MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
'
Comm:nwealth Edisun foi Sh bb Zion. Illinois 600.J
, Telephone 708 / 746-2084 January 12, 1993-2AD-92-014 Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555
Dear Sir:
Attached is the December 1992 Operating Status Report.
l fl J.- m l
T. P. Jo i Station anager Zion St tion TPJ/jlc Enclost,re l
cc: Regulatory Assurance USNRC Document Control
! M. Wallace A. B. Davis (NRC)
J. Leider L Rieck T. J. Kovach D. R. Eggett INPO Div. of Eng. Ilealth State of Illinois F. Yost B. Gallo H. Granjean NRC Inspector, Zion P. Graessle Operating Engrs, i C. Patel - Fax
! Master File l
l 2 CLERK MI) k l 9301210009 921231 i
!- PDR- ADOCK 05000295 PDR R _' 3
OPERATING DATA REPORT DOCKET N0._50-295 DATE 01/12LR3 COMPLETED BY J. Cvgan TELEPHONE l lq8) 746-208A_
13163 OPlRAllfiG_SIAIUS
- 1. Unit Name: __Z10D_Valt 1
- 2. Reporting Period: 0000.921201 to 2400 921231- Notes
- 3. Licensed Thermal Power (MHt): 3250
- 4. Nameplate Rating (Gross MHe): 1035_
- 5. Design Electrical Rating (Net MHe): 1040
- 6. Maximum Dependable Capacity (Gross MHe):_ JOE 5
- 7. Maximum Dependable Capacity (Net MHe): 1040
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A t
- 9. Power Level To Hhich Restricted If Any (Net MHe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative-
- 11. Hours In Reporting Period 744.0 _B.784.0 166.584.D_
- 12. Number Of Hours Reactor Has Critical 74dLO_ ._.AdQ51 112.43L5_
- 13. Reactor Reserve Shutdown Hours 0.Q_ 0.0 2.621.E_
- 14. Hours Generator On-line 744.0 4.311.2 -108.956.1
- 15. Unit Reserve Shutdown Hours 0,0_ 010_ 0.Q_
- 16. Gross Thermal Energy Generated (MHH) 2.339.109 __J2.702.735- _ 316.733.291
- 17. Gross Electrical Energy Generated (MHH)_l86d3L 4.287.26L 102J6LDL4_
- 18. Net Electrical Energy Generated (MHH) 76A 265_ 4.111.827 97.525.594
- 19. Unit Service Factor 1QQtQ_ 49.1 6524_
- 20. Unit Availability Factor 100.0 49.1 65.4
- 21. Unit Capacity Factor (Using MDC Net) 98.8 45.0 56.3
- 22. Unit Capacity Factor (Using DER Net) 98.8 45.0 5623_
- 23. Unit Forced Outage Rate 0.0 10.0 16 . H_-
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test _ Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ZCLERK-5(2)
]
OPERATING DATA REPORT 1 1
DOCKET NO._50:304 DATE_OlI12/93 COMPLETED BY_L_Cysan TELEPHONE _1208) 746-20BL -1 x3169 OEERAllM_SJAIUS
- 1. Unit Name: _ Zion Unit 2 _ _
- 2. Reporting Period: 0000_92120l_to_2iOQ_921231 Notes
- 3. Licensed Thermal Power (MHt):_ _3250
- 4. Nameplate Rating (Gros! MHe): 1035
- 5. Design Electrical Rating (Net MWe): 1040
- 6. Maximum Dependable Capacity (Gross MHe):__J085_
- 7. Maximum Dependable Capacity (Net MHe): 1040_
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through-7)-Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MHe);- N/A-
- 10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744.Q_ B,18420_ 150.22120_ -
- 12. Number Of Hours Reactor Has Critical- 0.0 5.758.7 114.537.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 22EtL_
- 14. Hours Generator On-Line 0.0 5.747.0 111.579.0
- 15. Unit Reserve Shutdown Hours 0 . 0__ __ 0.Q_ 02 0_-
- 16. Gross Thermal Energy Generated (MHH) 0.0 16.703.931 _33Q 692.31Q_
- 17. Gross Electrical Energy Generated (MHH) 0.0- Su627.978 106.167.935
- 18. Net Electrical Energy Generated (MHH) 0,_0_ __5.25LD5L 101.110.65L.
- 19. Unit. Service Factor _ Q 0_ 65.4 -69.6
- 20. Unit Availability Factor- _
01 0_ -65.4 6216_ .
- 21. Unit Capacity Factor (Using MDC Net)- 0.0 58.7 60.7
- 22. Unit Capacity Factor (Using DER Net) 00, 1 5821_ 60.7
- 23. Unit Forced Outage Rate _
0.0. 25.1 15.5_'
- 24. Shutdowns Scheduled Over Next-6 Months (Type Date, and Duration of Each):
Z2R12 - Refugling 11/12/92 - 02/25/93
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 02/25/92_~
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY' ___
INITIAL ELECTRICITY COMMERCIAL-OPERATION ZCLERK-5(3)
_. m
+ ,
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
DOCKET NO. 50-295 -
UNIT NAME Zion Unit 1 DATE _01/12/93 -
COMPLETED BY L_Cygan TELEPHONE (708) 746-2084 x3169 REPORT MONTH December 1992_
Duration Method of Licensee Systgm Compogent Cause & Corrective No. Date Type l (Hours) Reason 2 Shutting Event Code Code Action to Down Report # Prevent Recurrence Reactor 3 92/01/12 F 72 F 5 Unit was on line the entire month. Power was limited to 967.
due to Delta T fluctuation.
