Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429
ML20115A641
Person / Time
Site: Mcguire, Catawba, 05000000, Cherokee
Issue date: 05/12/1983
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504150459
Download: ML20115A641 (9)


Text

,

c t

DuxE POWER GOMPANY.

P.O. box 33189 CHARLOTTE. N.C. 28242 g

HN. B. TUCKER TELernowz VA:s PREsaDENT

{yggg4g May 12, 1983 Chief, Management Information Branch Office of Resource Management U. S. Nuclear-Regulatory Commission Washington, D. C. 20555

\\

i Re: McGuire Unit 2, Docket No. 50-370 Catawba Units 1 and 2, Docket Nos. 50-413 and 50,414 Cherokee Unit 1, Docket No. 50-491

Dear Sir:

Attached please find First Quarter, 1983 Yellowbook (NUREG-0030) updates for the above referenced units. This update reflects the status of construction as of March 31, 1983. This will be the last update of McGuire Unit 2, due to receipt of an operating license on March 3, 1983, and of Cherokee Unit 1 which was canceled on April 29, 1983.

5 Very truly yours, 8.

/g Hal B. Tucker RDS/php Attachment cc:

Mr. W. H. Lovelace Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. K. N. Jabbour Office of Nuclear Reactor Regulation U. S. Nr. clear Regulatory Commission Washington, D. C. 20555

~.

I B40606

,(

ED g -367

J C0N5TRUCTIOH STATUS REPORT PAGE HO: 2-072,

MCGUIRE 2 HUCLEAR POWER PLAHTS STATUS AS OF: J3 4+<gf~~

3 a s - 13

/~~

s-PLANT CHARACTERISTIC 5:

KEY PERS0HHEL: /

DOCKET HO:

05000370 CORPORATE CONTACT:

M. B. 18 CREE. VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-84 / 02-23-73 MUCLEAR PRODUCIION. DUKE Poutt CS '

CP EXPIRATICH DATE:

03-01-77 CORPORATE ADDRESS:

P8 33189. 422 S. CNunCH STREET l

APPLICANT:

DUKE POWER CHARLeffE. NORIN CAROLINA 28242 PLANT LOCATION:

17 MI H OF CHARLOTTE, NC IE REGION:

2 CORPORATE PHONE HO:

Y(7043 373-4538 AE:

DUKE POWER HSSS:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER HRC LPM:

R. BIRKEL REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1180 IE RESIDENT INSPECTOR:

M. GRAHAM IHSPECTION $ T A T U S:

FUEL L0AD DATE CHAHGES TIME PERIOD AS REPORTED BY U T I L I T Y:

Jan. 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE igBEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

05-01-77 INITIALLY DELAYED IN RECEIVING CONSTRUCT-8201 01-11-82 01-15-82 IDH PERMIT. CONSTRUCTIDH DELAYED BY 8202 01-05-82 01-08-82 INCREASED DELIVERY TIME OF MATERIAL AND 8203 02-16-82 02-16-82 COMPONENTS.

07-26-74 12-15-77 CONSTRUCTION DELAYED BY INCREASED Inspection reports are available at local PDRs.

DELIVERY TIME OF MATERIAL AND COMPONENTS.

t 09-27-74 08-00-78 CONSTRUCTION DELAYS DUE TO CRITICAL CONDITIONS EXISTING IN THE FINANCIAL MARKETS.

04-21-76 09-15-18 HD REASON GIVEN BY THE UTILITY.

04-18-77 08-00-79 CONSTRUCTIDH DELAY.

08-16-77 H/S LATE EQUIPMENT DELIVERIES. DESIGH MODIFICATI0HS 09-20-77 10-10-80 DUE TO CHANGED REGULATORY REQUIREMENTS.

08-13-79 01-00-82 NO REASON GIVEN.

08-00-80 06-00-82 HD REASON PROVIDED.

10-29-81 04-01-83 NO REASON PROVIDED.

