MONTHYEARML20217P7111999-10-26026 October 1999 Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196K6721999-07-0202 July 1999 Discusses 990628 Meeting Conducted in Region IV Office Re Status of San Onofre Nuclear Generating Station Emergency Preparedness Program.List of Attendees & Licensee Presentation Encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20210N9871999-07-0101 July 1999 Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts ML20209B3571999-06-28028 June 1999 Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl ML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML20196A9801999-06-17017 June 1999 Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl ML20195G8091999-06-14014 June 1999 Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition ML20195K4201999-06-11011 June 1999 Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other ML20195H1561999-06-10010 June 1999 Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 ML20195E4981999-06-0808 June 1999 Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints ML20196L3191999-05-24024 May 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 ML20207A3831999-05-24024 May 1999 Responds to NRC 990326 RAI on DG Srs.Proposed to Add Listed Sentence to TS Bases for SRs 3.8.1.7,3.8.1.12 & 3.8.1.15,as Result of Discussion with NRC During 990427 Telcon ML20211K4261999-05-18018 May 1999 FOIA Request for Documents Re San Onofre OI Repts 4-98-041, 4-98-043 & 4-98-045 ML20206S7161999-05-17017 May 1999 Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3 ML20206N4711999-05-13013 May 1999 Provides Info Requested by NRC Re Reduced Pressurizer Water Vol Change Amends Application 172 & 158 for Songs,Units 2 & 3,respectively.Proposed Change Will Reduce Pressurizer Water Level Required for Operability ML20206M7791999-05-13013 May 1999 Informs NRC of Changes Being Made to Emergency Response Data Sys (ERDS) at SONGS Unit 3.Revised Page to ERDS Data Point Library Is Provided in Encl ML20206K6891999-05-11011 May 1999 Forwards Approved Amends to NPDES Permits CA0108073,Order 94-49 & CA0108181,Order 94-50 & State Water Resources Board Resolution ML20206M0681999-05-10010 May 1999 Submits Correction to Info Contained in Licensee to NRC Re Proposed TS Change Number NPF-10/15-475.Stated Info Was Incorrect in That Overtime Provisions Were Not Contained in TR at Time of Was Submitted ML20206H0451999-05-0404 May 1999 Forwards Annual Financial Repts for Listed Licensees of Songs,Units 1,2 & 3.Each Rept Includes Appropriate Certified Financial Statement Required by 10CFR50.71(b) ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML20206C5151999-04-29029 April 1999 Forwards 1998 Radiological Environ Operating Rept for Songs,Units 1,2 & 3. Annual Radiological Environ Operating Rept Covers Operation of Songs,Units 1,2 & 3 During CY98 & Includes Summaries Interpretations & Analysis of Trends ML20206E5851999-04-29029 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for SONGS Units 1,2 & 3. Also Encl Are Rev 13 to Unit 1 ODCM & Rev 31 to Units 2 & 3 Odcm 1999-09-29
[Table view] |
Text
.
l r n '
h' $O01hlRN CALIFORNIA R. W. Krieger id
{ QQ JV Vice President Nuclear Generation An LDISON JATIJtM TION 41 Company January 13, 1997 I
I Mr. William H. Bateman i Director, Directorate IV- II l U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Docket No. 50-362 Request for Enforcement Discretion Emergency Diesel Generator Surveillance Testing San Onofre Nuclear Generating Station, Unit 3
Dear Mr. Bateman:
The purpose of this letter is to provide written followup to a request for discretionary enforcement from the requirements of Surveillance Requirement ]
(SR) 3.0.3, for the purpose of delaying implementation of SR 3.8.1.14 and 3.8.1.15 of Technical Specification 3.8.1, " Electrical Power Systems." This enforcement discretion is requested until the NRC approves on an exigent basis a license amendment which will revise SR 3.8.1.14 and 3.8.1.15 until the next refueling outage on Unit 3. This request was discussed with the NRC in a telephone call on the morning of January 12 and verbally granted during that call at 9:20 a.m. PST.
The need for this request results from an administrative error in implementation of the Technical Specification Improvement Program (TSIP) approved by the NRC and implemented by Edison on August 5,1996. During the 1 SIP project, Edison personnel recognized that the new TS 3.8.1 surveillances contain less rigorous kW loading limitations than were present in the g correspondingpre-TSIPTS3/4.8.1,"A.C. Sources,"surveillancesand incorrectly believed that the new TS surveillances were therefore satisfied.
