Monthly Operating Repts for Dec 1992 for Zion Generating Station
ML20127F732
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/31/1992
From: Cygan J, Joyce T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ZAD-92-014, ZAD-92-14, NUDOCS 9301210009
Download: ML20127F732 (14)


Text

'

Comm:nwealth Edisun foi Sh bb Zion. Illinois 600.J

, Telephone 708 / 746-2084 January 12, 1993-2AD-92-014 Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555

Dear Sir:

Attached is the December 1992 Operating Status Report.

l fl J.- m l

T. P. Jo i Station anager Zion St tion TPJ/jlc Enclost,re l

cc: Regulatory Assurance USNRC Document Control

! M. Wallace A. B. Davis (NRC)

J. Leider L Rieck T. J. Kovach D. R. Eggett INPO Div. of Eng. Ilealth State of Illinois F. Yost B. Gallo H. Granjean NRC Inspector, Zion P. Graessle Operating Engrs, i C. Patel - Fax

! Master File l

l 2 CLERK MI) k l 9301210009 921231 i

!- PDR- ADOCK 05000295 PDR R _' 3

OPERATING DATA REPORT DOCKET N0._50-295 DATE 01/12LR3 COMPLETED BY J. Cvgan TELEPHONE l lq8) 746-208A_

13163 OPlRAllfiG_SIAIUS

1. Unit Name: __Z10D_Valt 1
2. Reporting Period: 0000.921201 to 2400 921231- Notes
3. Licensed Thermal Power (MHt): 3250
4. Nameplate Rating (Gross MHe): 1035_
5. Design Electrical Rating (Net MHe): 1040
6. Maximum Dependable Capacity (Gross MHe):_ JOE 5
7. Maximum Dependable Capacity (Net MHe): 1040
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A t
9. Power Level To Hhich Restricted If Any (Net MHe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative-
11. Hours In Reporting Period 744.0 _B.784.0 166.584.D_
12. Number Of Hours Reactor Has Critical 74dLO_ ._.AdQ51 112.43L5_
13. Reactor Reserve Shutdown Hours 0.Q_ 0.0 2.621.E_
14. Hours Generator On-line 744.0 4.311.2 -108.956.1
15. Unit Reserve Shutdown Hours 0,0_ 010_ 0.Q_
16. Gross Thermal Energy Generated (MHH) 2.339.109 __J2.702.735- _ 316.733.291
17. Gross Electrical Energy Generated (MHH)_l86d3L 4.287.26L 102J6LDL4_
18. Net Electrical Energy Generated (MHH) 76A 265_ 4.111.827 97.525.594
19. Unit Service Factor 1QQtQ_ 49.1 6524_
20. Unit Availability Factor 100.0 49.1 65.4
21. Unit Capacity Factor (Using MDC Net) 98.8 45.0 56.3
22. Unit Capacity Factor (Using DER Net) 98.8 45.0 5623_
23. Unit Forced Outage Rate 0.0 10.0 16 . H_-
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test _ Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-5(2)

]

OPERATING DATA REPORT 1 1

DOCKET NO._50:304 DATE_OlI12/93 COMPLETED BY_L_Cysan TELEPHONE _1208) 746-20BL -1 x3169 OEERAllM_SJAIUS

1. Unit Name: _ Zion Unit 2 _ _
2. Reporting Period: 0000_92120l_to_2iOQ_921231 Notes
3. Licensed Thermal Power (MHt):_ _3250
4. Nameplate Rating (Gros! MHe): 1035
5. Design Electrical Rating (Net MWe): 1040
6. Maximum Dependable Capacity (Gross MHe):__J085_
7. Maximum Dependable Capacity (Net MHe): 1040_
8. If Changes Occur in Capacity Ratings (Items Number 3 Through-7)-Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MHe);- N/A-
10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 744.Q_ B,18420_ 150.22120_ -
12. Number Of Hours Reactor Has Critical- 0.0 5.758.7 114.537.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 22EtL_
14. Hours Generator On-Line 0.0 5.747.0 111.579.0
15. Unit Reserve Shutdown Hours 0 . 0__ __ 0.Q_ 02 0_-
16. Gross Thermal Energy Generated (MHH) 0.0 16.703.931 _33Q 692.31Q_
17. Gross Electrical Energy Generated (MHH) 0.0- Su627.978 106.167.935
18. Net Electrical Energy Generated (MHH) 0,_0_ __5.25LD5L 101.110.65L.
19. Unit. Service Factor _ Q 0_ 65.4 -69.6
20. Unit Availability Factor- _

01 0_ -65.4 6216_ .