1 i

I LUCAL PUBLIC DDCUMEHT R 0 0 M:

PUBLIC LIBRARY OF CHARLOTTE l

AND MACKLENBURG COUNTY 310 NORTH TRYOH STREET i

CHARLOTTE, NORTH CAROLINA 28202 l

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-073 i

i MCGUIRE 2 NUCLEAR POWER PLANT $

STATUS AS OFs -t&-it &E--~

i

-Y-/~43 l

C0N5TRUCTION

$TATU5:

APPLICANT'S FUEL LOADING DATE:

[

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-76 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 14=4& CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:,75% fi COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION SQMPLETION MOBILIZE AND PREPARE SITE:

04-01-11 05-08-72 ~ % COMPLETE 100%

PLACE STRUCTURAL CONCRETE:

07-08-72 07-01-82 gggf INSTALL REACTOR PRESSURE VESSEL:

06-09-75 06-10-75 100%

INSIALL LARGE BORE PROCESS PIPE:

03-01-75 03-01-82 03-01-82 100%

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:

04-01-75 N

,SST' h-e v 9h

/**

INSTALL SMALL BORE PIPE:

04-01-78 03-01-82

'03-01-82 100%

INSTALL CABLE TRAY:

08-01-74 IP-tt-SE-

,SS%'

01-15-23

/"

INSTALL EXPOSED METAL CONDUIT:

08-01-74 07 :: 02-5%" -

o 5 08 - z.}

,9tT' INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABL,Es 04-01-77

?"-:!-5 4 -Ir-f r

/ea INSTALL ELECTRICAL TERMINATIONS:

04-15-77 03-Ot

^2-2 -ss - 31

,J5o CONDUCT REACTOR COLD NYDR0 STATIC TEST 07-19-82 S 1a4, P 2-07-28-82 C-auf. F1L

-t%

/40 CONDUCT HOT FUNCTIONAL TEST

  • 09-01-82 07.g0 -f3 10-26-82 7 14 -g7,

,JHr' CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LDAD:

10-27-82 bi-13 -8%

03-01-83 2 9-23

/##

I w

f

,e 11

C00$TRUCTIOO 5TATUS REPQRT PAGE HO: 2-018 CATAWBA 1 NUCLEAR P0WER PLAN fS STATUS AS OF 0: : C2 3 - A s - c t, -

PLANT CHARACTERI5 TIC 5:

KEY PERS0NHEL gF DOCKET NO:

65000413 CORPORATE CONTACT:

'N. B. TBCRER. VICE PRESIDENT CP HO. 4 DATE ISSUED: CPR-It6 / 08-07-75 NUCLEAR PRODUCflSN, DURE POWER CS,,

CP EXPIRATION DATE:

06-01-81 CORPORATE ADDRESS:

Pt 33 tat. 422 S. CNURCN SIREET APPLICANT:

Df!KE POWER CHARLeffE. NORIN CARetINA 24242 PLANT LOCATION:

6 MI NNW OF ROCK HILL. SC IE REGION:

2 CORPORATE PHONE NO (Pet) 373-4538 AE:

DUKE POWER

~

_7 NSSS:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER HRC LPM:

K. JABBOUR REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1845 IE RESIDENT INSPECTOR:

K. VAN DOORN INSPECTION $TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYi Jan. 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE l

REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 08-00-30 CONSTRUCTION DELAYS DUE TO CRITICAL 8201 02-23-82 02-26-82 CONDITIONS EXISTING IN THE FINANCIAL 8202 01-05-82 01-08-82 09-00-80 REVISED LOAD FORECASTS.

j MARKETS.

i 8203 12-26-81 01-25-82 05-00-77 8205 02-23-82 02-26-82 03-00-78 02-00-81 PROJECTED LOAD FORECAST.

8206 01-26-82 02-25-82 01-00-80 06-00-43 HQ REA50H REPORTED.

8207 02-26-82 03-25-82 05-01-80 04-00-83 HO REASON REPORTED.

08-00-80 08-00-83 MAJOR UNIT RESCHEDULE.

Inspection reports are avail,able at local PDRs.

05-00-82 11-00-84 HD REASON REPORTED.

k i

)

n L0 CAL PUBLIC D0CUMENT R 0 0 Mr YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL, SOUTH CAROLINA 29730 9

5 I

/\\

[*~

Q

C0N$TROCTION 5TATUS REP 0RT PAGE NO: 2-019 COTAWBA 1 NUCLEAR POWER PLANTS STATUS AS OF 84-5-t-87~

_I-11 -93 ~

C0NSTRUCTION 5TATUSi i

APPLICANT'S CtRRENT ESTIMATED FUEL LOADING DATE:

f >(-0 8-8 4 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS ISSUANCE:p M-08-H'pt DEFINED IN CP: (EARLIEST)

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

12-09-78 (LATEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP APPLICANT'S CURRENT ESTIM4TED COMMERCIAL OPERATION DATE: 07-- P 05-OL-oo -sc CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: M93 COMMENTS REGARDING CURRENT CONSTRUCTI0li STATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.

