Forwards Updated Const Status Rept as of 831231.Info for Inclusion in Yellow Book.Const 80% Completed
ML20127D419
Person / Time
Site: 05000000, Nine Mile Point
Issue date: 02/15/1984
From: Rhode G
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 8058, NUDOCS 8504150240
Download: ML20127D419 (3)


Text

sdI g

NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE souLEVAmo wtST SymACUSE,N Y 13202 GERALD K. RHODE

$ENIOR VICE PRESIDENT February 15, 1984 (8058) i Chief, Management Information Branch

' Office of Management & Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

Subject:

NRC YELLOW BOOK SCHEDULE AS OF DECEMBER 31, 1983 NINE MILE POINT NUCLEAR STATION - UNIT 2

- Transmitted herewith is our current submittal. indicating the status of the Nine Mile 2 project for all activities as they appear in the new formac for the NRC Yellow Book.

The completion percentages are derived from project reports that are current as of December 31, 1983.

Total plant construction is 80.00 percent complete through December 1983.

Very truly yours, S

W G. K. Rhode Senior Vice President.

GKR/TRL:ja Attachment.

xc:. D. Shelton (SWEC) (w/ attachment)

C. V. Mangan (w/ attachment)-

8504150240 840606 PDR FOIA

. KILLEFEB4-367_.PDR

^

x 2-

+,,, - +, - - - -.

w

NINE MILE POINT CONSTRUCTION STATUS REPORT PAGE 1 of 2 NUCLEAR STATION - UNIT 2 NUCLEAR POWER PLANTS STATUS AS OF: 12/31/83 PLANT CHARACTERISTICS:

KEY PERSONNEL:

J DOCKET N0:

05000410 CORPORATE CONTACT:

G. K. RHODE, SENIOR VICE PRESIDENT CP N0. & DATE ISSUED:

CPPR-112 / 6/24/74 CP EXPIRATION DATE:

7/31/78 REVISED TO 12/31/78 CORPORATE ADDRESS:

300 ERIE BOULEVARD WEST APPLICANT:

NIAGARA M0 HAWK POWER CORPORATION SYRACUSE, NEW YORK 13202 PLANT LOCATION:

8 MI NE OF OSWEG0, NY IE REGION:

1 CORPORATE PHONE NO:

(315) 474-1511 EC:

STONE & WEBSTER NRC LPM:

M. Haughey NSSS:

GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

STONE & WEBSTER

-CONSTRUCTION:

R. Gramm REACTOR TYPE:

BWR

-TEST AND STARTUP:

DER (MWE):

1080 IE RESIDENT INSPECTOR:

INSPECTION STATUS:

FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:

TIME-PERIOD REPORT NEW REASON FOR CHANGE DATE SCHEDULE REPORTED BY UTILITY REPORT BEG DATE END DATE NUM8ER OF INSP.

OF INSP.

3/14/78 3/31/83

1. DESIGN CHANGES TO MITIGATE CONTAINMENT DYNAMIC LOADS.
2. DESIGN CHANGES TO IMPLEMENT SEPARATION REQUIREMENTS OF REG. GUIDE 1.75.

12/14/78 3/31/84

1. WORK STOPPAGES AND SHUTDOWN OF J08.
2. DELAYS IN PROCUREMENT OF EQUIPMENT.
3. REESTIMATE OF SCHEDULE POWER REQMTS.
4. HEARING DELAYS 7/28/80 2/24/86
1. POWER GENERATION CONTROL COMPLEX (PGCC)

LOCAL PUBLIC DOCUMENT ROOM:

2. GE0 LOGICAL IMPACTS
3. MARK II CONTAINMENT STATE UNIVERSITY COLLEGE AT OSWEGO
4. BIOLOGICAL SHIELD WALL PENFIELD LIBRARY
5. THREE MILE ISLAND IMPACTS

,0SWEGO, NEW YORK 13126

6. NEW YORK STATE PUBLIC SERVICE COMMISSION

NINE MILE POINT CONSTRUCTION STATUS REPORT PAGE 2 of 2

. NUCLEAR STATION - UNIT 2 NUCLEAR POWER PLANTS STATUS AS OF: 12/31/83 FUEL LOAD DATES CURRENT ESTIMATE FUEL LOAD DATE:

3/ 00/ 86 ESTIMATED CONSTRUCTION PERCENT-COMPLETE:

80.00%-

PREVIOUS ESTIMATE FUEL LOAD DATE: 4/00/86 ESTIMATE FUEL LOAD DATE AT CONSTRUCTION PERMIT ISSUANCE:

5/1/78 CURRENT ESTIMATED COMMERCIAL COMMENTS ON CURRENT CONSTRUCTION STATUS:

OPERATION DATE:

10/1/86 CONSTRUCTION COMPLETION ESTIMATE AS DEFINED IN CONSTRUCTION PERMIT:

MILESTONE DATES

  • ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START-COMPLETE-COMPLETE PERCENT COMPLETE 1.