21. Unit Capacity Factor (Using MDC Net)- 0.0 58.7 60.7
22. Unit Capacity Factor (Using DER Net) 00, 1 5821_ 60.7
23. Unit Forced Outage Rate _

0.0. 25.1 15.5_'

24. Shutdowns Scheduled Over Next-6 Months (Type Date, and Duration of Each):

Z2R12 - Refugling 11/12/92 - 02/25/93

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 02/25/92_~
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY' ___

INITIAL ELECTRICITY COMMERCIAL-OPERATION ZCLERK-5(3)

_. m

+ ,

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO. 50-295 -

UNIT NAME Zion Unit 1 DATE _01/12/93 -

COMPLETED BY L_Cygan TELEPHONE (708) 746-2084 x3169 REPORT MONTH December 1992_

Duration Method of Licensee Systgm Compogent Cause & Corrective No. Date Type l (Hours) Reason 2 Shutting Event Code Code Action to Down Report # Prevent Recurrence Reactor 3 92/01/12 F 72 F 5 Unit was on line the entire month. Power was limited to 967.

due to Delta T fluctuation.

Restriction lifted on 12/04/93.

I 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File 0-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & Licensee Examination ~5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source 4

H-Other (Explain)

. ZCLERK-5(4)

_. _ _ .a

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO.

50-304 UNIT NAME Zion Unit 2 DATE 01/12/93 COMPLETED BY J. Cygan 3

TELEPHONE (708) 746-2084 x3169 REPORT HONTH December 1992 Duration Method of Licensee Systgm Compogent Cause &' Corrective No. Date Type l (Hours) Reason 2 Shutting Event Code Code Action to Down Report # Prevent Recurrence Reactor 3 92/11/!2 S 744.00 C Continuation of Refueling Outage 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions 5: Scheduled .A-Equipment' Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued .

(NUREG-0161)

E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error'(Explain) Exhibit 1 - Same Source.

H-Other-(Explain) f i .ZCLERK-5(5) l

. .- w

a 9

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO._50-295 UNIT Zion Unit 1 DATE 01/12/93 COMPLETED BY_L_fygan - -

TELEPHONE _11Q8) 746-2084

._13169 MONTH _Dftcember _1192

- DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY P0HER-LEVEL (MWe-Net) (MWe-Net) 1 1.021 17 1.057 2 1 J12 18 1.J57 3 1 ALO 19 1.041 4 1 J)) 20 1.014 5 1.055 21 1.025 6 __ 1 455 22 1 A25 7 1,054 23 1.016 8 1 A4a 24 1 -Q11 9 1451 25 976 10 1.049 26 1.011 11 1.050 27 996 12 1.015 28 968 13 1.015 29 995 14 989 30 1.040-15 1.05.2 31 1.051 16 LD52 INSTRUCTIONS On this format, list the average daily unit power level'in MWe-Net for each day _in the reporting month. Compute to the nearest whole megawatt.

ZCLERK.-5(6)

AVERAGE DAILY UNIT-POWER LEVEL DOCKET N0, 50-304 UNIT _IlotLUnit 2 DATE 01/12/93 COMPLETED BY_L_Cygan TELEPHONE _L103) 746-208.a_

-.x118 MONTH _.Densber_l932 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net) (MWe-Net) 1 -12 17 -11 2 -12 18 -11 3 -12 19 -12 4 -12 20 5 -12 21 -12 6 -12 _

22 - 12_.

7 __-J 2 23 -12 ,_

8 -12 24 -12 9 -12 25 -12 10 -12 26 -12 11 -12 27 -12 12 -12 28 -12 13 -12 29 14 -12 30 -11 15 -1 L 31 -12 16 -11 INSTRUCT 1035 On this format, list the average daily unit power level in MWe-Net for.each day in the reporting month. Compute to the nearest whole megawatt.

l ZCLERK-5(7)

D_etemberl992 SVtiMPY_0E0EERAIING_EXEEBIEllCE 3

UNIL1 Unit 1, began December at 96% l'ower. The Unit has been limited to 96%

power based on delta T fluctuation due to Eagle 21. On December 4, 1992 Rx power limit to 96% has been lifted.

UNIL2 -

Unit 2, began December in a Refueling Outage, Mode 6 and stayed there thru December 31, 1992.

ZCLERK-5(8) l

= .

4 ,

Qerember 1992 MJQiLSMITY RELAIED_BAINTENANCE E.au.j pmeRt_Name Hork_ferfstre.d (UNIT 1)-

IB BA Pump Low Recirc flow: Flow Gauge Recalibrated-005: 12/01/92 - 12/02/92 1C CH Pump Low Cooling Hater to Hotor:

005: 12/01/92 - 12/21/92 1A BA Pump Pump running noisy:

00S: 12/03/92 - 12/19/92

  1. 1 Pp Air Comp Head Repair: Repair & Test Completed 005: Continue - 12/06/92 "0" Pp Air Comp Switch Calibration-Hater in system:

Problem Corrected & Calibrated 005: 12/05/92 - 12/05/92 OA CC Pump Rotor Axial Movement:

005: 12/09/92 - Continued

  • IB BA Pump Inspect / Replace filter / Pump Not Pumping: Pump Repaired 005: 12/16/92 - 12/18/92 1C HOR Pump IM Surveillance: Surveillance Completed OOS: 12/26/92 - 12/27/92 "0" Pp Air Comp Inspect / Clean Cooler:

005: 12/28/92 - Continued **

OA Fire Pump Sheared Sensing Line:

005: 12/30/92 - Continued ***

COMMENT:

Completion of Hork on 0A CC Pump is scheduled for 1/2/93-Completion of Work on "0" Pp Air Compressor is scheduled for 1/5/93 Completion Date for 0A Fire-Pump is under review.

