ML20127C970
Text
s NIAGARA MOHAWK POwtR CORPORATION HlAGARA MOHAWK 300 Emit SOULEVAmo wtST sym4 Cutt.se y s3#0f M
PR pdf August 15, 1983 (7192)
Chief, Management Inf omation Branch Office of Management & Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
Subject:
NRC YELLOW BOOK SCHEDULE AS OF JUNE 30, 1983 NINE MILE POINT NUCLEAR STATION - UNIT 2 Transmitted herewith is our current submittal indicating the status of the Nine Mile 2 project for all activities as they appear in the new format for the M C Yellow Book.
The congletion percentages are derived from project reports that are current as of June 30, 1983.
Total plant construction is 72.53 percent complete through June 30, 1983.
Very t uly yours, A
K.
Senior Vice President SFM/AR:Ja Attachment xc D. Shelton (SWEC) (w/ attachment)
C. V. Mangan (w/ attachment)
)
340606 g41 KILLE
-367 PD"
_)
l MIME MILE POINT COMSTRUCTION STATUS REPORT PAGE 1 of 2 i
NUCLEAR STATIDM - UMIT 2 NUCLEAR POWER PLANTS STATUS AS OFe 6/30/83 -
PLANT CFARACTERISTICS:
KEY PERS0!#fEL:
DOCKET X):
05000410 CORPORATE CONTACT:
S. F. MANNO, VICE PRESIDENT -
CP NO. & DATE ISSUED:
CPPR-112 / 6/24/74 NUCLEAR CONSTRUCTION CP EIPIRATION DATE:
7/31/73 REVISED TO 12/31/78 CORPORATE ADDRESS:
300 ERIE BOULEVARD WEST i
APFLICANT:
NIAGARA MWAWK POWER CSPEATIOM SYRACUSE, NEW YORK 13202 1
PbtXT LOCATIOM:
8 MI NE OF OSMEGO, NY IE REGIOM:
1 CORPORATE PFONE NO:
(315) 474-1511 EC:
STONE & WEBSTER PRC LPM:
M. Haughey l
i MSSS:
GEMERA ELECTRIC IE PRINCIPAL INSPECTOR:
l CONSTR'ITCR:
STONE & WEBSTER
-CONSTRUCTION:
R. Grann REACTCR TYFE:
2WR
-TEST AND STARTUP:
CER (MiE):
1080 IE RESIDENT INSPECTOR:
INSFECTICM STATUS:
FUEL LOAD DATE CHANGES AS REPCRTED BY UTILITY:
TIIE PERICO l
REPORT NEW REASON FOR CHANGE l
DATE SCHEIULE REPCRTED BY UTILITY REPCRT BEG DATE END DATE E M ER OF IMP.
OF INSP.
3/14 /78 3/31/83
- 1. DESIGN CHANGES TO MITIGATE CONTAll#ENT DYNAMIC LOADS.
- 2. DESIGN CHANGES TO IMPLEMENT SEPARATION REQUIREXENTS CF REG. GUIDE 1.75.
12/14/78 3/31/84
- 1. WORK STOPPAGES AND SHUTDOWN OF J08.
- 2. DELAYS IN PROCUREMENT OF EQUIPMENT.
- 3. REESTIMATE OF SCHEDULE POWER RE0MTS.
- 4. HEARING DELAYS l
7/28/80 2/24/86
- 1. POWER GENERATION CONTROL COMPLEX (PGCC)
LOCAL PUELIC 00C17ENT RCDt:
- 2. GEOLOGICAL IMPACTS
- 3. MARK II CONTAINMENT STATE UNITERSITY COLLEGE AT OSWEGO
- 4. BIOLOGICAL SHIELD WALL PEFIELD LI2RARY
- 5. THREE MILE ISLAND IMPACTS l
OSMEGO, MEM YCEK 13125
- 6. NEW YORK STATE PUBLIC SERVICE COMMISSION
BINE NILE POINT CONSTRUCTION STATUS REPORT PAGE 2.of 2 BKLDR STATION - UNIT 2 NUCLEAR POWUt PLANTS STATUS AS OF: 6/30/83 FUEL LOAD DATES OARENT ESTIMTE FIEL LOAD DATE:
3/00/86 ESTIMTED CONSTRUCTION PERCENT CtMPLETE:
72.53%
REVIINS ESTIMTE FUEL LDAD DATE: 4/00/86 ESTIMTE FtEL L0e8 BATE AT CMSTRUCTIM PEMIT ISSUSCE:
5/1/78 GMENT ESTIlutTED CINSERCIA C0fufMTS ON CURRENT CONSTRUCTION STATUS:
OPetATION DATE:
10/1/86 CMSTRUCTION CtNFLETION ESTIMTE l
AS DEFIRED IN CtMSTRUCTION PERMIT:
NILESTEE DATES
- ESTIftLTED ACTUAL ESTIMTED ACTUAL ESTIMATED l
START START CENm.ETE CONPLETE PERCENT CONPLETE
- 1. MOBILIZE & PREPR E SITE:
8/25/75 8/25/75 8/1/N 8/1/76 1005 2.
PLACE STRICitR A CONCRETE:
5/9/77 5/9/77 8/19/85 97%
3.
MSTALL REACTER RESSWE ESSEL:
8/13/79 8/13/79 8/8/80 8/8/80 1(BX 4
4 RSTEL LARGE NRE PROCESS PIPE:
6/7/M 6/7/M 12/3/M 745 5.
ESTALL L.8. PIPE MAMERS, RSTR's & SNUSSERS:
9/5/77 9/5/77 12/3/84 53%
6.
INSTALL SULL MRE PIPE:
4/1/82 5/1/82 3/11/85 27%
l 7.
NSTALL OLSLE TRAY:
11/6/78 11/6/78 7/9/84 68%
8.
INSTALL EIPOSED PETAL GMRffT:
9/12/ 77 9/12/77 8/12/85 71%
9.
WSTALL RR., CONWt., NSTRU. & SEC. CA8tE:
1/4/82 3/I/82 10/7/85 21%
D.
RSTEL ELECTRICE TEmmRTIONS:
4/1/82 1/12/83 12/2/85 35
- 11. CIMOET REACTR CKD WSMSTATIC TEST:
4/29/85 5/20/85
- 12. GIROUCT 2T FUETIORE. TEST:
3/24/86 9/15/86
- 13. CoueuCT PREOP & ACCEPT TESTS NECESS. F/ FUEL LOAD:
11/14/83 2/24/86
- Early Start Date
-.