Restriction lifted on 12/04/93.
I 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File 0-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & Licensee Examination ~5-Reduced Load F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source 4
H-Other (Explain)
. ZCLERK-5(4)
_. _ _ .a
UNIT SHUTDOWNS AND POWER REDUCTIONS ,
DOCKET NO.
50-304 UNIT NAME Zion Unit 2 DATE 01/12/93 COMPLETED BY J. Cygan 3
TELEPHONE (708) 746-2084 x3169 REPORT HONTH December 1992 Duration Method of Licensee Systgm Compogent Cause &' Corrective No. Date Type l (Hours) Reason 2 Shutting Event Code Code Action to Down Report # Prevent Recurrence Reactor 3 92/11/!2 S 744.00 C Continuation of Refueling Outage 1 2 3 4 F: Forced Reason: Method Exhibit G - Instructions 5: Scheduled .A-Equipment' Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Trip Entry Sheets for Licensee C-Refueling 3-Auto Trip Event Report (LER) File D-Regulatory Restriction 4-Continued .
(NUREG-0161)
E-Operator Training & Licensee Examination 5-Reduced Load F-Administrative 5 G-Operational Error'(Explain) Exhibit 1 - Same Source.
H-Other-(Explain) f i .ZCLERK-5(5) l
. .- w
a 9
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO._50-295 UNIT Zion Unit 1 DATE 01/12/93 COMPLETED BY_L_fygan - -
TELEPHONE _11Q8) 746-2084
._13169 MONTH _Dftcember _1192
- DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY P0HER-LEVEL (MWe-Net) (MWe-Net) 1 1.021 17 1.057 2 1 J12 18 1.J57 3 1 ALO 19 1.041 4 1 J)) 20 1.014 5 1.055 21 1.025 6 __ 1 455 22 1 A25 7 1,054 23 1.016 8 1 A4a 24 1 -Q11 9 1451 25 976 10 1.049 26 1.011 11 1.050 27 996 12 1.015 28 968 13 1.015 29 995 14 989 30 1.040-15 1.05.2 31 1.051 16 LD52 INSTRUCTIONS On this format, list the average daily unit power level'in MWe-Net for each day _in the reporting month. Compute to the nearest whole megawatt.
ZCLERK.-5(6)
AVERAGE DAILY UNIT-POWER LEVEL DOCKET N0, 50-304 UNIT _IlotLUnit 2 DATE 01/12/93 COMPLETED BY_L_Cygan TELEPHONE _L103) 746-208.a_
-.x118 MONTH _.Densber_l932 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net) (MWe-Net) 1 -12 17 -11 2 -12 18 -11 3 -12 19 -12 4 -12 20 5 -12 21 -12 6 -12 _
22 - 12_.
7 __-J 2 23 -12 ,_
8 -12 24 -12 9 -12 25 -12 10 -12 26 -12 11 -12 27 -12 12 -12 28 -12 13 -12 29 14 -12 30 -11 15 -1 L 31 -12 16 -11 INSTRUCT 1035 On this format, list the average daily unit power level in MWe-Net for.each day in the reporting month. Compute to the nearest whole megawatt.
l ZCLERK-5(7)
D_etemberl992 SVtiMPY_0E0EERAIING_EXEEBIEllCE 3
UNIL1 Unit 1, began December at 96% l'ower. The Unit has been limited to 96%
power based on delta T fluctuation due to Eagle 21. On December 4, 1992 Rx power limit to 96% has been lifted.
UNIL2 -
Unit 2, began December in a Refueling Outage, Mode 6 and stayed there thru December 31, 1992.
ZCLERK-5(8) l
= .
4 ,
Qerember 1992 MJQiLSMITY RELAIED_BAINTENANCE E.au.j pmeRt_Name Hork_ferfstre.d (UNIT 1)-
IB BA Pump Low Recirc flow: Flow Gauge Recalibrated-005: 12/01/92 - 12/02/92 1C CH Pump Low Cooling Hater to Hotor:
005: 12/01/92 - 12/21/92 1A BA Pump Pump running noisy:
00S: 12/03/92 - 12/19/92
- 1 Pp Air Comp Head Repair: Repair & Test Completed 005: Continue - 12/06/92 "0" Pp Air Comp Switch Calibration-Hater in system:
Problem Corrected & Calibrated 005: 12/05/92 - 12/05/92 OA CC Pump Rotor Axial Movement:
005: 12/09/92 - Continued
- IB BA Pump Inspect / Replace filter / Pump Not Pumping: Pump Repaired 005: 12/16/92 - 12/18/92 1C HOR Pump IM Surveillance: Surveillance Completed OOS: 12/26/92 - 12/27/92 "0" Pp Air Comp Inspect / Clean Cooler:
005: 12/28/92 - Continued **
OA Fire Pump Sheared Sensing Line:
005: 12/30/92 - Continued ***
COMMENT:
Completion of Hork on 0A CC Pump is scheduled for 1/2/93-Completion of Work on "0" Pp Air Compressor is scheduled for 1/5/93 Completion Date for 0A Fire-Pump is under review.
