Forwards Updated Const Status Rept as of 830331 for Inclusion in Yellow Book.Total Plant Const 65.45% Complete Through Mar 1983
ML20115A620
Person / Time
Site: 05000000, Nine Mile Point
Issue date: 05/13/1983
From: Manno S
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 (6627), NUDOCS 8504150449
Download: ML20115A620 (3)


Text

M Y NIAGARA R UMOHAWK NIAGARA MOHAWK #0WER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 May 13, 1983 (6627)

Chief, Management Information Branch Office of Management & Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Subject:

, NRC YELLOW BOOK SCHEDULE AS OF MARCH 31, 1983 NINE MILE POINT NUCLEAR STATION - UNIT 2 Transmitted herewith is our current submittal indicating the status of the Nine Mile 2 project for all activities as they appear in the new format for the NRC Yellow Book.

The completion percentages are derived from project reports that are current as of March 31, 1983.

Total plant construction is 65.45 percent complete through March 1983.

Very truly yours,

. F. Manno

  • / ice President Nuclear Construction SFM/AR:ja Attachment xc: D. Shelton (SWEC) (w/ attachment)

C. V. Mangan (w/ attachment) 8504150449 840606 PDR FOIA KILLEFE84-367 PDR

.NINE MILE POINT CONSTRUCTION STATUS REPORT PAGE 1 0F 2.

NUCLEAR STATION - UNIT 2 NUCLEAR POWER PLANTS STATUS AS OF: '3/3}/83 PLANT CHARACTERISTICS: KEY PERS0PMEL:

DOCKET ND:

05000410 CORPORATE CONTACT:

.S. F.. MANNO, VICE PRESIDENT -

CP N0. & DATE ISSUED:

CPR-112 / 6/24/74 NUCLEAR CONSTRUCTION CP EXPIRATION DATE:

7/31/78 REVISED TO 12/31/87 CORPORATE ADDRESS:

300 ERIE BOULEVARD WEST APPLICANT:

NIAGARA M0 HAWK POWER CORP (RATION SYRACUSE, NEW YORK 13202 PLANT LOCATION:

8 MI NE OF OSWEGO, NY IE REGION:

1 CORPORATE PHONE NO:

(315) 474-1511 EC:

STONE & WEBSTER NRC LPM:

M. Haughey NSSS:

GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

STONE & WEBSTER

-CONSTRUCTION:

R. Schultz REACTOR TYPE:

BWR

-TEST AND STARTUP:

DER (M E):

1080 IE RESIDENT INSPECTOR:

INSPECTION STATUS:

FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:

TIE PERIOD REPORT-NEW REASON FOR CHANGE DATE SCHEDULE REPORTED BY UTILITY REP (RT BEG DATE END DATE NUMBER OF INSP.

OF INSP.

3/14 / 78 3/31/83 1.

DESIGN CHANGES TO MITIGATE CONTAINMENT DYNAMIC LOADS.

2.

DESIGN CHANGES TO IMPLEMENT SEPARATION REQUIREMENTS OF REG. GUIDE 1.75.

t j

12/14/78 3/31/84 1.

WORK STOPPAGES AND SHUTDOWN OF i

J08.

j 2.

DELAYS IN PROCUREMENT OF EQUIPMENT.

l 3.

REESTIMATE OF SCHEDULE POWER REQMTS.

4.

HEARING DELAYS 7/28/80 2/24/86 1.

POWER GENERATION CONTROL '

COMPLEX (PGCC) i LOCAL PUBLIC DOCLMENT ROOM:

2.

GE0 LOGICAL IMPACTS 3.

MARK II CONTAINMENT STATE UNIVERSITY COLLEGE AT OSWEGO 4.

BIOLOGICAL SHIELD WALL PEWIELD LIBRARY 5.

THREE MILE ISLAND IMPACTS i

OSWEGO, NEW YORK 13126 6.

NEW YORK STATE PUBLIC SERVICE COPHISSION

NINE MILE POINT CONSTRUCTION STATUS REPORT -

PAGE 2 0F 2 NUCLEAR STATION - UNIT 2 NUCLEAR POWER PLANTS STATUS AS OF: 3/31/83-FUEL LOAD DATES CURRENT ESTIMATE FUEL LOAD DATE:

3/00/86 ESTIMATED CONSTRUCTION PERCENT COMPLETE:

65.45 %

PREVIOUS ESTIMATE FUEL LOAD DATE: 4/00/86 ESTIMATE FUEL LOAD DATE AT CONSTRUCTION PERMIT ISSUANCE: 5/1/78 CURRENT ESTIMATED COMMERCIAL COMMENTS ON CURRENT CONSTRUCTION STATUS:

OPERATION DATE:

10/1/86 CONSTRUCTION COMPLETION ESTIMATE I

AS DEFINED IN CONSTRUCTION PERMIT:

  • ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED MILESTONE DATES START START COMPLETE COMPLETE PERCENT COMPLETE 1.

MOBILIZE & RIEPARE SITE:

8/25/75 8/25/75 8/1/76 8/1/76 100 %

2.

PLACE STRUCTURAL CONCRETE:

5 / 9/ 77 5/9/77 8/19/85 92 %

3.

INSTALL REACTOR PRESSURE VESSEL:

8/13/79 8/13/79 8/8/80 8/8/80 100 %

4.

INSTALL LARGE BORE PROCESS PIPE:

6/7/76 6/7/76 12/3/84 64 %

5.

INSTALL L.B. PIPE HANGERS, RSTR's & SNUB 8ERS:

9/5/77 9/5/77 12/3/84 42 %

6.

INSTALL SMALL B31E PIPE:

4/1/82 5/1/82 3/11/85 19 %

7.

INSTALL CABLE TRAY:

11/6/78 11/6/78 7/9/84 61 %

8.

INSTALL EXPOSED METAL CONDUIT:

9/12/77 9/12/77 8/12/85 65 %

9.

INSTALL PWR., CONTROL, INSTRU. & SEC. CABLE:

1/4/82 3/1/82 10/7/85 13 %

10.

INSTALL ELECTRICAL TERMINATIONS:

4/1/82 1/12/83 12/30/85 0.5%

11. CONDUCT REACTOR COLD HYDROSTATIC TEST:

4/29/85 5/20/85

12. CONDUCT HDT FUNCTIONAL TEST:

3 / 24 / 86 9/15/86

13. CONDUCT PRE 0P & ACCEPT TESTS NECESS. F/ FUEL LOAD:

11/14/83 2/24/86

  • Early Start Date

.