Forwards Updated Const Status Repts as of 830331 for Inclusion in NUREG-0030,in Response to
ML20115A607
Person / Time
Site: 05000000, Shoreham
Issue date: 04/22/1983
From: James Smith
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 SNRC-878, NUDOCS 8504150435
Download: ML20115A607 (4)


Text

!

I LONG ISLAND LIGHTING COM PANY SHOREHAM NUCLEAR POWER STATION

, a b ~-our==-u.~

P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 Direct Dial Number April 22, 1983 S N RC-878 Chief, Management Information Branch Office of Management and Program Analyses U.S.

Nuclear Regulatory Commission Washington, DC 20555

  • > M O Construction Status Report, NUREG 4300' Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Sir:

In response to your letter, dated October 30, 1981, we submit the attached data for the Construction Status Report, NUREG 0300,for the first quarter, ending March 31, 1983.

Very truly yours, se

c. d.

J. L. Smith Manager, Special Projects VAB/ law Attachment cc:

J. Higgins "All Parties Listed on Attachment 1" B504150435 840606 LEF G -367 PDR FC 8935.1

ATTACHMENT 1 L;wrence Drenner, Esq.

- Herbert H. Brown, Esq.

Lawrence Coe Lanpher, Esq.

Administrative Judge Atomic Safety and Licensing Karla J. Letsche, Esq.

Kirkpatrick, Lockhart, Hill Bo0rd Panel U.S. Nuclear Regulatory Commission Christopher & Phillips W2 hington, D.C.

20555 8th Floor 1900 M Street, N.W.

Dr. Peter A. Morris Washington, D.C.

20036 Administrative Judge Mr. Marc W. Goldsmith Atomic Safety and Licensing Energy Research Group Board Panel 4001 Totten Pond Road U.S. Nuclear Regulatory Commission Waltham, Massachusetts 02154 W chington, D.C.

20555 MHB Technical Associates Dr. James H. Carpenter 1723 Hamilton Avenue Administrative Judge Atomic Safety and Licensing Suite K San Jose, California 95125 Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Stephen B. Latham, Esq.

Twomey, Latham & Shea 33 West Second Street Daniel F. Brown, Esq P.O. Box 398 Attorney Riverhead, New York 11901 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Ralph Shapiro, Esq.

Washington, D.C.

20555 Cammer and Shapiro, P.C.

9 East 40th Street Bernard M. Bordenick, Esq.

New York, New York 10016 David A.

Repka, Esq.

U.S. Nuclear Regulatory Commission Matthew J. Kelly, Esq.

Washington, D.C.

20555 State of New York Department of Public Service Three Empiro State Plaza JCmes Dougherty Albany, New York 12223 3045 Porter Street Washington, D.C.

20008 e

e t

'D 6

g

-g+-

-,_ ~,,,.--, -,, -, -

y-,,79-,-ww.=-----w--mr-~._w---

..-__y--..-----g-,y,-,

w 3

f n

CONSTRUCTION STATUS R E P O R T.

PAGE NO: '2-110 SHOREHAM NUCLEAR POWER-PLANTS STATUS AS OP: 3/31/83-l PLANT C H A R A C T E R I S.T I C S:

KOY P E R S O N N E L:

I DOCKET NO:

05000322 CORPORATE COffrACT:

M. S. POLLOCK, VICE PRESIDENT CP NO. & DATE ISSUED:

CPR-95 / 04-14-73 CP EXPIRATION DATE:

03-31-83 CORPORATE ADDRESS:

175 EAST OLD COUNTRY. ROAD APPLICANT:

IDNG ISLAND LIGHTING COMPANY HICKSVILLE, NEW YORK 11801 PLANT IDCATION:

BROOKHAVEE, NY _(LI)

IE REGION:

I CORPORATE PHONE NO:

(516) 733-4013 AE:

STONE & WEBSTER NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

STONE & WEBSTER MRC LPM:

R. CARUSO REACTOR TYPE:-

BWR IE PROJECT INSPECTOR:

L.-NARROW DER (MWE) 849 IE RESIDENT INSPECTOR:

J. C. HIGGINS INSPECTION S T A T U S:

FUEL L O A le DATE CHANGES AS REPORTED BY U T I L I T Y:.

TIME PERIOD REPORT.

NEW REASON FOR CHANGE I

REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILTTY-NUMBER OF INSP.

OF INSP.

