ML20115A660
Text
"
t f
r.
o ILLINDIS POWER COMPANY f
CLINTON POWER STATION, P.O. BOX 3M, CLINTON, ILLINOIS 61727 May14f1980 Mr. W. Lovelace Office of Management & Program Analysis Light Water Reactors Branch No. 1 Division of Project Management United States Nuclear Regulatcry Commission Washington, D.C.
20558
SUBJECT:
Updated Construction Schedule for Illinois Power Company's Clinton 1 Project
Dear Mr. Lovelace:
We are herewith submitting one (1) copy of the update construction schedule for Illinois Power Company's Clinton Unit #1 Project.
This was also submitted in January, 1980 but was not processed in the ' latest Yellow Book.
The enclosed network indicates the status'of construction through April, 1980, and includea, projections for completion of remaining work.
The project is estimated to be 67% complete as of April 30, 1980, with the date for start of fuel loading unchanged from the previous projection of April, 1982.
Note that this submittal includes a few revised dates and one (1) description change.
These items are shown with a cloud around the date or description.
No major milestones have been accomplished during this update period.
Four activities have started during this period, and they are:
1.
Install RHR pipe fittings and valves.
2.
Install standby liquid control system.
3.
Install core spray system.
4.
Install HPCS pump drive to suppression chamber suction header HPCS.
If there are any questions or comments, please contact us.
Very tr ly yours, h CI.
Aad(
V. C. Howard Supervisor - Planning & Scheduling VCH/dg 8504150470 840606 PDR FDIA KILLEFE84-367 PDR s
r.
9
- j. -
- Mr. W.
Lovelace May 14, 1980 Page 2 cc:
Mr. Richard C. Knop - w/ enc. (1)
Director, Region III Office of Inspection and Enforcement U.
S. Nuclear-Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr.
B. C..Buckley, Project Manager Light Water Reactors Branch No. 1 Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.
20558 L..J. Koch J. O. McHood G. M. Brashear G.
E. Wuller File
l l
j C 18 M S T R ll C T I e N S T A T If 5 RErGRT
, Mil.te V Al.l.lu ?
f*AEE ff3e 2'00f 11 le c L h A R ?911ER FlANTS SI Alif S A3 Wl's 03-31-8, a 11
't 1 R 18 C ~1 1nM S T A T U 38 Arrl IC ANT's Elft!RINI ESIIttAttle instil.19A01f86 #ATEe Arri IC AHt's rettVIOUS ESIIttAIEW IUEt tWARING 9%Tre 11 01-85 ArrtitANTS t9NSTRUCTIWil CDttrtEft9N ESIIttAtt A3 13-31-83 j Al*lllCANT'S L3tittAltp IVEt 10ADIMel NAIE Al Cr ISSifANCEO 92 99-79 ItAIE5f8 DEsgMtg IN tre ggARIggt:3 AtrllCAllt's CifRRENI EStitlAVEN CettttRICAL artRATIDH DAtte 35-01-e4 i
13/3I/84 l tilRRINT I SIlltaltp rtIICtMI CON 50Rt1CIIntf CettetElle 69.6 thfitlNf 3 RInAMillifG EURRENI C#llSIRifCfl#ll SIAL #Se l
EstitsAite Aclunt tssielaite actuat EsslilAlt stositIzE Afin rRtrARE si1Es 3 f A'll AIARL EDIlr1E11911 Cut:r.LEllvil 3 _C etir E 5/4/74 5/4/14 7/31/74 7/31/74 100 rlACE $lRilClifRAL CettCRE1Es ll/22/76 11/22/76 9/3/84 96 g INstAtt RtAcint FRE53URE VESSEle il/30/38 II/16/fil J1/30/81 11/30/81 100 g
IMi: Alt tAhnt enRE PRettss PIPE 6/12/78 6/12/78 6/25/84 83g Iris Ai t i ARnE sere rare MANGERS.RESINAINIS AND SNUSSENse
't 7/87/78 7/17/78 6/25/84 59x INSI All SilAll BORE FIRE 8 II/I/8I I[4/02 4/1/B$
35X Iris:All CARLE 1RAfs 3/28/77 3/28/77 2/27/84 84x Ns: Alt txrusto tee:At Counvlie 3/13/78 3/83/78 6/a/as 61 ins: All ruittR,teNIRele glisIRiitttfil4SInft AND StcDNISV cAg(Es 6/22/88 6/22/81 5/6/85 31 x i
IN5!Att ttEclRICAL IERillNA11RN58 3/11/02 5/4/82 9/19/85 6x Cunuucs REAtInn tota liveRestA Ic TESTS I/28/s3 3/25/85 0x ennhuct Not rustCeleffAt IESte 4/1/g5 9/9/85 0x cnubutt rRtur Alth AcctrlANCE TESTS litCESSARY FliR l'Utt tense 7/2/84 12/31/85 0x l
.