Discusses Re Proposed Amend to Licenses NPF-9 & NPF-17 to Allow Spent Fuel Pool Storage Capacity Expansion.Reemphasizes That Schedule Must Be Maintained to Complete All Rerack Work Prior to First Refueling
ML20090H504
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/20/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
TAC-53531, TAC-53532, NUDOCS 8407260333
Download: ML20090H504 (2)


Text

o ,

-4 DUKE POWER GOMPANY P.O. BOX 03180

. CHAMLOTrE, N.C. 28242

.HAL H. TUCKER TELEPHONE vna r.nemswe (704) 3NS31

==. -mo. July 20, 1984 h

, Mr. Harold R. Denton, Director

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington','D. C. 20555 Attention: Ms. E. G.~Adensam, Chief g Licensing Branch No. 4 Re::-McGuire Nuclear Station Docket Nos.- 50-369, 50-370

Dear Mr. Denton:

.On February 17, 1984, Duke Power submitted a proposed amendment to Facility Operating Licenses NPF-9 and NPF-17 to allow spent fuel pool storage capacity expansion at McGuire Nuclear Station. Duke Power would like to reemphasize the schedule which must be maintained in order to complete all of the rerack work prior to the:first refueling of Unit 2.

The Unit. 2'rerack schedule requires work to begin on August 1, 1984. At this time, the spent fuel pool will still be dry. Rack removal and installation Lwill. be performed .from August 1 to November 1,1984. From August 7 to November

---7, 1984, drag testing and indexing will take place. Cleaning, filling the pool, and chemistry work will be performed between November 7 and December 23, 1984.

L ~ This schedule is based on a work schedule of two 10-hour shifts working 6 days

.-per week. December 23 1984 is a calculated shutdown date for refueling based on a 90% capacity factor.

If the Unit 2 reracking is not completa prior to the first refueling of Unit 2, an additional cost of 1.5 million dollars will be incurred due to having to rerack with water in the pool. Another factor to consider is the ALARA con-sideration that.must be made if there is spent fuel in the pool. In order to prevent this from occuring, Duke Power has determined the August 1, 1984 start date as essential.

IDuke Power appreciates the NRC taking these factors into consideration for the tineliness of'the staff's' review. Please contact us if there are further

> -questions regarding this matter.

.Very.truly yours, v

l ,

l Hal B.' Tucker.

I 1 Q WHN/rha I 8407260333 840720 PDR ADOCK 05000369

-P- PDR L_'

> < r a Mr. Har:1d'R. Dent n, Dirreter

.v- fJuly 20; 1984:

~- : P;gs ,2 m ,

s ~

cc: .Mr.'Ji P. O'Reilly, Regional Administrator U.' S. Nuclear Regulatory Conmission

-Suite 2900-

, ' 101: Marietta Street, NW ~

-j -.  ::Atlantai' Georgia 30323.

j--Mr. W. T. Orders.

Senior Resident-Inspector McGuire Nuclear. Station-s 1