ML19276B571

From kanterella
Jump to navigation Jump to search

Discusses Containment Sys Branch Input Re Assessment of Tech Spec Problem Sheets.No Items Identified Require Resolution Prior to Authorizing Full Power Operation
ML19276B571
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/03/1984
From: Houston R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 TAC-54808, NUDOCS 8405170036
Download: ML19276B571 (2)


Text

.&

A.

g May 3,1984 HEMORANDUM FOR:

T. Novak, Assistant Director for Licensing, DL FROM:

R. W. Houston, Assistant Director for Reactor Safety, DSI r

SUBJECT:

CSB RELATED INPUT RE: ASSESSMENT OF MISSISSIPPI POWER

& LIGHT'S (MP&L) TECHNICAL SPECIFICATION PROBLEM SHEETS FOR GRAND GULF, UNIT 1 (TACS 54808)

References:

1) Memo from T. Novak to D. R. Muller et al, dated April 25,1984
2) Memo from R. W. Houston to T. Novak, dated April 13,1984 Plant Name:

Grand Gulf, Unit 1 Docket No.:

m 50-416L Licensing Stage OL NSSS Supplier:

GE Architect Engineer: Bechtel Responsible Branch: LBf2 Milestone Date:

5/2/84 Project Manager:

D. Houston Review Dranch:

CSB:DSI The Containment Systems Branch (CSB) has completed the review requested under TACS No. 54808. This review involved a set of Technical Specifica-tions (TS) problem sheets for the Grand Gulf Nuclear Station Unit 1, as prepared by MP&L. The problem sheets were in two categories: one cate-gory includes those for which the resolution proposed by MP&L would re-quire TS changes (342-372); and the other includes those for which the MP&L proposed resolution would involve FSAR changes (815-832). We have reviewed these sheets to determine the problem sheet numbers for which the staff believes TS changes are needed for a full power license amend-ment.

The CSB has identified four (4) TS problem sheets which are within its scope of responsibility. They are 817, 818, 823, and 824. We have deter-mined, however, that none of these items need to be resolved prior to authorizing full power operations.

Should you have problems or questions with our assessment, please contact us.

[f +

L.

i5 8405170036 840503 ADOCK05000g6 R. W. Houston, Assistant Director CF for Reactor Safety.,

Divisio of Systemsyntegration /G

. !!$...............htafran,,co JKudri

,,g WButler,,,,h o[n/,(

CS,B,: D CSB:D CSB:DSI,,[AD@.b f omcc)

....(0X{.A.CT1. A. Notafranc esco. CSB,.

Y sunour>

j om>.....cc.:....see. 1 ext..Page.,...

..Vh1.8..

5/h.6A.L....5/.f.M......

.3/Jd8.4..

nne rORM 318 00-80) NRCM oso OFFICIAL RECORD COPY usaro

..,_333.ooo

T. Novak cc:

R. Mattson R. Capra D. Ilouston L. Kintner F. Miraglia C. Thomas D. Brinkman D. Hoffman DISTRIBUTION 7 Docket File, ' 50-416^. 6 CSB Rdg.

ANotafrancesco JKudrick WButler AD/RS Rdg.

OF F ICE )

sun ~Auty DAT E) une r onu aa oo.00) uncu 02.

OFFICIAL RECORD COPY