The Light NIII%f Ilointon Lighting & lher I!O. Ilos 1700 llouston.'lem,,001 (713) 22M211 April 29, 1983 ST-HL-AE-953 File Number: G25 R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear fir. Hartfield:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company has reviewed the entries for the South Texas Project in NUREG 0030, " Construction Status Report", dated October 1982. The reports for December 1982 and March 1983 have not been received.
Attached are annotated corrected copies of those pages from the October 1982 report which require changes to update NUREG 0030 through the first quarter of 1983.
If you have any questions, please call Mr. M. E. Powell at (713) 877-3281.
Very truly yours, J. H. Goldberg Vice President Nuclear Engineering & Construction MAM/kr Attachment 8504150429 840606 LE D -367 PCR
Houston Lighting & Pwer Company April 29, 1983 cc:
G. W. Oprea, Jr.
ST-HL-AE-953 J. H. Goldberg File Number: G25 J. G. Dewease Page 2 J. D. Parsons D. G. Barker-M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins NRC)
H.. E. Schierling NRC)
W. M. Hill, Jr.
NRC)
M. D. Schwarz Baker &Botts)
R. Gordon Gooch (Baker &Botts)
J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
2055,5 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City.of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Car 611na 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of Californi.
San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 12-20-82 l
e L
C00$TQOCTIOC 5TATUS REP 0RT PAGE N08 2-106,
SSWTM TEXAS 1 NUCLEAR POWER PLANTS STATUS AS OF8 00 ;; E a2 38-E3 PLANT CNARACTERISTIC$8 KEY P E R S O N N E Lt DOCRET Nor 35089498 CORPORATE CONTACT:
J. H. GOLDBERG. VICE PRESIDENT CP he. 8 DATE ISSUED: CPPR-128/ 12-22-75 MUCLEAR ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:
/2-3/- 87 CORPORATE ADDRES$t P. O. BOX 1789 APPLICANT:
NOUSTON LIGHTING 8 POWER COMPANY HOUSTON. TEXAS 77001 PLANT LOCATIDN8 12 MI SSW OF B AY CITY. TEX IE REGION
- 4 CORPORATE PHONE Mot (7t3) 486-3828 AE DECNTEL NSSSt WESTINGNOUSE CGMSTRUCTOR ESASCO NRC LPM S. 0~110 M. Sc hicP I;"1 REACTOR TYPE 8 PWR IE PROJECT INSPECTOR:
DER (MWE3
- 1259 IE RESIDENT INSPECTOR:
W. HILL INSPECTION 5TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED 5Y UTILITYa her, 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED BY UTILITY WUMBER OF INSP.
OF INSP.
~~
10-34-78 11-08-81 SCHEDULE REEVALUATION.
8205 83-39-82 94-92-82 01-18-80 89-00-83 SCHEDULE REEVALUATION.
8286 04-12-82 04-23-82 08-05-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.
8287 84-08-82 84-08-82 8288 e4-08-82 84-30-82 8289 35-08-82 e5-31-82 Inspectlen reports are avalIable at Iocal PDRs.
L0 CAL PURLIC D0CUMENT R 0 0 Mr MATAGORDA COUNTY LAW LIBRARY P. D. 30X 487 k
BAY CITY. TEXAS 77414 l
a
e C005TRUCTIOO 5TATUS REPORT PAGE N08 2-f87 NUCLEAR POWER PLANT 5 STATUS A5 0F 86-38-82 SouTN TEXA5 1 C0N5TRUCTION 5 T A T U 58 APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:
12-08-86 APPLICANTS CONSTRUCTION COMPLETIDH ESTIMATE AS A*PLICANT'S PREVIOUS ESTIMATED FUEL LDADING DATE:
89-08-85 DEFINED IN CP* (EARLIEST) /2-3946 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: 05-st-as (LATEST) # 7-J/ -8 7 APPLICANT'S CURRENT ESTIMATED C0tT1ERCI AL OPERATION DATE: 06-80-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE 8.66T~ gJ. Y 9, M P W
0 0
COMMENTS RECARDING CURRENT CONSTRUCTION STATUS ;;
- Jonaut.Eslim.4ed temple.flon a n d Pt N M b '"
blackyus bop l
L:66 represe.,h pwer-ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED STARY 118R1 COMPLETION 10t1PLETION LC0t!PL ETE 09-00-75 12-00-75 test MOBILIZE AND PREPARE SITE:
i;6. -1I~8L
- 14%
84-00-76 PLACE STRUCTURAL CONCRETE:
89-88-79 89-00-79 100%
INSTALL REACTOR FRE55URE VESSEL:
f0 00 87 JM'6ff, 18-00-78 INSTALL LARGE BORE PROCESS PIPE 18-88-78
,NW"// @o
~
INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SNUBBER 58 10-00-78 M 7%
INSTALL SMALL BORE FIPEt g ;co-B's g/y),
10-08-78 INSTALL CABLE TRAY:
b'."co'se JWrf~ yy, INSTALL EXPOSED METAL CONDUITS c9-4-81 p.2 INSTALL POWER CONTROL. INSTRUMENTATION AND SECURITY CABLE:
e;...,
.. ;; ee g2 /o INSTALL ELECTRICAL TERMINI.TIDM58 er JM"d 7, c6-02-$.