Consequently, the EDGs were tested to a more rigorous set of performance standards than allowed by the new TSIP SR's. At the time of NRC review and approval of our TSIP application, Edison should have requested delayed g)k implementation of these TSIP refueling interval surveillances until the next scheduled refueling outage.
9701140347 PDR 970113 P
ADOCK 05000362 PDR P.O.th 128 1 s.g h ) 9 b San Cleinente, CA 42674 716308+255 I'as 714 368+183
Document Control Desk On January 11, 1997, Edison noted that the existing Unit 3 pre-TSIP surveillances of record did not fully satisfy the new SRs 3.8.1.14 and 3.8.1.15. However, both Unit 3 emergency diesel generators (EDGs) are fully functional and capable of performing their intended safety functions, as demonstrated by satisfactory surveillances performed under the more rigorous but different pre-TSIP surveillance kW loading requirements. In addition, both Unit 3 EDGs have successfully undergone full load rejection tests per the new, and less rigorous, loading limitations specified in the new SR 3.8.1.10.
This enforcement discretion would avoid an undesirable transient associated with an unnecessary plant shutdown and thus minimize potential safety consequences and operational risks associated with such action.
A. Requirements For Which The Notice of Enforcement Discretion was Requested:
The following TSIP surveillance requirements apply:
SR 3.0.3 (in part)
If it is discovered that a Surveillance was not performed within its specified Frequency, then Compliance with the requirement to declare the LC0 not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
SR 3.8.1.14
NOTES-------------------------------------
- 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
- 2. Credit may be taken for unplanned events that satisfy this SR.
Verify each DG, when operating with the maximum kVAR loading permitted during testing, operates for 1 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
- a. For 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded E 4935 kW and 5 5170 kW; and
- b. For the remaining hours of the test loaded E 4450 kW and 5 4700 kW.
I
, l Document Control Desk SR 3.8.1.15
NOTES--------------------------------------
- 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded E 4450 kW and-5 4700 kW.
Momentary transients outside of load range do not invalidate this test.
- 2. All DG starts may be preceded by an engine prelube period. !
Verify each DG starts and achieves, in s 10 seconds, voltage 1 3924 Y and 5 4796 V, and frequency 1 58.8 Hz and 5 61.2 Hz; and operates t 5 minutes.
TS surveillances 3.8.1.14 and 3.8.1.15 correspond to the pre-TSIP surveillances 4.8.1.1.2.d.8 and 4.8.1.1.2.d.4.b, which stated:
4.8.1.1.2.d.8 Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 5170 kw and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 4700 kw. The generator voltage and frequency shall be 4360
- 426 volts and 60 i 1.2 Hz after the start
- signal; the steady state l l
generator voltage and frequency shall be maintained at 4360
- 436 volts and60+1.2/-0.3 Hz for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test and 4360
- 436 volts and 60 1 1.2 Hz during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test.
Within 5 minutes after completing this 24-hour test, perform Surveillance Requirement 4.8.1.1.2.d.4.b.
- The engine start for the purpose of this surveillance test may be precededbyanengineprelubeperiodand/orotherwarmupprocedures recommended by the manufacturer so that mechanical stress and wear on j the engine is minimized.
4.8.1.1.2.d.4.b Simulating a loss of offsite power by itself, and b) Verifying the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds and operates for greater than or equal to 5 minutes while its generator is
Document Control Desk loaded with the permanently connected loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4360 1 436 volts and 60 1 1.2 Hz during this test.
The TSIP surveillances restrict the kW loading for the first two hours ,
to 1 4935 kW and 5 5170 kW, and for the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> the loading '
is restricted to 1 4450 kW and 5 4700 kW. However, the pre-TSIP surveillance was performed under a more rigorous loading of 15170 kw i for the first two hours and 1 4700 kW for the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />. The l pre-TSIP Surveillance Operating Instruction S023-3-3.23.1, 1
" Diesel Generator Refueling Interval Tests," actually required the operator to set the loading between 5170 to 5200 kW for the first two hours, and then reduce load to at least 4700 kW but less than 4850 kW j for the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />. Similarly Note 1 of SR 3.8.1.15 specifies that this surveillance is to be performed after the DG has operated 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> loaded t 4450 kW and 5 4700 kW.
For Unit 3, the last pre-TSIP surveillance values recorded were:
Diesel Generator 2-Hour kW & KVAR Load 22-Hour kW & KVAR Load 3G002 5180 3000 4750 - 4800 2000 - 3000 )
l 3G003 5190 500 4780 - 4830 3000 l l
Therefore, although the test with the larger load is a more demanding test of the EDGs, both the 2-hour and 22-hour loading values exceeded the maximum permitted by the TSIP surveillances of 5170 kW and 4700 kW, respectively. Also, since the 24 run was not conducted within the limits of Note 1 to SR 3.8.1.15, this SR was also not satisfied.