02-20-74 12-00-77

1. CHANGE IN AEC SEISMIC C PIPE BREAK 82-23 10-25-82 11-19-82 CRITERIA RESULTED IN 2 MOtiTHS ADD-82-30 10-14-82 11-29-82 ITIONAL EFFORT IN THE INSTALLATION 82-32 11-5-82 12-10-82 OF PRIMARY CONTNMT & PRV PEDESTAL.

82-33 11-15-82 11-22-82

2. DIFFICULTIES ENCOUNTERED DURING 82-34 11-29-82 12-15-82 CONSTRUCTION OF PRIMARY CONTNMT 82-35 11-30-82 12-31-82 WALL & RPV PEDESTAL AND IMBEDMElfr 83-01 1-1-83 1-31-83 FOR PIPE BREAK INSIDE CONTNMT.

83-02 1-10-83 1-15-83 11/10/75 12-00-78 / LABOR STRIKES, UNAVAILABILITY OF MA-83-03 1-17-83 1-21-83 TERIAL, WEATHER & CONSTR. DIFFICULTIES 83-06 2-14-83 2-18-83 HAVE RESULTED IN A 12 MOffrH DELAY.

83-07 2-28-83 3-4-83 09-21-77 03-00-80

1. LATE DELIVERY OF PURCHASED MATERI-AL (PIPING & VALVES).
2. I4WER THAN EXPECTED LABOR PRODCVTY.
3. DESIGN CHANGES DUE TO REG. REQMTS.

01-10-79 06-00-80 MANPONER CONSTRAINTS & DESIGN PROCURE-MENT PROBLEMS.

LOCAL PUBLIC D0CUMENT R O O M:

02-00-80 11-00-80 NO REASON PROVIDED.

06-19-80 05-00-82 DELAY DUE TO COMPLETION,OF SYSTEMS.

06-09-81 09-00-82 DELAY DUE TO COMPLETION OF SYSTEMS.

SHOREHAM-WADING RIVER PUBLIC LIBRARY 09-30-82 02-00 DELAY IN SYSTEM COMPLETION DUE TO LATE ROUTE 25A MATERIAL DELIVERIES & FINAL PIPE STRS.

SHOREHAM, NEW YORK 11786 RECONCILIATION REVIEW.

12-31-82 05-00-83 DELAY IN. SYSTEM COMPLETION.

3-31-83 08-00-83 DELAY IN SYSTEM COMPLETION

l l

1 CONSTRUCTION STATUS REPORT PAGE NO:.2-111 NUCLEAR POWER PLANTS STATUS AS OF: 3/31/83 SHOREHAM

. CONSTRUCTION S T A T U S:

l APPLICANT'S CURRENT ESTIMATED FUEL IDADING DATE:

08-00-83 APPLICANT'S CONSTRUCTION COMPLETION ESTI-APPLICANT'S PREVIOUS ESTIMATED FUEL IDADING DATE:

05-00-83 MATE DEFINED IN CP: EARLIEST -

-APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

03-31-77 LATEST 00-83 APPLICANT'S CURRENP ESTIMATED COMMERCIAL OPERATION DATE:

02-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 97.1%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATE START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

11-00-72 03-00-73 100 %

PLACE STRUCTURAL CONCRETE:

03-00-73 12-00-77 100 %

INSTALL REACTOR PRESSURE VESSEL:

03-00-75 12-00-75 100 %

INSTALL LARGE EORE PROCESS PIPE:

05-00-75 10-00-79 100 %

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS _& SNUBBERS 07-00-75 05-31-83*

99 %

INSTALL SMALL BORE PIPE:

05-00-75 09-00-82 100 INSTALL CABLE TRAY:

02-00-76 08-00-82 100 %

INSTALL EXPOSED METAL CONDUIT:

02-00-76 05-00-83 99.9%'

INSTALL POWER, CONTROL, INSTRUMENTATION & SECURITY CABLE:

06-00-76 05-00-83 99.9%

INSTALL ELECTRICAL TERMINATIONS:

06-00-76 05-00-83 99.9%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

10-00-79 10-00-79 10-00-79 100 %

CONDUCT HOT FUNCTIONAL TEST:

.N/A N/A N/A N/A N/A CONDUCT PRECP ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

01-00-80 05-30-83 90 %

  • EXCLUDING ALL REWORKS
  • EST. COMPL. INCLUDES ALL QC INSPECTIONS