Forwards Updated Const Status Rept as of 830331,for Inclusion in NUREG-0030.Current Project Schedule Indicates Fuel Load of Jan 1984.Commercial Operation Projected for Aug 1984
ML20115A636
Person / Time
Site: 05000000, Clinton
Issue date: 04/18/1983
From: Hall D
ILLINOIS POWER CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 0982-L, 982-L, NUDOCS 8504150457
Download: ML20115A636 (6)


Text

_

)

l a

w D N 6 ) (A..

ILLINDIS POWER COMPANY CLINTON POWER STATION, P.O. BOX 678 CLINTON. ILLINOl$ 61727 0982-L April 18, 1983 Docket 50-461 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Construction Status Report (NUREG-0030)

Reference:

USNRC Letter 10/30/81, R. A. Hartfield to L. J. Koch, Illinois Power Company

Dear Mr. Hartfield:

The referenced letter requested the Company to provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station.

Enclosed please find a marked up copy of the June 30, 1982 report indicating status as of March 31, 1983.

Please note that we have not received copies of revised coastruction status reports for the periods ending September 30 and December 31, 1982.

The current project schedule indicates fuel load of January,1984 and commercial operation projected for August, 1984.

Construction of Clinton Unit No. 1 is continuing at a reduced pace as a result of stop work orders issued during the first half of 1982 and restraints on the release of new work caused by an inspection backlog.

The Company has presented plans to the staff of the Nuclear Regulatory Commission to resolve the problems associated with the stop work orders.

Work is being partially resumed, with NRC approval, in each of the areas affected by the orders.

The Company is in the process of evaluating the construction schedule and determining the extent of delay.

This process will be completed by the end of May, 1983.

The revised 8504150457 840606 PDR FOIA KILLEFEB4-367 PDR L

7 Mr. R. HOrtfield April 18, 1983 schedule information will be submitted with the June 30, 1983 status report.

t Si erel

yours,

. Hall, Vice President w/ enclosure RPR/jm cc:

Mr. H. H. Livermore, NRC Resident Inspector (w/ enclosure)

L l

l l

L

C0N5TkUCTI0N 5TATUS REPORT PAGE NO: 2-028 03-31-83 CLIOTON 1 NUCLEAR POWER PLANT 5 STATUS A5 0Fs at"7t*32 PLANT C M A R A C T E R I 5 T I C 5:

KEY PERS0NNEL DOCKET NO:

05000461 CORPORATE CONTACT 2 W. C. GERSTNER, EXEC VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-137/ 02-24-76 CP EyPIRATION DATE8 CORPORATE ADDRESS:

500 SOUTH 27TM" STREET APPLICANT:

ILLINCIS POWER DECATUR. ILLINOIS 62525 PLANT LOCATIDH2

& MI E OF CLIHTON. ILL IE REGION 3

CORPORATE PHONE N0:

(217) 937-1111 EXT. 2811 AE:

SARGENT 8 LUNDY NSS5*

GENERAL ELECTRIC CONSTRUCTOR

  • BALDWIN ASSOCIATES NRC LPM:

H. WittiAMS Abelfort CEACTOR TYPE:

BWR IE PROJECT INSPECTOR:

H. M. WESCOTT EER (MWE):

0950 IE RESIDENT INSPECTOR:

H. L IVERf10R E IHSPECTION 5 T A T U St FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REP 0RTED 8Y UTILITV8 Lpr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEnutE REPORTED BY UTILITY

!!E1J1R 0F INSP.

OF TMSP.

05-09-77 04-00-88 REEVALUATION OF CONSTRUCTION SCHEDULE.

8115 06-02-88 02-05-82 06-23-78 04-00-82 TIME LOST DUE TO SEVERE WEATHER 8204 02-16-82 03-31-82 CONDITIONS.

8206 04-28-82 04-30-82 01-21-88 01-00-83 REEVALUATION OF CONSTRUCTION SCHEDULE.

4207 05-87-82 05-20-82 n4-29-82 0'-03-84 RFEVALUATION OF CONSTRUCTION SCHELULE.

8209 06-09-82 06-10-82 Inspection Reports are available at local PDRs.

Staba.to be provided by.the NRC L0 CAL PUBLIC D0CUMENT R00M

~

VESPASIAN WARNER POOLIC LIBRARY 120 WEST JOHNSON 51REET CLINTON. ILLIHOIS 61727

, s.

4 I

.WL M r c

~

)

C0NSTRLCTION STATUS REPORT PAGE NO: 2-029 CL!taTOM I NUCLEAR P O 63 E R PLANTS STATUS AS OF C0N5TRUCTIOM STATUSt APPLICAHf'S CURRENT ESTIMATED FUCL LOADING DATE:

01-03-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS AFPLICANT'S PREVIOUS ESTIMATED FUEL L0t. DING DATE:

01-03-83 DEFINED IN CP: fEARLIEST) 10-01-80 APPLICAt!T'S ESTIt'ATED FUEL LOADII:G DATE AT CP ISSUANCE:

IG-00-80 (LATEST) 10-01-53 84 APPLICAIIT'S CURRElli ESTIMATED CorittERCI AL CPERATIDH DATE: 08-31-54 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: Mx 87.8%

COINENis REGARD HG CURRE!IT CONSTRUCTIDH STATUS:

The ptoject estbnate and schedute are cuuent.ty being evaluated.

