Other: ML20080P120, ML20080P847, ML20090F280, ML20090F307, ML20090H504, ML20092A563, ML20092J397, ML20092N917, ML20093E104, ML20094N334, ML20106A434, ML20140C275, ML20198P461, ML20235J969, ML20263N443, ML20263N446, ML20263N449, ML20263N451, ML20263N454, ML20263N456, ML20263N459, ML20263N462, ML20263N465, ML20263N467, ML20263N471, ML20263N474, ML20263N475, ML20263N479, ML20263N482, ML20263N484, ML20263N487, ML20263N490, ML20263N493, ML20263N495, ML20263N498, ML20263N500, ML20263N503, ML20263N506, ML20263N509, ML20263N511
|
MONTHYEARML20263N4591973-01-14014 January 1973 Auxiliary Building Unit 1 Spent Fuel Pool Sections Reinforcing. Sheet 4 Project stage: Other ML20263N4901974-07-15015 July 1974 Auxiliary Building Unit 1 Spent Fuel Pool Plan and Sections Concrete. Sheet 1 Project stage: Other ML20263N4981974-10-10010 October 1974 Auxiliary Building Unit 2 Spent Fuel Pool Sections Concrete. Sheet 2 Project stage: Other ML20263N4751974-10-11011 October 1974 Auxiliary Building Unit 2 Spent Fuel Pool Sections Reinforcing. Sheet 2 Project stage: Other ML20263N4621974-11-0505 November 1974 Auxiliary Building Unit 1 Spent Fuel Pool - Sections Reinforcing. Sheet 2 Project stage: Other ML20263N4671974-11-0505 November 1974 Auxiliary Building Unit 1 Spent Fuel Pool Plan and Sections Reinforcing. Sheet 1 Project stage: Other ML20263N4741974-11-0505 November 1974 Auxiliary Building Unit 2 Spent Fuel Pool Sections Reinforcing. Sheet 3 Project stage: Other ML20263N4561974-12-13013 December 1974 Auxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Reinforcing. Sheet 4 Project stage: Other ML20263N4711974-12-13013 December 1974 Auxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Reinforcing. Sheet 4 Project stage: Other ML20263N4791975-08-15015 August 1975 Auxiliary Building Unit 2 Spent Fuel Pool Plans and Sections Reinforcing. Sheet 1 Project stage: Other ML20263N4651975-11-18018 November 1975 Auxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Reinforcing. Sheet 5 Project stage: Other ML20263N5031977-01-0505 January 1977 Auxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 4 Project stage: Other ML20263N5091977-08-0707 August 1977 Auxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 2 Project stage: Other ML20263N5001978-01-12012 January 1978 Auxiliary Building Unit 2 Spent Fuel Pool Plan and Sections Concrete. Sheet 1 Project stage: Other ML20263N4431980-11-0404 November 1980 Auxiliary Building Fuel Building - Unit 1 Architectural Plan at El 778 + 10 Project stage: Other ML20235J9691981-08-12012 August 1981 Rev 1 to, Irradiation Study of Boraflex Neutron Shielding Matls Project stage: Other ML20263N5061981-09-14014 September 1981 Auxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Sheet 3 Project stage: Other ML20263N4491982-02-11011 February 1982 Auxiliary Building Fuel Building - Unit 2 Architectural Longitudinal Section Thru Fuel Pool Project stage: Other ML20263N4511982-02-11011 February 1982 Auxiliary Building Fuel Building - Unit 2 Architectural Plan at El 778 + 10 Project stage: Other ML20263N4931982-03-25025 March 1982 Auxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Concrete. Sheet 4 Project stage: Other ML20263N4461982-05-0808 May 1982 Auxiliary Building Fuel Building - Unit 1 Architectural Plan at El 760 + 6 Project stage: Other ML20263N4951982-11-21021 November 1982 Auxiliary Building Spent Fuel Pool - Unit 2 Plan and Sections Concrete. Sheet 3 Project stage: Other ML20263N4841982-11-21021 November 1982 Auxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Concrete. Sheet 3 Project stage: Other ML20263N4821983-03-22022 March 1983 Auxiliary Building Spent Fuel Pool - Unit 1 Plan and Sections Concrete. Sheet 4 Project stage: Other ML20080P1201983-09-29029 September 1983 Ack Receipt of Requesting Info on Util Spent Fuel Mgt Plans.Area Is Ever Changing So Precise Mix of Options Util Will Adopt Is Difficult to Predict.Flexibility Must Exist in Future.Related Correspondence Project stage: Other ML20263N4541983-10-28028 October 1983 Auxiliary Building Fuel Building - Unit 2 Architectural Plan at El 760 + 6 Project stage: Other ML20083C3691983-12-19019 December 1983 Advises of Intent to Rerack Spent Fuel Pools & to Assist NRC in Scheduling Licensing Activities.Meeting on 840131 W/Nrc & Westinghouse Tentatively Scheduled to Discuss Spent Fuel Pool Reracking.Proposed Agenda Encl Project stage: Meeting ML20080P8411984-02-17017 February 1984 Application for Amend to Licenses NPF-9 & NPF-17,allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel Pool.Supporting Documentation Encl Project stage: Request ML20080P8471984-02-17017 February 1984 Proposed Tech Specs Allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel Pool Project stage: Other ML20263N5111984-03-20020 March 1984 Auxiliary Building Units 1 & 2 Spent Fuel Pool Liner. Rev Date Illegible Project stage: Other ML20263N4871984-03-20020 March 1984 Auxiliary Building Unit 1 Spent Fuel Pool Sections Concrete. Sheet 2.Rev Date Illegible Project stage: Other ML20140C2751984-06-0707 June 1984 Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Per 840514 Request.Health Physics & Emergency Training Administered,Per 10CFR19 & Reg Guide 8.27 Project stage: Other ML20092A5631984-06-11011 June 1984 Forwards Addl Info Re Spent Fuel Pool Rerack Mods,In Response to 840530 Telcon Request Project stage: Other ML20092J3971984-06-19019 June 1984 Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods in Response to 840611 Request from Franklin Research Ctr Project stage: Other ML20092N9171984-06-22022 June 1984 Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Requested by 840607 Telecopy from Franklin Research Ctr Project stage: Other ML20093A2481984-07-0202 July 1984 Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods Requested at 840626 Meeting.Seismic Analysis Performed Using Combination of 2-D non-linear & 3-D Linear Models Project stage: Meeting ML20090F3071984-07-16016 July 1984 Discusses 840710 Telcon Between D Fieno & W Mcdowell Re Spent Fuel Pool Two Region Rerack Mods.Util Commits to Physical Blocks in Nonfuel Locations During Checkerboard Storage Project stage: Other ML20090F2801984-07-16016 July 1984 Forwards Addl Info Re Spent Fuel Pool Two Region Rerack Mods,In Response to 840712 Telcon Project stage: Other ML20090H5041984-07-20020 July 1984 Discusses Re Proposed Amend to Licenses NPF-9 & NPF-17 to Allow Spent Fuel Pool Storage Capacity Expansion.Reemphasizes That Schedule Must Be Maintained to Complete All Rerack Work Prior to First Refueling Project stage: Other ML20198P4611984-07-20020 July 1984 Submits Review of Calculations Provided for Licensing of McGuire Nuclear Station Spent Fuel Racks & Util Nuclear Licensing Rept for High Density Spent Fuel Racks for Oyster Creek Nuclear Generating Station Project stage: Other ML20094C3811984-08-0202 August 1984 Forwards Proprietary Addl Info Re Spent Fuel Pool Two Region Rerack Mods,Addressing Concerns Raised During 840731 Meeting.Affidavit Will Be Submitted by Westinghouse.Info Withheld (Ref 10CFR2.790) Project stage: Meeting ML20106A4341984-08-10010 August 1984 Revised Evaluation of Spent Fuel Racks Structural Analysis, McGuire Nuclear Station Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20094N3341984-08-13013 August 1984 Forwards Corrected Page to 840802 Addl Info Attachment Re Spent Fuel Pool Two Region Rerack Mods.Only Page 1 of Attachment Considered Proprietary to Westinghouse Project stage: Other ML20093E1171984-09-24024 September 1984 Safety Evaluation Supporting Amends 35 & 16 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML20093E1041984-09-24024 September 1984 Amend 35 & 16 to Licenses NPF-9 & NPF-17,respectively, Changing Tech Specs to Permit Expansion of Spent Fuel Pool Storage Capacity Project stage: Other 1982-05-08
[Table View] |
Text
,,.,
4 i,
I DUKE POWER COMPANY MCGUIRE NUCLEAR STATION Proposed Technical Specification Revision 8402230149 840217 PDR ADOCK 05000369 P
PDR
=
w DESIGN FEATURES 5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The Reactor Coolant System is designed and shall be maintained:
a.