MOBILIZE & PREPARE SITE:

8/25/75 8/25/75 8/1/76 8/1/76 100%

2.

PLACE STRUCTURAL CONCRETE:

5/9/77 5/9/77 8/19/85 99%

3.

INSTALL REACTOR PRESSURE VESSEL:

8/13/79 8/13/79 8/8/80 8/8/80 100%

4.

INSTALL LARGE BORE PROCESS PIPE:

6/7/76 6/7/76 12/3/84 87%

5.

INSTALL L.B.' PIPE HANGERS, RSTR's & SNUBBERS:

9/5/77 9/5/77 12/3/84 66%

6.

INSTALL SMALL BORE PIPE:

4/1/82 5/1/82 3/11/85 43%

7.

INSTALL CABLE TRAY:

11/6/78 11/6/78 7/9/84 88%

8.

INSTALL EXPOSED METAL CONDUIT:

9/12/77 9/12/77 8/12/85 63%

9.

INSTALL PWR., CONTROL, INSTRU. & SEC. CABLE:

1/4/82 3/1/82 10/7/85 32%

10.

INSTALL ELECTRICAL TERMINATIONS:

4/1/82 1/12/83 12/30/85 12%

11.

CONDUCT REACTOR COLD HYDR 0 STATIC TEST:

4/29/85 5/20/85 12.

CONDUCT H0T FUNCTIONAL TEST:

3/24/ 86.

9/15/86 13.

CONDUCT PRE 0P & ACCEPT TESTS NECESS. F/ FUEL LOAD:

11/14/83 2/24/86

  • Early Start Date

~

J EL4Uu j Iy t1

'g

,= -

CORSum8f5

/

\\

power

/

Site Manager h

C0mpany

=a ~~

Mdand Project: PO Box 1963, Midland. Mi 48640. (517) 631-8650 January 12, 1984 Mr R A Hartfield Chief, Management Information Branch Office of Management and Program Analysis U S Nuclear Regulatory Commission Washington, DC 20555 MIDLAND ENERGY CENTER GWO 7020 NRC SCHEDULE File: 0652 UFI:

53*54 Serial:

CSC-7161 In our last Construction Status Report update (Ref. letter dated October 14, 1983) we stated that a new schedule for completing the project under the Con-struction Completion Plan would not be finalized until some experience had been gained working under this new plan.

Since that time, there has not been adequate work experience to enable the development of a definitive project schedule. Consequently, we are-again requesting your approval to postpone the yellowbook update.

Ple e ad ise us of any questions or concerns you may have.

f&

.: _M cc Mr. James G. Keppler, Regional Director, Region III Mr. J. J. Harrison, Midland Project Inspector, Region III Mr. Frederick C. Williams, Isham; Lincoln and Beale, Washington Mr. Phil Steptoe, Isham, Lincoln and Beale, Chicago PdOGIA4LA b

I

~iwin al I

1 l

I l

m d

~

C0N$TRUCTION 5iA TU$

R E.P 0 R T PACE NO: 2-053'

' LASALLE 2

' NUCLEAR P0WER P.L A N T S STATUS AS OF: 12-31-83

~*

P, L A-N-T C H A R A C T E R I 5 T I C S:

KEY' P E R.5 0 N N E La 05000374 CORPORATE CONTACT:

C. REED, VICE PRE 3IDENT DOCKET NO:

. CPPR-100/ 09-10-73 CP NO. 4 DATE ISSUED:

CP EXPIRATIDH DATE:

12-31-80 CORPORATE ADDRESS:

P. O. BOX 767 APPLICANT -

COMf10NWEAL TN EDISON CNICAGO. ILLIMDIS 60690 PLANT LOCATION:

11 MI SE OF OTTAWA. ILL l

IE REGION:

3 CORPORATE PHONE NO:

(312)'29h-3121 AE '

SARGENT 8 LUNDY NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

COM?iONWEALTH EDISON NRC LPM:

A.

BOURNIA l

REACTOR TYPE:

BWR IE PROJECT INSPECTOR -

N. 11ESCCTT t-DER (MWE):

1078 IE RESIDENT INSPECTOR:

R. 13ALKE?

L INSP ECTION 5 T A T U 5:

FUEL L0AD D A T'E CHANGES TIME PERIOD A S REP 0RTED BY UT IL I T Y:

Oct., 1983 - Dec., 1983

~ REPORT NEu REASON FOR'CHiNGE-REPORT BEG DATE END DATE DATF 3C11F Dt11_(

p_[P_0,R_L(D RY tiftti Y NUMRER Of_Jp S P.

OF INSP.

i 10-01-77 LICENSING DELAYS /PUDLIC NEARINGS.

Not Available 10-85-73 01-On-79 ruoLIC HEARINGS.