Nw Q FfA$r!

TA~~.

OT !::: ~,0 ;COULC CCCORT MA; 0"# tic!G 7;;; TIRST OT MtJ.

=0:::0xu On::=:M = :: :00:Ex: = := 0 02 : =0 =U:0 :C Jreras u.w.y seua.ra mpw uum %,GGMPLETED OY '"E its!

OT MAY.

%!Li "" "!OC I:'E "COULIC OT-THE-

-4&PDATE-EMSO4MMIOM :M !"E S EC0"O ""i"T C" U"0A T C.-

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START SQMPLETION COMPLETION 3_ COMPLETE MOBILIZE AND PREPARE SITE:

05-16-74 05-16-74 10-01-76 04-ot-76 100%

PLACE STRUCTURAL CONCRETE:

84-08-76 04-05-76 99%

INSTALL REACTOR PRES $URE VESSEL:

06-01-78 06-09-78 07-13-78 07-13-78 100%

INSTALL LARGE BORE PROCESS PIPE 04-01-77 04-08-77 98%

INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:

11-01-78 11-01-78 17.-00-83 2M S4 INSTALL SMALL BORE PIPE:

N/A N/A N/A N/A N/A INSTALL CABLE TRAY:

N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT N/A N/A N/A N/A N/A INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

08-01-78 08-21-78 4-00-64 Set 97 INSTALL ELECTRICAL TERMINATIONS:

09-08-78 10-06-78 J M J499 Z, CONDUCT REACTOR COLD NYDR0 STATIC TEST:

eg-ca 83 og. oo - $3 0%

CONDUCT NOT FUNCTIONAL TEST:

j p,. 00 -Tr3

/- 00-81 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

p go-M 0%

O i

C0H$TRUCTION 5TATUS REP 0RT PA9E NO: 2-020 CATAWBA 2 HUCLEAR POWER PLAHTS STATUS AS OF 44-1111MI ~

~ 3-2r-

]

'N PLAHT CHARACTERI$TICSt KEY P E R S 0 N N E Lt*

E[

M. B. TUCEER. VICE PRESIDENT DOCKET N05 05000414 CORPORATE C0HTACTt DUCLEAR PRODUCll0W. DUKE PoutR CO.

CP HO. 3 DATE ISSUED:

CPR-St? / 08-07-75 PB 33189. 422 S. CmWACH SlaEEI CP EXPIRATION DATE:

06-01-82 CORPORATE ADDRES$8 ChARLSIIE. NORIN CAROLINA 24242 APPLICANT:

DUKE POWER PLANT LOCATICH3 6 MI HHW OF ROCK HILL. SC gyggy gyg.4538

.I IE REGIONS 2

CORPORATE PHONE N0s AE DUKE POWER 6555:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER HRC L*PM K. JABBOUR REACTOR TYPE:

PWR IE PROJECT IHSPECTOR:

CER (MWEls 1145 IE RESIDENT INSPECTOR:

K. VAN DOORN IN5PECTIOM STATU5:

FUEL L0AD DATE CHAHGES TIME PERIOD AS REP 0RTED BY UTILITY 8 Jan. 1982 - Mar. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE iSEKDUlf REPORTED BY UTILITY NUMBER OF THSP.

OF INSP.

09-27-74 08-00 CONSTRUCTIDH DELAYS DUE TO CRITICAL 8201 02-23-82 02-26-82 CONDITIONS EXISTING IN THE FINANCIAL 8202 W1-05-82 01-08-82 MARKETS.

8203 12-26-81 01-25-82 05-00-77 08-00-82 REVISED LOAD FORECASTS.

8205 02-23-82 02-26-82 03-05-80 10-00-84 HD REASON GIVEH.

8206 01-26-82 02-25-82 08-00-80 02-08-85 MAJOR UNIT RESCHEDULE Inspection reports are available at local PDRs.

i i

l l

LOCAL PURLIC DOCUMEHT R O O M:

YORK COUNTY LIBRARY 325 $0UTH DAKLAND AVENUE ROCK HILL. SOUTH CAROLINA 29730 I

4 1

C0N$TRUCTION

$TATUS REP 0RT PAGE NO: 2-021 COTAW3A 2,,

NUCLEAR P O 14 E R PLANT $

STATUS AS OF W t*8f**

2-1/-f2 C0N5TRUCTION

$TATUSi le. ee f G.

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

"3-? ?

  • F APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LDADI;tG DATE:

02-00-85 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

12-00-79 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: M-99 4 -es -F 7 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: ggo COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

gm STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.

