCS 8604240324
Download: ML20141H418 (4)


Text

. . - .  : -

. OPERATING MTA REPORT DOCKET N0 50-341 UNIT FERMI-2 MTE 02-11-86 COMPLETED BY L p , pr.g i TELEPHONE (313) 586-5119 OPERATING STATUS

1. REPORTING PERIOD January GROSS HOURS IN REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED POWER LEVEL (KJt) 165 MAX DEPEND CAPACITY (L'cNet)

DESIGN ELECTRICAL RATING (KJe Net) 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (KJe Net) 57.5 {
4. REASONS FOR RESTRICTION (IF AhT) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS M0hTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0 1912.5 1919 s j
6. REACIOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE O O O
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (&'H) 0 105,861.6 105.861.6
10. GROSS ELECTRICAL ENERGY GENERATED (%'H) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (&'H) 0 0 0
12. REACTOR SERVICE FACTOR N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A
16. UNIT CAPACITY FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design KJe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 tOhTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUT DOWN AT END Of REPORT PERIOD, ESTIMATED DATE OF STARTUP 3/15/86
21. UNITS IN TEST STATUS (PRIOR 10 COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/o1/RG INITIAL ELECTRICITY 04/01/86 COMMERCIAL OPERATION 06/01/86 8604240324 860131 PDR ADOCK 05000341 R pop j i

O AVERAGE DAILY UNIT POWER LEVEL ,

DOCKET NO. 50-341 UNIT FERMI-2 DATE 02-11-86' COMPLETED BY L.P. BrePDi TELEPHONE (313) 586-5713 NONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

DCCKET NO. 50-341

- UNIT SiluTDOWNS AND POWER REDUCTIONS UNIT NAME Fermi - 2 DATE 02-11-86 COMPLETED BY L.P. Bregni RE, PORT MONTH January TELEPHONE (313) 586-5m i . . m m e; o  ; = m-ownu-2 1 I

, . . n o.<. me . m i. ~2mmoxmi

  • x w .o . > . vo m >cc i

mnm.

om ,

xf.

o cs .

-o m .

. ums n z.-i!2 .

so.

g0 l DATE  ! E "l 5o l C*l. 0 E k> ii! Q l CORRECTIVE ACTIONS / COMMENTS i . . mm . -z . mo mao.m.
  • i e o . . . mi r

' l 1 l 860101 l S ;744.0 l H l 4 l Plant has been shut down since  ;

l l l l l October 11, 1985 for a scheduled l l l l l l l maintenance outage and is still in e l l l l l l l the outage at this time

. . i e i e i

. e i e e i

. e i e e i

. . i i i

e. i. i a i . i *

. . i e s

., , s .e e . * ,

, . . a i .

  • i

. . . i e i

. i. e e i e i e i i .

e. . e s

, i e .i e s

, , e e i -

. i. e i e e. ,

., e e i e s

, . .i . . e s *

, .e .i *

. . . . e a

. e e i e

. . .i . e a

, . . .e i

. . e e i

., _ . . e.

a a

(1) REASONS A. EQUIPMENT FAILURE (EXPLAIN) ,

E. OPERATOR TRAINING AND LICENSE EXAMINATION B. MAINT OR TEST F. ADMINISTRATIVE C. REFUELING G. OPERATIONAL ERnc. (EXPLAIN)

D. REGULATORY RESTRICTION H. ODiER (EXPLAIN)

(2f METHOD ,

3. AUTOMATIC SCRAM
1. MANUAL

. 2. MANUAL SCRAM 4. OTHER (EXPLAIN)

2.

l Pa anag Fermi-2 Edison (=3'3)"2 '=N# February 11, 1986 o""*

~

pe rations NP860069 U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Monthly Operating Status Report for January, 1986 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January, 1986. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

1 If you have any questions, please contact us.

Sincerely,

/L+

R. S. Lenart Plant Manager Enclosure cc: Mr. P. M. Byron USNRC, Document Control Desk Mr. M. D. Lynch Washington, D.C. 20$55 Regional Administrator Mr. Dennis Hahn USNRC Region III Division of Radiological Health 799 Roosevelt Road Michigan Department of Health Glen Ellyn, IL 60137 3500 North Logan l P.O. Box 30033 Lansing, MI 48909 Mr. Jon Eckert Monroe Of fice of Civil Preparedness 965 South Raisinville Road Monroe, MI 48161 gp)

,,