Letter Sequence Approval |
|---|
|
|
MONTHYEARML20132C0891984-05-0101 May 1984 Informs of Core Performance Branch Review of Tech Spec Problem Areas for Exceeding 5% Power.Current Specs for Listed Tech Spec Problems Sheets Acceptable Project stage: Approval ML20132C0561984-05-0101 May 1984 Prioritizes Problem Sheets for Full Power Operation Problem Sheets 805,821 & 826 & 39.Problem Sheets Identified in 840409 Memo Should Be Resolved as Approved Tech Spec Changes Prior to Issuance of Full Power OL Project stage: Approval ML20132C0601984-05-0202 May 1984 Responds to 840425 Memo Requesting Review of Selected Tech Spec Problem Sheets to Determine Which Problems Require Tech Spec/Fsar Change Prior to Full Power License Amend.None of Matters within Areas of Branch Responsibility Project stage: Approval ML20132C0701984-05-0303 May 1984 Forwards Concerns Not Referenced in Problem Sheets Re Accident Evaluation Branch Review of Tech Specs.Util Proposed Resolution Adequate Project stage: Approval ML19276B5711984-05-0303 May 1984 Discusses Containment Sys Branch Input Re Assessment of Tech Spec Problem Sheets.No Items Identified Require Resolution Prior to Authorizing Full Power Operation Project stage: Other ML20132C0821984-05-0404 May 1984 Lists Items from Tech Spec Problem Sheets Requiring Tech Spec or FSAR Changes Project stage: Other ML20132C1131984-05-0909 May 1984 Discusses Tech Spec Review of Problem Sheets 160 & 219. Concerns Identified in Subj Problem Sheets Should Be Reviewed by Licensee Contractor Preparing pressure-temp Limit Curves Project stage: Approval 1984-05-03
[Table View] |
Text
b ocn,
u 8
o UNITED STATES w
!]
g NUCLEAR REGULATORY COMMISSION
-1'
.. E WASHINGTON, D. C. 205S5 o'%,
,/
MAY l E84 MEMORANDUM FOR: T.':MEffo3g Assistant Director for Licensing, DL FROM:
L. S. Rubenstein, Assistant Director for Core and Plant Systems, DSI
SUBJECT:
REVIEW 0F GRAND GULF TECHNICAL SPECIFICATION PROBLEM AREAS FOR POWER OPERATION EXCEEDING 5 PERCENT POWER (TACS 54808)
The Core Performance Branch has completed the review of the subject Technical Specification problem areas. The staff has concluded that the current specifications for the Technical Specification problem sheet Nos. 347, 352, 354, 355, 356, 371, and 821 are acceptable as is.
,l l'
L. S. Rubenstein, Assistant Director for Core and Plant Systems, DSI cc:
R. Mattson D. Eisenhut C. Thomas R. Capra G
L. Kintner f
p.t
}/
a
(\\ fr
/
/
,0 ontact:
S. Sun, DSI:CPB W. Brooks, DSI:CPB X-29499 X-29498
/