ML20133B288

From kanterella
Jump to navigation Jump to search

Informs That Reactor Sys Branch Has Reviewed Tech Specs Problem Sheets Forwarded Under TAC 54458.List of Items for Which Branch Responsible Encl
ML20133B288
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/22/1984
From: Sheron B
Office of Nuclear Reactor Regulation
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 TAC-54458, NUDOCS 8507200266
Download: ML20133B288 (3)


Text

r-c/ "C04 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 g,

v

  • e p 2 21984 MEMORANDUM FOR:

E. G. Adensam, Chief, Licensing Branch #4 Division of Licensing FROM:

B. W. Sheron, Chief, Reactor Systems Branch Division of Systems Integration

SUBJECT:

REVIEW 0F GRAND GULF PROBLEM SHEETS Reactor Systems Branch has reviewed the Grand Gulf technical specification problem sheets forwarded to us under TACS 54458. Attached is a list of 'the items for which RSB has responsibility.

Each item has been assigned a priority in accordance with the guidance provided to us by Les Kintner of your staff.

e lb Brian W. Sheron, Chief Reactor Systems Branch Division of Systems Integration cc:

R. Mattson R. Houston M. Houston CONTACT:

T. Collins X24478 B507200266 050515 FOIA PDR

/

PDR DELL 84-459

r ITEM NO TITLE PRIORITY 1

ADS Valves Operability Requirements 1/

8 Single Loop Operation 3

22 ATWS Recirculation Pump Trip 2

23 SRV Relief Function /Lo Lo Set Ir 24 Jet Pump Operability 2

v 25 MSIV Minimum Closing Stroke Time 3

41 Recirculation Loop Operability 3

42 Recirculation Flow Nomenclature 3

46 RHR Shutdown Cooling During Refueling 3

47 EOC-RPT Response Time Testing 3

48 Extended Cycle Operation 3

56 HPCS Auto Transfer From CST to Suppression Pool 3

75 LPCI Pump B&C Discharge Pressure High Allowable Value 3

76 ECCS Response Time 1, s' 84 RCIC Turbine Protection Trips 3

99 ADS 1

L/

110 RCIC Flow Instrumentation 3

{

ITEM NO TITLE PRIORITY 115 Table 3.3.3-1 Footnote (e) and 3

116 LPCS Pump Discharge High 1

/

117 EOC-RPT Breaker Arc Suppression 3

125

' SRV Lo-Lo Set 1

/

126 Suppression Pool Operability 1

149 Tech Soec Instrumentation 1

V 150 ECCS Instrumentation 3

161 Shutdown Cooling Bases Inaccurate 3

162 Note on RHR Subsystems 3

189 Turbine Stop Valve and Control Valve Setpoints 2

205 HPCS Wide Range Level Trans. Non-Density Compensated 3

215 APRM Setpoints - Thermal Power Time Constant 3

236 Jet Pump Operability 3

j t..G[

f 7

J

<