B. Circumstances Surrounding the Situation:
Unit 2 is currently in a refueling outage, and Unit 3 is operating at full power. In response to a recent unrelated, but similar problem with SR 3.8.1.9, Edison was in the process of reviewing other EDG j surveillances to ensure full compliance with the new TSs. During this review, and as noted above, on January 11, 1997, Edison recognized that the existing Unit 3 pre-TSIP surveillances of record did not fully satisfy the new SR 3.8.1.14 and 3.8.1.15 loading requirements.
This is considered to have been caused by personnel error. During the pre-TSIP reviews to verify TSIP compliance, the associated reviewers recognized that pre-TSIP testing was more rigorous than the TSIP l
4 Document Control Desk testing. Therefore, the previous surveillances were believed to be l bounding, and full TSIP compliance would not require any additional refueling interval EDG testing until the next scheduled outage.
Because the EDG performance data collected during pre-TSIP surveillance testing exceeds the requirements of the new TSIP surveillances, Edison concludes the tests of record did not fully comply with the new ;
surveillance requirements. As such, Edison declared a missed surveillance on both Unit 3 EDGs, and entered the provisions of SR 3.0.3 at 5:10 pm PST on January 11, 1997.
C. Compensatory Measures:
Because the Unit 3 EDGs had passed their previously required, and more rigorous, pre-TSIP surveillances and the most recent TSIP full load rejection test, both EDGs are fully capable of performing their intended safety functions. Consequently, Edison does not consider any compensatory actions, beyond this request for enforcement discretion and an exigent change to the TS, are warranted. A copy of the proposed change to the TS that will be submitted on an exigent basis Is enclosed.
D. Safety Basis For This Request: ;
Because the Unit 3 EDGs had passed their previously required, and more rigorous, pre-TSIP surveillances, both EDGs are fully capable of performing their safety functions. Therefore, there would be no safety benefit in performing the post-TSIP SR, and further, there are no consequences associated with not performing these SRs. This would also result in an unnecessary shutdown transient to confirm the ability of the EDGs to adequately pass less rigorous surveillances than those 4 already performed.
This conclusion is corroborated by probabilistic risk assessment insights which indicate that deferral of the tests until the Unit 3 refueling outage would expose the plant to no increase in risk over that of normal plant operations and would avoid the risks associated with shutting the unit down to perform the tests.
E. Justification for the Duration of the Enforcement Discretion:
Enforcement discretion is requested until the NRC approves on an exigent basis a license amendment which will revise SR 3.8.1.14 and 3.8.1.15 until the next refueling outage on Unit 3. This request will preclude
1 . .
i . .
Document Control Desk !
the need to shut down Unit 3 before the refueling outage for the sole l purpose of performing this SR.
F. Basis for No Significant Hazards
Conclusion:
10 CFR 50.92 defines that no significant hazards will occur if operation of the facility, in accordance with the enforcement discretion, does not:
- 1. Involve a significant increase in the probability or consequences of an accident previously evaluated; or
- 2. Create the possibility of a new or different kind of accident from any accident previously evaluated; or
- 3. Involve a significant reduction in a margin of safety.
More stringent surveillance tests than those in SR 3.8.1.14 and 3.8.1.15 have been completed in accordance with the previous TS. Based on that testing, Edison concludes the EDGs have demonstrated their capability to i perform their specified safety function. Consequently, Edison does not consider this enforcement discretion to involve a potential detriment to the public health and safety, and that neither an unreviewed safety question nor a significant hazard is involved.
G. Basis for No Irreversible Environmental Consequences: ;
As this activity is confined to site boundaries, this request for an NRC notice of enforcement discretion involves no increase in the amounts, and no change in the types of any effluent that may be released offsite.
There is also no increase in individual or cumulative occupational radiation exposure involved with this enforcement discretion.
Accordingly, this temporary enforcement discretion meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the granting of the notice of enforcement discretion.
Document Control Desk The San Onofre Nuclear Generating Station Onsite Review Committee reviewed and approved this request for an NRC notice of enforcement discretion.
If you have any questions or comments, or if you would like additional information, please let me know.
Sincerely, 1
<l s
Enclosure:
] ,M cc: L.J. Callan, Regional Administrator, NRC Region IV K.E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J.A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M.B. Fields, NRC Project Manager, San Onofre Units 2 and 3 l
l
\