The estinI.ted completion dates and percent complete data listed below uittt be affected.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1A R.

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PKEPARE SITE:

10-06-15 03-86-76 100 PLACE STRUCIURAL CONCRETE:

02-25-76 01-00-83 1SSx 99.91 INSTALL REACTOR PRESSURE VESSEL:

10-06-79 10-15-79 100x ItiSTALL LARGE BORE PROCESS PIPE:

05-08-76 07-15-83 1sx 99.0%

INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SHUBBERS:

05-01-76 08-15-83 48x 9f.9%

INSTALL SMALL 3CRE PIPE:

06-01-77 09-01-83 J3%' 99.91 It: STALL CABLE TRAY:

06-01-78 02-18-83 4sz 95.2%

INSTALL EXPOSED FIETAL CONDUIT 06-01-78 02 29-83 ssx 86.5% ~

INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:

12-12-79 10-03-83 14x 58.01 IHSTALL ELECTRICAL TERM!t!ATIONS:

04-01-80 11-01-83 1sx 57.01 l

CONDUCT REACTOR COLD HYC20STATTC TEST 02-23-83 04-03-83 0x Cot: DUCT HOT FUNCTI0llAL TEST N/A N/A N/A N/A N/A CONDUCT PRECP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

03-06-81 11-28-83 4x 4.5%

r

~,F:.~? WT Ct:

Of I

~

.ar

~,

s a C !1 i.

A c ':....

s:

.a

,L

'i

~-

[

C00$TRUCTIOO 57ATUS REPORT PA E NO: 2-030 r

~

CLI! TON 2 MUCLEAR PONER PLANTS STATUS AS OF 0-2 PLANT C H A R A C T E R I $ T I C 58 KEY PERS0NNEL8 DOCKET NO:

65000462 CORPORATE CONTACT:

W. C. GER$THER, EXEC VICE PRESIDENT CP No. & DATE ISSUED: CPPR-138/ O2-24-76 CP EXP! RATION DATE:

CORPORATE ADDRES$8 500 50'JTH 277H STREET APPLICANT:

ILLINOIS POWER DECATUR, ILLIN0!$ 62525 PLANT LOCATION:

6 MI E OF CLINTON, ILL IE REGION:

3

. CORPORATE PHONE N0*

(217) 937-1191, EXT. 2811 AEs SARGENT & LUNDY NS$$:

GENERAL ELECTRIC CONSTRUCTOR:

BALDWIN ASSOCIATES NRC LPM:

H. +H t E F4M9-Abtl40n REACTCR TYPEt BLR IE PROJECT INSPECTOR:

H. M. WESCOTT DER (MWE)*

0950 IE RESIDENT INSPECTOR:

H. LIVERr10RE 4

IN5PECTION $TATUSt FUEL L0AD DATE CHANGES IIME PERIOD AS REP 0RTED BY UTILITYa Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE f

REPORT BEG DATE END DATE DATE

,5GHEDRLE REPORTED BY UTILITY hvMBER CF INSP.

OF INSP.

03-24-77 10-00-47 FINANCIAL CONSIDERATIONS AND UNCERTAINTY DVER FEDERAL NUCLEAR GENERATION AND FUEL 20 bt. Pt0VIdtd by titt. NRC.

POLICIES.

11-20-81 N/S REDUCED LOAD GROWTH RATE.

j I

J f

1 i

i N

j j

L0 CAL PUBt IC D0CUMENT R 0 0 Mt VESPASIAN WARMER PUBLIC LIBRARY 4

120 WEST JOHMSON STREET j

CLINTON, ILLINOIS 61727 i

j i

w

a-

'. ~

C0N3TRUCTI0N 5YATUS REPORT

. PAGE ND 2 3,1 CLINTON 2 NUCLEAR POWER PLANT 5

'5TATUS A5 0F8 04-50-&&

C0N5TRUCTION 5TATU5:

APPLICANT'S CURRENT ESTIMATED FUEL LDADING D' ATE:

N/5 A?PLICANT5 CONSTRUCTION COMPLETION FSTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-08-87 DEFINED IN CPt (EARLIEST) 10-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-08-83 (LATEST) 10-01-85 APPLICANT'S CURRENT. ESTIMATED CDMMFRCIAL OPERATION DATE8 N/5

+

CURRENT ESTIMATED PERCENT CONSTRUCTION CDMPLETE:

1%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 CONSTRUCTION DEFERRED INDEFINITELY.

ESTIMATED ACTUAL ESTIMATED ACTUAL -

ESTIMATED 5 TART

$1AR1 COMPLETION ggDP_L(TJg U O.RFy MOBILIZE AND PREPARE SITE:

10-06-75 03-56-76 100%

PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRES 5URE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SNUBBER $*

INSTALL SMALL BORE PIPE:

INSTALL CABLE 1 RAY INSTALL EXPOSED METAL, CONDUIT INSTALL POWER, CONTROL. INSTRUMENTATION AND SECURITY CABLEt INSTALL ELECTRICAL TERMINATI0H58 CONDUCT REACTOR COLD NYDR0 STATIC TEST

  • I CONDUCT NOT FUNCTIONAL TEST
  • 1 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

1 Y