Advises That Auxiliary Sys Branch Has Reviewed 248 Changes to Tech Specs & Prioritized 23 Changes Into Priority 1-3. Selection of Priority Based on Anticipated Risk to Health & Safety of Public.Effort on TAC 54458 Complete
ML20132B841
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/21/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 TAC-54458, NUDOCS 8404090113
Download: ML20132B841 (3)


Text

n n

.. a%

[j UNITED STATES fa [/

/

g o

8" j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20$55

'y g

e e

/

MAR 211984 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing, Division of Licensing L. S. Rubenstein, Assistant Director for Core and Plant FROM:

Systems, Division of Systems Integration

SUBJECT:

PRIORITIZATION OF CHANGES TO GRAND GULF TECHNICAL SPECIFICATIONS - AUXILIARY SYSTEMS BRAf!CH - TAC NO. 54458 Per the subject TAC the Auxiliary Systems Branch has reviewed the 248 changes to the Grand Gulf Technical Specifications and has identified 23 changes which These are in the Auxiliary Systems Branch primary area of responsibility.

23 changes have been prioritized into the following categories. Priority 1 changes are changes which should be resolved prior to exceeding 5% power operation.

Priority 2 changes are changes which should be resolved within a yet to be defined time after excceding 5% power operation.

Priority 3 changes are changes which should be resolved prior to the first refueling outage, i.e.

lifting of the reactor cavity shield.

It should be acted that the descriptions of these items contain many typo-graphical errors and poor wording such that the intent of the changes is not Therefore, we may not have selected all of the appropriate always clear.

items. We request that the applicant provide clear descriptions when the technical specifications are submitted for review and we will verify that all of the changes which are the responsibility of the Auxiliary Systems Branch have been identified.

The selection of a priority for a given change was based on the anticipated risk to the health and safety of the public with respect to the probability of an event, the potential hazard represented by the technical specification chanae, and the significance of the chan Based upon the above considerations, we have identified 17 Priority 1 items (ge.Nos.17, 32, 82', 94; 100,129; 132, 165,' 173,' 183,195,* 208,' 210, 214, 221, 222, and 229'), no Priority 2 items, ad six Priority 3 items (Nos. 2',35,46,58,176and187).

This completes our work on TAC No. 54458. Since we are not providing a safety evaluation report, we are not enclosing a SALP report.

kt u

(.

L.S.Rubnstein,AssiNantDirector for Core nd Plant Systens I

gg f f y Division of Systems Integration a

cc:

R. Mattson

. Clemenson

0. Parr E. Adensam J. Wilson

.L. Kintner J. Ridgely

Contact:

J. Ridgely, E94 E -. 1 g [, 4