ZCLERK-5(9)
- x Dnember 1932 MMQ[LSAFETY- RELAll0_MIBIEHANCE EsulamenLName Hori ferforme31 R (UNIT 2) 1 REFUELING OUTAGE !
l 1
3- ZCLE RK-5( 10) ---
u REEUELIRG_INEORMAIl0!LRE0 VEST Questions:
- 1. Name of facility.
- 2. Scheduled date for next refueling shutdown.
- 3. Scheduled date for restart following refueling.
- 4. Hill refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will theee be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations associated with refueling, e. g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
- 7. The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
l l Page 1 of 3 ZCLERK-5(ll)
UnLLL_ Answer:s
- 1. Zion Unit 1 4
- 2. Cycle 13 is scheduled to shutdown September 9, 1993 for refueling.
- 3. Cycle 14 is scheduled to start up January 7, 1994.
- 4. No Technical Specification changes are planned for Z1C14 so far.
- 5. Not applicable or none proposed.
- 6. Not applicable.
- 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool from Zion Unit 1 is 784.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) i s 2112 fuel assemblies. Plans are being developed to rerack the Spent Fuel Pool to increase storage _ capacity to 3312 assemblies.
- 9. Zion Station will lose dual full core discharge capability _in-January 1994, at the beginning of Unit 1 Cycle 14, based on the-latest Nuclear Stations Refueling Schedule. Full core discharge capability for a single core will be lost in January 1996, at the beginning of Unit 2 Cycle 15.-
4 Page 2 of 3 ZCLERK-5(12)-
- y. < , a e + ..--e n, --aw - ~
,,g -
1 Unit 2_m Answers
- 1. Zion Unit 2
- 2. Cycle 12 was Shutdown November 12, 1992 for refueling.
- 3. Cycle 13 is scheduled to start up february 20, 1993.
- 4. Yes. Technical Specification changes have been made to include the i 14estinghouse VANTAGE fuel design being loaded for Z2C13. and effects of the vessel fluency reduction program beginning with Z2C13. ;
A Tech Spec change has also been made that will allow CECO to use a ,
CORE OPERATING LlH115 REPORT (COLR) in place of some existing Tech '
Spec Limits.
- 5. License amendments for the 22C13 reload were submitted in Summer 1991, and were approved July 26, 1992 Amendment 128. ,
- 6. License considerations associated with the 22C13 reload-include the new VANTAGE fuel design, and the new LOCA-analysis with higher core power peaking factors required for the low-low-leakage loading-pattern used in 22C13.
- 7. The number of fuel assemblies a) in the core is 144 (as of 1/11/93 at 14:45), and b) in the spent fuel storage pool from Zion Unit 2 is 789 (as of 1/11/93 at 14:45).
- 8. The present licensed spent fuel pool storage capacity (shared with' Zion Unit 1) i s 2112 fuel assemblies. Plans are being developed to rerack the Spent fuel Pool to increase storage capacity to 3012 assemblies.
i'
- 9. Zion Station will lose dual full core discharge capability in January 1994, at the beginning of Unit 1 Cycle 14, based on the latest '
Nuclear Stations Refueling Schedule. Full-core discharge capability-for a single core will be lost in January 1996, at the beginning of Unit'2 Cycle 15.
)
Page 3 of 3 ZCLERK-5(13) -
ri- ,....i ..v.,,,,ce ,- r , nd , ,. ., ;-, ..-.--~~...,--w..,
,.,...v~,- -,<-n--r,- -rn ~ _a,,-,- --,r-+ ,. --- L ,. r ,
ADDENDUH TO ZION STATION HONTHLY REPORT ;
Special Report submitted in accordance with Zion Tech Spec. Sury. 4.14.B. 5 ;
This report addresses one invalid failure of the 0 EDG. The criteria to
- determine valid tests and failures is in accordance with section C.2.e of t Reg. Guide 1.108.
On December 21, 1992 the 0 EDG tripped during PT-11 (the_ monthly operability L surveillance). The engine tripped immediately upon reaching operating speed.
Troubleshooting by Tech Staff revealed a failed solenoid valve in a portion of :
the control system that is bypassed in the emergency mode. The-solenoid was replaced and the EDG was returned to service on December 22, 1992_following the successful completion of PT-11. This failure was determined to be-invalid per Reg. Guide 1.108 C.2.e.
As of December 30, 1992 the test frequency for 0 EDG remains at 31 days.