O Y NIAGARA NuMOHAWK NIAGARA IdONAWK POWER CORPORATl0N/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 SAMUEL F. MANNO VICE PRESIDENT NUCLEAR CONSTRUCTION November 15, 1982 Chief, Management'Information Branch Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Transmitted herewith is our current submittal indicating the status of all activities as they appear in the new format for the NRC Yellow Book schedules:
Activity, Place Structural Concrete, NRC Node Nos. 0000 to 8015, is reported on schedule an is 83.0 percent complete.
Activity, Install Large Bore Process Pipe, NRC Node Nos. (not available),
is reported 1 month behind schedule and is 51.0 percent complete.
Activity, Install Large Bore Pipe Hangers, NRC Node Nos. 8305 to 8475, is reported 3 months behind schedule and is 31.0 percent complete.
Activity, Install Small Bore Pipe, NRC Node Nos. (not available) is reported 2 months behind schedule and is 2.0 percent complete.
Activity, Install Cable Tray, NRC Node Nos. 0000 to 8405, is reported 1.5 months behind schedule and is 55.0 percent complete.
Activity, Install Exposed Metal Conduit, NRC Node Nos. 0000 to 8405, is reported 1.5 months behind schedule and is 39.0 percent complete.
Activity, Install Power Control, Instrumentation and Security Cable, NRC Node Nos. 0000 to 8415, is reported 3 month behind schedule and is 4.0 percent complete.
i P
8504150338 840606 PDR FOIA KILLEFE84-367 PDR
\\
Page 2 Activity,-Install Electrical Terminations, NRC Node Nos. (not available)..
is reported 6 months behind schedule and is 0 percent complete.
The completion percentages are derived from CMS Reports that are current as of September 30, 1982.
i Total plant construction is 56.74 percent complete as of September 30, 1982.
Very truly yours,
"\\ /
y -[ /
S. F.' Manno Vice President Nuclear Construction
/djm xc: H. Reese (SWEC)
T. R. Loomis (w/ attachment)
R. J. Cohen (w/ attachment) j i
1 0
e,
. ~,.
l-
! NINE MILE POINT CONSTRUCTION STATUS REPORT PAGE 1'of'2-NUCLEAR STATION - UNIT 2 NUCLEAR POWER PLANTS STATUS AS OF: 9/30/82 PLANT CHARACTERISTICS:- KEY PERSONNEL:
j DOCKET NO:
05000410 ~
' CORPORATE CONTACT:
S. F. Manno,.Vice Pres., Nuclear' Construction CP ND. & DATE ISSUED:
CPR-112./ 06/24/82-CP EXPIRATION DATE:
07/13/78 CORPORATE ADDRESS:
300 ERIE BOULEVARD WEST APPLICANT:
NIAGARA MOHAWK POWER CORP.
SYRACUSE, NEW YORK 13202 -
PLANT LOCATION:-
IE REGION:
1 CORPORATE. PHONE NO:
(315)'474-1511 AE:.
STONE & WEBSTER NRC LPM:
.D.' Lynch NSSS:
GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
STONE & WEBSTER CONSTRUCTION:
R. Schultz REACTGt TYPE:
-TEST AND START UP:
DER - (ledE):
1080 IE RESIDENT INSPECTOR.
1 IINSPECTION STATUS:
FUEL LOAD DATE CHANGES TIPE PERIOD AS REPORTED BY UTILITY:
REPORT NEW REASONFOR CHANGE DATE SCHEDULE REPORTED BY UTILITY REPGtT BEG DATE END DATE NtNBER OF INSP.
OF INSP.
03/14/78 03/31/83 1.
. DESIGN CHANGES TO MITIGATE CONTAINMENT DYNAMIC LOADS l
l 2.
DESIGN CHANGES TO IMPLEMENT SEPARATION
-l REQUIREMENTS OF REG. GUIDE 1.75 12/14/78 03/31/84 1.
WORK STOPPAGES AND SHUTDOWN OF JOB 2.
DELAYS IN PROCUREMENT OF EQUIPMENT 3..
RE-ESTIMATE OF SCHEDULE POWER i
4.
HEATING DELAYS REQUIREMENTS 08/00/80 03/00/86 1.
POWER GENERATION CONTROL COMPLEX (PGCC) 2.
GEOLOGICAL IMPACTS t
- LOCAL PUBLIC DOCtNENT ROOM:
3.
MARK II: CONTAINMENT 4.
BIOLOGICAL SHIELD WALL STATE UNIVERSITY COLLEGE AT OSWEGO 5.
THREE MILE ISLAND IMPACTS
! PEIFIELD LIBRARY _
6.
NEW YORK STATE PUBLIC SERVICE COPMISSION t OSWEGO, NEW YGtK 13I26 l
l 1
l t
t
NINE MILE POINT CONSTRUCTION STATUS REPORT PAGE 2 of 2 NUCLEAR STATION - UNIT 2 N'JCLEAR POWER PLANTS STATUS AS OF: 9/30/82 FUEL LOAD DATES 1.12 CURRENT ESTIMATE FUEL LOAD DATE:
03/00/86 ESTIMATED CONSTRUCTION PERCENT COMPLETE:
56.74%
1.14 1.15 PREVIOUS ESTIMATE FUEL LOAD DATE: 04/00/84 1.16 ESTIMATE FUEL LOAD DATE 1.18 AT CONSTRUCTION PERMIT ISSUANCE: 05/01/78 1.19 CURRENT ESTIMATED COMMERCIAL COMMENTS ON CURRENT CONSTRUCTTONS STATUS 1.21 OPERATION DATE:
1.24 CON 5TRUCTION COMPLETION ESTIMATE 1.27 AS DEFINED IN CONSTRUCTION PERMIT:
1.28 1.29 MILESTONE DATES ESTIMATE ACTUAL ESTIMATED ACTUAL ESTIMATE 1.31 START START COMPLETE COMPLETE
% COMPLETE 1.32
- 1. MOBILIZE & PREPARE SITE:
08/25/75 08/25/75 08/01/76 08/01/76 100%
1.34
- 2. PLACE STRUCTURfL CONCRETE:
05/09/77 05/09/77 08/19/85 83%
1.35
- 3. INSTALL REACTOR PRESSURE VESSEL:
08/13/79 08/13/79 08/08/80 08/08/80 100%
1.36
- 4. INSTALL LARGE BORE PROCESS PIPE:
06/07/76 06/07/76 12/03/84 51%
1.37
- 5. INSTALL L.B. PIPE HANGERS, RSTR's & SNUBBERS:
09/05/77 09/05/77 12/03/84 31%
1.38
- 6. INSTALL SMALL BORE PIPE:
04/01/82 05/01/82 03/11/85 2%
1.39
- 7. INSTALL CABLE TRAY:
11/06/78 11/06/78 07/09/84 55%
1.40
- 8. INSTALL EXPOSED METAL CONDUIT:
09/12/77 09/12/77 08/12/85 39%
1.41
- 9. INSTALL PWR., CONTROL, INSTRU. & SEC. CABLE:
01/04/82 03/01/82 10/07/85 4%
1.42
- 10. INSTALL ELECTRICAL TERMINATIONS:
04/01/82 12/30/85 0%
1.43
- 11. CONDUCT REACTOR COLD HYDR 0 STATIC TEST:
04/29/85 05/20/85 1.44
- 12. CONDUCT HOT FUNCTIONAL TEST:
03/24/86 09/15/86 1.45
- 13. CONDUCT PREOP & ACCEPT TESTS NECESS. F/ FUEL LOAD:
11/14/83 02/24/86 1.46