In accordance with the Code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Rcquirements, b.
For a pressure of 2485 psig, and c.
For a temperature of 650 F, except for the pressurizer which is 680*F.
VOLUME 5.4.2 The total water and steam volume of the Reactor Coolant System is 12,040 100 cubic feet at a nominal T of 525 F.
avg 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.1-1.
5.6 FUEL STORAGE CRITICALITY 5.6.1 The new and spent fuel storage racks are designed and shall be maintained with:
a.
Akeff equivalent to less than or equal to 0.95 when flooded with unborated water, which includes a conservative allowance for uncertainties as described in Section 9.1.2.3.1 of the FSAR, and b.
A nominal 21-inch center-to-center distance between fuel assemblies placed in the new fuel storage vault rach and c.
A nominal 10.4-inch and 9.125-inch center-to-center distance between fuel assemblies placed in Region 1 and Region 2 storage racks, respectively, in the spent fuel storage pool.
DRAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 745 f t. 7 in.
CAPACITY 5.6.3 the spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1463 fuel assemblies (286 spaces in Region 1 and 1177 spaces in Region 2) having an initial enrichment less than or equal to 4.0 weight percent U-235.
McGUIRE - UNITS 1 and 2 5-7
,s 5.7 COMP 0NENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7-1.
l McGUIRE - UNITS 1 and 2 5-7a
ow 3/4.9 REFUELING OPERATIONS 3/4.9.12 FUEL STORAGE - SPENT FUEL STORAGE P00L LIMITING CONDITION FOR OPERATION 3.9.12 Fuel is to be stored in the spent fuel storage pool with:
a.
Storage in Region 2 restricted to the following:
- 1) Fuel which has been qualified in accordance with Figure 3.9-2 or unqualified fuel stored in a checkerboard configuration.
In the event checkerboard storage is used, one row between normal storage locations and checkerboard storage locations
.will be vacant; and 2)
Irradiated fuel which has decayed at least 16 days; and b.
The boron concentration in the spent fuel pool maintained at greater than or equal to 2000 ppm.
APPLICABILITY:
During storage of fuel in the spent fuel pool.
ACTION:
a.
Suspend all actions involving the movement of fuel in the spent fuel pool if it is determined a fuel assembly has been placed in the incorrect Region until such time as the correct storage location is determined. Move the assembly to its correct location before resumption of any other fuel movement.
b.
Suspend all actions involving the movement of fuel in the spent fuel pool if it is determined the pool boron concentration is less than 2000 ppm, until such time as the boron concentration is increased to 2000 ppm or greater.
c.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.12.a.
Verify all fuel assemblies to be placed in Region 2 of the spent fuel pool are within the enrichment and burnup limits of Figure 3.9-2 by checking the assemblies' design and burnup documentation.
b.
Verify at least once per 31 days that the spent fuel pool boron concentration is greater than 2000 ppm.
3/4 9-
REFUELING OPERATIONS s
(LATER)
Figure 3.9-2 Minimum Burnup vs. Initial Enrichment for Region 2 Storage 3/4 9-