06-06-#6 0; ;;-i 44-44-46--
NA CONDUCT REACTOR COLD HYDROSTATIC TESTS NA CONDUCT NOT FUNCTIONAL TESTS 12- 0) ~ hY J2 -o f-86 CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD 64=44=44-44=44 NA
C0N5TRUCTION 3TATUS REP 0RT PAGE NO: 2-198-SCUTtt TEXA5 2 NUCLEAR POMER PLANT 5 STATUS A5 0Ft St-:- -"
sJ-Ju-]fi PLANT CNARACTERI5 TIC 52 KEY P E R 5 0 h N E La DOCKET Not 05000499 CORPORAiE CONTACT J. H. GOLD 8 ERG, VICE PRESIDENT CP 40. 8 DATE 155UEDt CPPR-129/ 12-22-75 NUCLEAR ENGINEERING 8 CONSTRUCTION t
CP EX*IP* TION DATE:
"O
- O! 12 J/-#7 CDRPORATE ADDRESS:
P. O. BOX 1700 APPLItahlt HOUSTON LIGHTING 8 POWER COMPANY HOUSTON, TEXA5 77001 PLANT LOCATION:
12 MI 55W 0F BAY CITY, TEX IE REGION:
4 CORPORATE PHONE MO:
(713) 486-3828 AE BECHTEL M555 WESTINGHOUSE
//. Sch;er//*J COM5TRUCTOR:
EBASCO NRC LPM:
O. "Ciis REACIOR TYPE:
DER (MWE)*
1250 IE RESIDENT INSPECTOR W. HILL IN5PECTION 5TATU58 FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REPORTED BY UTILITYa Acc. 19A2 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMEL{
OF INSP.
OF INSP.
10-30-78 11-00-82 SCHEDULE REEVALUATION, 8205 03-30-82 04-02-82 01-18-80 09-00-85 SCHEDULE REEVALUATION.
8206 04-12-82 04-21-82 08-05-82 12-08-88 CHANGE IN A/E AND CONSTRUCTOR.
8207 04-03-82 04-08-82 8208 04-08-82 04-30-82 8209 05-01-82 35-31-82 Inspection reports are available at I:::I PDRs.
L0 CAL PUSLIC D0CUMENT R 0 0 Mr MATACCRDA COUNTY LAW LIBRARY P. O. BOX 487 BAY CITY, TEXA5 77414
C0N5TRUCTION 5TATUS REP 0RT PAGE NO: 2-109 SOUTH TEXA5 2 NUCLEAR POWER PLANT 5 STATUS A5 0F 46-44 m 03 C0N5TRUCTION 5TATU5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATEt 12-00-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE 09-01-85 DEFINED IN CP ( E ARL IEST ) /2-J/.gg APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-81 (LATEST) /J.3j.gp APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-08-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: g 18.9 %
I COMMENTS RECARDING CURRENT CONSTRUCTION STATUS: "'?
- "M in ;ia;it.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iT E COMPLETION QMPLETION % COMPLETE MOBILIZE AND PREPARE *1TE:
09-00-75 12-00-75 test PLACE STRUCTURAL CONCRETE:
03-00-77 0
JW(,/7, Oy-e.0Y M -at-64 A }.; ;7 44 IWr gej, INSTALL REACTOR PRESSURE VESSEL:
{
INSTALL LARGE SORE PROCESS PIPE:
m og C/-82
// G7 0' :.=
Jeg f g 02-egt3 cS= m-80 INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SMUBBERS:
!?. 01-44-ee JWI 4 %
oz Q. BS INSTALL SMALL BORE PIPE:
54-44-44
//-o/-82 0. 00 JWL'/ '),
{1 11-07 INSTALL CABLE TRAY:
+7-44-99
/2 -/f-82
.: ;; 07 JHL o*7, or-oz- #8 INSTALL fp06EG METAL CONDUIT 47-99-99 C3*#0'7I N
A 27, fr-et-les qGr-o{ 40 INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
-ta-44 _?-0.
OC
,NA 07, eg-ee-K sq.ct-N INSTALL ELECTRICAL TERMINATIONS:
. 0: ;;
- 4. ;; ;;
)l(O%
o4-u-g
,*- a-se CONDUCT REACTOR COLD NYDROSTATIC TEST S' - :..
44-49-99 NA NW-N~ -
NA CONDUCT HOT FUNCTIONAL TEST l
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 12-08-86 12-08-88 NA e
,