Letter Sequence Other |
|---|
|
|
MONTHYEARML20133B2531984-03-20020 March 1984 Forwards Table Prioritizing Problems for Resolution According to Safety Significance.Review Requested Under TAC 54458 Complete Project stage: Other ML20132B8411984-03-21021 March 1984 Advises That Auxiliary Sys Branch Has Reviewed 248 Changes to Tech Specs & Prioritized 23 Changes Into Priority 1-3. Selection of Priority Based on Anticipated Risk to Health & Safety of Public.Effort on TAC 54458 Complete Project stage: Other ML20132B8201984-03-22022 March 1984 Forwards List of Items from Tech Spec Sheets for Which Reactor Sys Branch Has Responsibility.Each Item Assigned Priority Ranking Project stage: Other ML20133B2881984-03-22022 March 1984 Informs That Reactor Sys Branch Has Reviewed Tech Specs Problem Sheets Forwarded Under TAC 54458.List of Items for Which Branch Responsible Encl Project stage: Other ML20132B9251984-03-27027 March 1984 Comments on Prioritization of Tech Spec Problem Sheets. Twenty-five Problem Sheets Identified.Four Items of High Priority & 21 of Low Priority Project stage: Other ML20133B1311984-03-27027 March 1984 Informs of Completion of Containment Sys Branch Review of Tech Spec Problem Sheets.Recommends 21 Open Items Be Resolved Before Completion of First Refueling Outage Project stage: Approval ML20132B9641984-04-0909 April 1984 Informs of re-prioritization of Changes to Tech Specs,Per Div of Licensing Work Request Sheet.Categories 1 & 2 Items Listed.Tac 54458 Complete Project stage: Other ML20133B0441984-04-10010 April 1984 Forwards Comments Re Tech Spec Problem Sheets 292,293 & 306 Needing Resolution Before Low Power Operation Project stage: Other ML20132B9901984-04-12012 April 1984 Informs That No Addl Problem Areas within Instrumentation & Control Sys Branch Scope Require Resolution Prior to Next Criticality,W/Exception of Problem Areas Identified by Licensee,In Response to 840410 Memo Project stage: Other ML20133B2051984-04-13013 April 1984 Summarizes Results of Containment Sys Branch Review of Tech Spec Problem Sheets Needed for Low Power Operation. No Problem Sheets Identified for Resolution Prior to Operation Above 5% Full Power Project stage: Approval 1984-03-27
[Table View] |
Text
r-c/ "C04 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 g,
v
- e p 2 21984 MEMORANDUM FOR:
E. G. Adensam, Chief, Licensing Branch #4 Division of Licensing FROM:
B. W. Sheron, Chief, Reactor Systems Branch Division of Systems Integration
SUBJECT:
REVIEW 0F GRAND GULF PROBLEM SHEETS Reactor Systems Branch has reviewed the Grand Gulf technical specification problem sheets forwarded to us under TACS 54458. Attached is a list of 'the items for which RSB has responsibility.
Each item has been assigned a priority in accordance with the guidance provided to us by Les Kintner of your staff.
e lb Brian W. Sheron, Chief Reactor Systems Branch Division of Systems Integration cc:
R. Mattson R. Houston M. Houston CONTACT:
T. Collins X24478 B507200266 050515 FOIA PDR
/
PDR DELL 84-459
r ITEM NO TITLE PRIORITY 1
ADS Valves Operability Requirements 1/
8 Single Loop Operation 3
22 ATWS Recirculation Pump Trip 2
23 SRV Relief Function /Lo Lo Set Ir 24 Jet Pump Operability 2
v 25 MSIV Minimum Closing Stroke Time 3
41 Recirculation Loop Operability 3
42 Recirculation Flow Nomenclature 3
46 RHR Shutdown Cooling During Refueling 3
47 EOC-RPT Response Time Testing 3
48 Extended Cycle Operation 3
56 HPCS Auto Transfer From CST to Suppression Pool 3
75 LPCI Pump B&C Discharge Pressure High Allowable Value 3
76 ECCS Response Time 1, s' 84 RCIC Turbine Protection Trips 3
99 ADS 1
L/
110 RCIC Flow Instrumentation 3
{
ITEM NO TITLE PRIORITY 115 Table 3.3.3-1 Footnote (e) and 3
116 LPCS Pump Discharge High 1
/
117 EOC-RPT Breaker Arc Suppression 3
125
' SRV Lo-Lo Set 1
/
126 Suppression Pool Operability 1
149 Tech Soec Instrumentation 1
V 150 ECCS Instrumentation 3
161 Shutdown Cooling Bases Inaccurate 3
162 Note on RHR Subsystems 3
189 Turbine Stop Valve and Control Valve Setpoints 2
205 HPCS Wide Range Level Trans. Non-Density Compensated 3
215 APRM Setpoints - Thermal Power Time Constant 3
236 Jet Pump Operability 3