ML20133B253

From kanterella
Jump to navigation Jump to search

Forwards Table Prioritizing Problems for Resolution According to Safety Significance.Review Requested Under TAC 54458 Complete
ML20133B253
Person / Time
Site: Grand Gulf 
Issue date: 03/20/1984
From: Houston R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML19276B572 List: ... further results
References
FOIA-84-459 TAC-54458, NUDOCS 8507200259
Download: ML20133B253 (2)


Text

c j# *%

UNITED ST TES

/.

j*

NUCLEAR REGULATORY COMMIS$10N g. ! ry#f gg WASHINGTON, D. C. 20555 me-

'[' bm j

%,".../

MAR 2 0 1984 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:

R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration

SUBJECT:

REVIEW 0F GRAND GULF UNIT 1 TECHNICAL SPECIFICATION PROBLEM SHEETS Plant Name:

Grand Gulf - Unit 1 Docket No.:

50-416 Licensing Status:

OL Project Manager:

D. Houston Review Branch:

ICSB Review Status: Complete for TACS 54458 As requested in TAC No. 54458, the Instrumentation and Control Systems Branch (ICSB) has reviewed the 248 problem sheets provided by the licensee for Grand Gulf - Unit 1 (Mississippi Power and Light Company).

Based on the review of the problem descriptions, the ICSB has determined that 69 of the 248 problems are within their scope of review. As re-quested, we have prioritized these 69 problems for resolution according to their safety significance. The enclosed Table identifies (1) 46 priority 1 items that should be resolved before Grand Gulf - Unit 1 ex-ceeds 5 percent of rated thennal power, (2) three priority 2 items that should be resolved during power escalation and (3) 20 priority 3 items that should be resolved during the first cycle of operation. This com-pletes the review requested under TAC 54458.

< Wh/

m 8507200259 850515

1. Wayne Houston, Assistant Director PDR FOIA BELL 84-459 for Reactor Safety PDR Division of Systems Integration

Enclosure:

As stated cc:

R. Mattson R. Capra

.L. Kintner D. Hof fman D. Houston

Contact:

M. Virgilio, ICSB X29454

ENCLOSURE PRIORITIZATION OF THE TECHNICAL SPECIFICATION PROBLEMS IDENTIFIED BY MISSISSIPPI POWER & LIGHT THAT ARE WITHIN THE ICSB SCOPE PRIORITY 1 PRIORITY 2 PRIORITY 3 004*

158

  • 189 003 005
  • 165 204 009 010 198
  • 207 040 011 199 047 013 202 +

049 014 205 074 015 211 079'"

016',

212 +

110 022*

213*

115 023+

216

  • 118 029 217
  • 120 030 218
  • 122 034
  • 197 037
  • 200 038 201 050 206 054
  • 210 056 237 066 238 075
  • 239 077A 078
  • 080*

081

  • 082*

083

  • 084
  • 103+

111

  • 112 114+

116

  • 119+

151+

  • Previously identified in the memorandum from F. Rosa to C. Thomas, dated October 31, 1983,

Subject:

Grand Gulf Unit 1; ICSB Revit w of Technical Specifications.