6 N U%D METAJ W7Ed #@ #

f

~f' h

f fh d!.

b

$f, o;

g CC"FLCTCO OY T": LAST T "AY.

UC U!LL PROVISE TME 255'J'_!S OF Tug _

+P0 A T CO !"F0""i!!SM IM "5 $ 500"9

?* T 5". L"9^ Y E.

ESTIMATED ACTUAL ESTIMATED' ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

05-16-74 05-86-74 10-01-76 04-01-76 1002 PLACE STRUCTURAL CONCRETE:

08-01-76 08-01-76

.94Y97 INSTALL REACTOR PRES $URE VESSEL:

01-05-80 01-18-80 04-15-80 04-15-80 100%

INSTALL LARGE BORE PROCESS PIPE:

01-05-77 01-05-77 f,3-fs

-54444 INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SNUBBERS:

07-01-81

(,-10 -[r(*

M 2.

INSTALL SMALL SORE PIPE:

N/A N/A N/A N/A N/A INSTALL CABLE TRAY:

N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT.

N/A N/A N/A N/A N/A INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

11-01-79 11-01-79 ti-i f, g3 g3 (,

~

INSTALL ELECTRICAL TERMINATIONS:

11-15-79 11-19-79 lL eg.g g 1K 2-F

'I CONDUCT REACTOR COLD HYDROSTATIC TEST:

eg,00-%

o f M CONDUCT HOT FUNCTIONAL TEST:

og f L et. - 0 o 16 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

fo,ca,py 0%

9 9

9 l

C00STRUCTIOO 5TATUS REPQRT PAGE NO: 2-023 CNEROREE 1 NUCLEAR POWER PLANTS STATUS AS OF:

13=44-82~ -

3-31,Lt C0NSTRUCTION

$TATU$3 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-00-89 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-83 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION CCMPLETE: 18%

CCMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION STOPPED.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETIQH % COMPLETE MOBILIZE AND PREPARE SITE:

07-09-76 03-01-78 100%

PLACE STRUCTURAL CONCRETE:

83-01-78 48%

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND $NUBBERS:

INSTALL SMALL BORE PIPE:

05-30-7/f 12 INSTALL CABLE TRAY:

INSTALL EXPOSED METAL CONDUIT:

INSTALL POWER, CCHTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

CCNDUCT REACTOR COLD HYDROSTATIC TEST:

CONDUCT NOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS NECESS ARY FOR FUEL LOAD:

e o

C00STQCCTIOO

$TATUS QEPORT PAGE Mes 2-022, CHEROKEE 1 NUCLEAR POWER PLANT $

STATUS AS OF8 JukdrF1bi*

i I -At

.FJ PLANT CHARACTERI5TICSt KEY PERSONNELa I

DOCKET N3:

85890498 CORPORATE CONTACT:

W. M. 0 WEN, SR. VICE PRESIDENT I

C7 NO. & DATE ISSUED: CPPR-167/ 12-38-77 DESIGN ENGINEERING DEPARTMENT CF EXPIRATION DATE:

CORPORATE ADDRESS:

POWER BUILDING /422 SOUTH CHURCH ST.

I APPLICANT:

DUEE POWER CHARLOTTE, NORTM CAROLINA 28281 PLANT LOCATION:

21 MI E OF SPARTANBURG, SC IE REGIDH 2

CORPORATE PHONE NO:

(7043 373-4120 AE DUKE POWER I

NS$$a COMBUSTIDM ENGINEERING 1

CONSTRUCTCRt DUKE POWER NRC LPM:

UNASSIGNED l

REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

1 DER (MWE32 1289 IE RESIDENT INSPECTOR:

I IN5PECT ION 5 T A T U $*

FUEL L0AD DATE CNANGES 1

1 TIME PERIOD A5 REP 0RTED BY UTILITY 1

Jan. 1982 - Mar. 1982 REPORT MEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCNEDULE REPORTED BY UTILITY NUMB ((

OF INSP.

OF INSP.

l NOME f:-05-80 87-00-89 NO REASON GIVEN.

l 09-38-81 N/S CONSTRUCTION STOPPED.

I I

Inspection reports are available at local PDRs.

4 2f.f3 dMcELLE d I

i 1

I I

I L0 CAL FURLIC D0CUMENT R00Mr CHER0REE COUNTY LIBRAR[

388 E. RUTLEDGE AVENUE CAFFMEY, SOUTH CAROLINA 29348 i

.1' i