ML20132C165

From kanterella
Jump to navigation Jump to search
Forwards Power Sys Branch SER Re Revised Interim Tech Specs for Diesel Generators & Gas Turbine Generators
ML20132C165
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/22/1984
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 NUDOCS 8406010049
Download: ML20132C165 (5)


Text

L-e g'

To, UNITED STATES y

p NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20t55 o

s., -...../

MAY 2 21984 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Lici:nsing DL FROM:

L. 5. Rubenstein, Assistant Director for Core and Plant Systems, DSI REVISED INTERIM TECHNICAL SPECIFICATIONS FOR DIESEL GENERATORS

SUBJECT:

AND GAS TURBINE GENERATORS AT GRAND GULF - SER The Power Systems Branch /DSI has prepared the enclosed SER in support of the interim technical specifications for DGs and GTGs at Grand Gulf. This is to facilitate MP&L to proceed with the disassembly and inspection of one of the TDI engines and take corrective actions as necessary during low power operation.

(

b[\\ UA.

L~ ~'

L. S. Ru'kenstein Assistant Director for Core and Plant Systems Division of Systems Integration

Enclosure:

As stated cc:

R. Mattson D. Eisenhut M

L. Kintner W. Houston B. Sheron D. Houston J. Knight M. Srinivasan S. Rhow l

o (j

' O,y g it 4 ' T

Contact:

S. Rhow x28698 e dQ N fi p--

/

xs 1