10-87-74 06-01-79 ECO:;0:lIC RZAS0!iS.

04-20-77 0 3-c 0-30. REASSESS;15';T Or CD':ST PUCTION SCHEOULE SIAIUS.

I' Inspection Reports are available al local PDRs.

09-24-79 06-00-31 CESIGN DELAYS t.ND CONS 190CT!P!4 PEl.*YS l

CAUSED BY CC.TLE':11Y OF II:CLLuis;G 1 *: R II !

N CO*li Alt:T:EtiT lit tmDiff t.::IC L G t31.

1 05-lh-80 12-00-81 TO INCORPORATE TMI RELATED CHANGES INTO DESIGN AND CONSTRUCTION, AND REFLECT CONTINUING NRC LICENSING l

SLOWDOWN.

I 1-14-81 05-00-82 CONTAINMENT. LOADING MODIFICATIONS.

09-30-81 12-00-82 FOCUS ON UNIT 1 ALTERATIONS WHICH REFLECT ON UNIT 2 INSTALLATION.

l 03-31-82 04-30-83 FOCUS.ON UNIT 1 ALTERATIONS WHICH i

REFLECT ON UNIT 2 INSTALLATION.

03-31-83 08-31-83. STRUCTURAL STEEL MODIFICATIONS.

~

06-31-83 10-01-83 CLEARANCE OF NON-ANTICIPATED DEFI-L O'C A'L~

PUBLIC'D0CUMENT

.R 0 0 M:

CIENCIES COMBINED WITH DIFFICULTIES i

LL C0ftMUNITY COLLEGE' IN SCHEDULING PRE-OP TESTS.

l g'ytl0 OGLESBY. ILLINDIS. 16348-09-30-83 11-18-83:SAME AS THE PREVIOUS REASON.

12-31-83 12-30-83 ACTUAL FUEL LOAD START.

l

'C 0 N 5 T R U C T I 0 N 5TATUS R E P Q R T' PAGE NO '2-059

< LASALLE 2' NUCLEAR P 0 L3 E R P-L A N T S STATUS AS OF: 12-31-63 C0N$TRUCT2DN S'T A T U St APPLICANT'S' CURRENT. CST!t1ATED FUEL LOADING DATE: 1 W M Arrt! CANTS C'ONSTRUCT! cts COMPLETI0ti ESTIMAT'E AS-s' APPLICANT'S PREVIOUS ESTIMATED FUEL LDADING DATE:

11-18-83 DEFINED IN CP:

APPLICANT'S CURRENT. ESTIt1ATED C0 tit 1ERCI AL OPERATION DATE: 08-01-75 (EARLIEST)

I APPLICANT'S ESTIt1ATED FUEL LOADING DATE AT.CP ISSUANCE:

t L.u ES T )

12-31-83.

' l ',

04-30-84 l

i CURRENT ESTit*ATED PERCr**T' CONSTRUCTION COMPLETE: 100f,

i't CCMME!ITS REGARD!rlG' CURRENT CONSTRUCTION' ST ATU.',8 I

i.

.I ESTIMATED ACTUAL ES T itt a T E D ACTUAL ESilt:ATED START

$1A RL Mi$ rileN f0!_L t F ( T 0ff. *;_por:r tJ i g i MOBILIZE Ar4D PREPARE SITE:

10-00-73 0/-00-74 ist; I

PLACE STRUCTURAL CONCRETE:

I 07-00-74 09-00-76

' I t 0 *:

I

. INSTALL. REACTOR PRESSURE VESSEL -

l 11-0C-76 11-00-76 10c:

[

INSTALL LARGE BORE PROCESS PIPE:

11-00-76 03-00-30 100*:

'l

!MST ALL LAROE BOT!E PIPE HANGERS, RESTRAINTS AND SHUBBERS:

01-00-77 06-00-83 100%

1

. INSTALL SM%LL SORE PIPE:

18-00-76 06-00-82.

IC3%

I INSTALL CABLE TRAY:

09-40-77 04-00-82 100%

ItiSTALL EXPOSED METAL' CONDUIT:'

01-00-77 06-00-83 100%

- !NST AL L rC' ER. C0flTROL. INSTRUMENTATION AtlD 'SECURI's Y CABLE:

02-00-7a 06-00-83 100%..,

W INSTALL ELECTpICAL TERMINATIDHS:

f 02-00-73 09-00-83 100%-

C0t;CUCT RE4CTOR COLD IfYDROSTATIC TEST:

10-00-82 10-00-82 100%

f' C0t:00CT liCT FutaCTIC!lAL TEST:

03-00-84.

03-00-84 i

CCNDUCT PREOP At:D' ACCEPTANCE TESTS HECESSARY TOR FUEL LOAD:

07-00-82 12-00-83 100%

.i 1

i I

4 A = - Actual 6

I

,,