ZCLERK-5(9)

x Dnember 1932 MMQ[LSAFETY- RELAll0_MIBIEHANCE EsulamenLName Hori ferforme31 R (UNIT 2) 1 REFUELING OUTAGE  !

l 1

3- ZCLE RK-5( 10) ---

u REEUELIRG_INEORMAIl0!LRE0 VEST Questions:

1. Name of facility.
2. Scheduled date for next refueling shutdown.
3. Scheduled date for restart following refueling.
4. Hill refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If answer is yes, what, in general, will theee be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

If no such review has taken place, when is it scheduled?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations associated with refueling, e. g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

l l Page 1 of 3 ZCLERK-5(ll)

UnLLL_ Answer:s

1. Zion Unit 1 4
2. Cycle 13 is scheduled to shutdown September 9, 1993 for refueling.
3. Cycle 14 is scheduled to start up January 7, 1994.
4. No Technical Specification changes are planned for Z1C14 so far.
5. Not applicable or none proposed.
6. Not applicable.
7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool from Zion Unit 1 is 784.
8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) i s 2112 fuel assemblies. Plans are being developed to rerack the Spent Fuel Pool to increase storage _ capacity to 3312 assemblies.
9. Zion Station will lose dual full core discharge capability _in-January 1994, at the beginning of Unit 1 Cycle 14, based on the-latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in January 1996, at the beginning of Unit 2 Cycle 15.-

4 Page 2 of 3 ZCLERK-5(12)-

y. < , a e + ..--e n, --aw - ~

,,g -

1 Unit 2_m Answers

1. Zion Unit 2
2. Cycle 12 was Shutdown November 12, 1992 for refueling.
3. Cycle 13 is scheduled to start up february 20, 1993.
4. Yes. Technical Specification changes have been made to include the i 14estinghouse VANTAGE fuel design being loaded for Z2C13. and effects of the vessel fluency reduction program beginning with Z2C13.  ;

A Tech Spec change has also been made that will allow CECO to use a ,

CORE OPERATING LlH115 REPORT (COLR) in place of some existing Tech '

Spec Limits.

5. License amendments for the 22C13 reload were submitted in Summer 1991, and were approved July 26, 1992 Amendment 128. ,
6. License considerations associated with the 22C13 reload-include the new VANTAGE fuel design, and the new LOCA-analysis with higher core power peaking factors required for the low-low-leakage loading-pattern used in 22C13.
7. The number of fuel assemblies a) in the core is 144 (as of 1/11/93 at 14:45), and b) in the spent fuel storage pool from Zion Unit 2 is 789 (as of 1/11/93 at 14:45).
8. The present licensed spent fuel pool storage capacity (shared with' Zion Unit 1) i s 2112 fuel assemblies. Plans are being developed to rerack the Spent fuel Pool to increase storage capacity to 3012 assemblies.

i'

9. Zion Station will lose dual full core discharge capability in January 1994, at the beginning of Unit 1 Cycle 14, based on the latest '

Nuclear Stations Refueling Schedule. Full-core discharge capability-for a single core will be lost in January 1996, at the beginning of Unit'2 Cycle 15.

)

Page 3 of 3 ZCLERK-5(13) -

ri- ,....i ..v.,,,,ce ,- r , nd , ,. ., ;-, ..-.--~~...,--w..,

,.,...v~,- -,<-n--r,- -rn ~ _a,,-,- --,r-+ ,. --- L ,. r ,

ADDENDUH TO ZION STATION HONTHLY REPORT  ;

Special Report submitted in accordance with Zion Tech Spec. Sury. 4.14.B. 5  ;

This report addresses one invalid failure of the 0 EDG. The criteria to

  • determine valid tests and failures is in accordance with section C.2.e of t Reg. Guide 1.108.

On December 21, 1992 the 0 EDG tripped during PT-11 (the_ monthly operability L surveillance). The engine tripped immediately upon reaching operating speed.

Troubleshooting by Tech Staff revealed a failed solenoid valve in a portion of :

the control system that is bypassed in the emergency mode. The-solenoid was replaced and the EDG was returned to service on December 22, 1992_following the successful completion of PT-11. This failure was determined to be-invalid per Reg. Guide 1.108 C.2.e.

As of December 30, 1992 the test frequency for 0 EDG remains at 31 days.

l ZCLERK-5(14) l t -- .