ML20090B951
ML20090B951 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 02/28/1992 |
From: | WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | |
Shared Package | |
ML20034D291 | List: |
References | |
WCAP-12614, WCAP-12614-R02, WCAP-12614-R2, NUDOCS 9203040155 | |
Download: ML20090B951 (2) | |
Similar Documents at Farley | |
---|---|
Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20199G1991997-11-19019 November 1997
[Table view]Corrected Page 4-12 to WCAP-14723, Farley Nuclear Plant Units 1 & 2 Power Uprate Project NSSS Licensing Rept ML20148M7841997-06-30030 June 1997 Non-proprietary Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for AL Power Farley Nuclear Plant Units 1 & 2, Rev 1 ML20212D2621997-04-30030 April 1997 Rev 1 to WCAP-14689, Farley,Units 1 & 2,Heatup & Cooldown Limit Curves for Normal Operation & PTLR Support Documentation ML20135C9731997-01-31031 January 1997 Non-proprietary Version of WCAP-14723, Farley Nuclear Plant Units 1 & 2 Power Uprate Project NSSS Licensing Rept ML20133G6011997-01-31031 January 1997 Specific Application of Laser Welded Sleeves for Farley Units 1 & 2 Sg ML20133G5901997-01-31031 January 1997 Rev 4 to W Series 44 & 51 SG Generic Sleeving Rept,Laser Welded Sleeves ML20149L9111996-11-0606 November 1996 Nonproprietary Class 3 SG Sleeving Integration Rept for Jm Farley Units 1 & 2 ML20128M5411996-10-0808 October 1996 L* Tube Plugging Criteria for Tubes W/Degradation in Tubesheet Roll Expansion Region of Farley Unit 2 Sg ML20135B8261996-09-30030 September 1996 RCS Flow Verification Using Elbow Taps at Westinghouse 3- Loop Pwrs ML20212D2551996-06-30030 June 1996 Jm Farley,Units 1 & 2,Radiation Analysis & Neutron Dosimetry Evaluation ML20087E8311995-08-31031 August 1995 Elimination of Pressure Sensor Response Time Testing Requirements,Wog Program MUHP-3040 Rev 1 ML20080S5261995-03-31031 March 1995 Evaluation of PTS for Farley Units 1 & 2 ML20080S5121995-02-28028 February 1995 Analysis of Capsule W from Apco Farley Unit 1 Reactor Vessel Radiation Surveillance Program ML20069K2921994-03-31031 March 1994 Nonproprietary Steam Generator Lower Level Tap Relocation Assessment for Jm Farley Nuclear Plant Units 1 & 2 ML20072F3661993-12-31031 December 1993 Elimination of Pressure Sensor Response Time Testing Requirements ML20114B5131992-08-31031 August 1992 Nonproprietary PWR SG Tube Repair Limits:Technical Support Document for Outside Diameter Stress Corrosion Cracking at Tube Support Plates Final Rept ML20114B5011992-08-31031 August 1992 Nonproprietary Response to NRC Questions on Farley SG Tube Alternate Plugging Criteria Presentation Matls ML20101G2901992-03-31031 March 1992 Nonproprietary Preliminary Data on Voltage/Burst/Leakage of 3/4 Inch Diameter Tubing for ODSCC at Tsps ML20094J9681992-02-29029 February 1992 Nonproprietary Jm Farley Units 1 & 2 SG Tube Plugging Criteria for Outer Diameter Stress Corrosion Cracking at Tube Support Plates ML20092M9471992-02-29029 February 1992 Steam Generator Tube Alternate Plugging Criteria Presentation Matls ML20090B9511992-02-28028 February 1992 Nonproprietary Rev 2 to RTD Bypass Elimination for Licensing Rept for Jm Farley Nuclear Plant,Units 1 & 2, Table 2.1-1 (Replacement Page 15) ML20092J1281991-12-31031 December 1991 Nonproprietary WCAP-13139, Steam Generator Tube Support Plate Alternate Plugging Criteria Summary ML20086A0421991-10-31031 October 1991 Nonproprietary Addl Info Supporting SG TSP Criteria for Jm Farley,Units 1 & 2 ML20086A0611991-10-31031 October 1991 Rev 1 to WCAP-12872, Jm Farley Units 1 & 2 SG Tube Plugging Criteria for ODSCC at Tsp ML20082T4381991-09-30030 September 1991 Nonproprietary Addl Info in Support of Eliminating Pressurizer Surge Line Rupture from Structural Design Basis for Jm Farley Plant Units 1 & 2 ML20082S7461991-08-31031 August 1991 Nonproprietary Jm Farley Nuclear Plant Units 1 & 2 Response to NRC Request for Addl Info on Steam Generator Flow Area Reduction Due to Combined LOCA & SSE Loads ML20092L1911991-07-31031 July 1991 Rev 2 to Handbook on Flaw Evaluation for Joseph Farley Units 1 & 2 Steam Generators & Pressurizers ML20079D6071991-05-31031 May 1991 Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Alpr,Farley Nuclear Plant,Units 1 & 2 (for RTD Bypass Loop Elimination) ML20079D6031991-05-31031 May 1991 Westinghouse Revised Thermal Design Procedure Instrument Uncertainity Methodology for Alpr,Farley Nuclear Plant,Units 1 & 2 (for RTD Bypass Loops) ML20073P1261991-05-31031 May 1991 Allowable Outage Time Study for RHR Valves for Farley Nuclear Plant,Units 1 & 2 ML20073J9891991-04-30030 April 1991 Nonproprietary Technical Justification for Eliminating Pressurizer Surge Line Rupture from Structural Design Basis for Farley Units 1 & 2 ML20066J5661991-01-31031 January 1991 Nonproprietary Technical Justification for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Jm Farley Units 1 & 2 Nuclear Power Plants ML20066L3171991-01-31031 January 1991 Nonproprietary WCAP-12856, Structural Evaluation of Farley Units 1 & 2 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20066L0501991-01-31031 January 1991 Nonproprietary Rev 2 to WCAP 12614, RTD Bypass Elimination Licensing Rept for Jm Farley Nuclear Plant Units 1 & 2 ML20066E5091990-12-31031 December 1990 Nonproprietary Steam Generator Tube Plugging Limits Presentation Matls ML20197H6651990-11-30030 November 1990 Nonproprietary WCAP-12764, Steam Generator Tube Collapse Considerations Presentation Matls ML20058E3851990-10-26026 October 1990 Rev 1 to RTD Bypass Elimination Licensing Rept for Jm Farley Nuclear Plant Units 1 & 2 ML20058E3551990-08-31031 August 1990 Rev 0 to Alabama Power Jm Farley Unit 1 Increased Steam Generator Tube Plugging & Reduced Thermal Design Flow Licensing Rept ML20059D4851990-08-16016 August 1990 Steam Generator Sleeving Rept Laser Welded Sleeves Jm Farley Units 1& 2 ML20058E3661990-07-31031 July 1990 Median Signal Selector for Westinghouse 7300 Series Process Instrumentation - Application to Westinghouse Three Loop Plants Employing RTD Bypass Elimination,Alabama Light Co, Jm Farley Unit 1 ML20059D4371990-07-31031 July 1990 Alabama Power Jm Farley Unit 2 Increased Steam Generator Tube Plugging & Reduced Thermal Design Flow Licensing Rept ML20062F9781990-07-31031 July 1990 Rev 1 to WCAP-12213, Handbook on Flaw Evaluation for J Farley Units 1 & 2 Steam Generators & Pressurizers ML20062F9761989-09-30030 September 1989 Nonproprietary WCAP-12447, Background & Technical Basis: Handbook on Flaw Evaluation for Farley Units 1 & 2 Main Coolant Sys & Components ML20247N0321989-07-31031 July 1989 Nonproprietary Jm Farley Unit 2 Engineering Evaluation of Weld Joint Crack in 6-Inch Safety Injection & RHR Piping ML20058N8181988-12-31031 December 1988 Safety Evaluation Supporting More Negative Eol Moderator Temp Coefficient Tech Spec for Jm Farley Nuclear Plant Units 1 & 2 ML20153D7051988-07-31031 July 1988 Joseph Farley Unit 1 & 2 Evaluation for Tube Vibration Induced Fatigue ML20153D6621988-04-30030 April 1988 Background & Technical Basis for Handbook on Flaw Evaluation for Jm Farley Nuclear Plant Units 1 & 2 Reactor Vessel Beltline & Nozzle to Shell Welds ML20210D3041987-04-30030 April 1987 Rev 2 to Tubesheet Region Plugging Criterion for Alabama Power Co Farley Nuclear Station Unit 2 Steam Generators ML20210D2831987-04-30030 April 1987 Rev 1 to Jm Farley Units 1 & 2 Steam Generator Sleeving Rept (Mechanical Sleeves) ML20210T5711986-06-30030 June 1986 Rev 2 to Heatup & Cooldown Limit Curves for Alabama Power Co,Joseph M Farley Unit 1 Reactor Vessel 1997-06-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217P0761999-10-0606 October 1999
[Table view]Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20211B8931999-08-17017 August 1999 Safety Evaluation Supporting Amend 143 to License NPF-2 ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With 05000364/LER-1999-001-05, :on 990621,plant Was Manually Tripped Due to Decreasing Vacuum in Condenser.Caused by Broken Steam Dump Drain Line.Broken Section of Line Was Repaired & Licensee Will Implement Addl Design Change1999-07-0202 July 1999
ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30 |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ - _ - - - - _ - -. - - -. - - -
i i
l l
WCAl'.12614, llevision 2 i
(Westinghouse Non l'roprietary Class 3)
IITD llypass Elimination 1.icensing lleport i
For
'. M. Farley Nuclear Plant Units 1 and 2 i
Table 2.1 1 l
(lleplacement Page No.15) z i
I T
1 9203040155 920228 PDR ADOCK 05000340 P.
~, _. _ _., - _. _.. _, _ - _.... _ -
P 1ABEE 2.1-1 i
RESPONSE TIME PARAMETER, FOR RCS 1[MPERAlVRE liEASUR[ MENT i
RID fast Response J
DJPJLilJntfB lhfDJH eIl_ rid SY$ tem RID Bypass Piping and Thermal Lag (sec) 2.0 N/A R10 Response-Time (sec) 2.0 4.0*
Electronics Delay (sec) 2.0 2.0
.j Total Response Time (sec) 6.0 sec 6.0 sec t
- Note:
In the fast Response lhermowell RTO System, the 4.0 seconds is the I
response time of the RID /thermowell combie,ation.
i b
8' B
15
-