ML20043A056

From kanterella
Jump to navigation Jump to search
Submits Decommissioning Rept Info for Washington State Univ Modified Triga Reactor.Univ Will Either Submit Application for Renewal or Formal Decommissioning Plan 2 Yrs or More Prior to Expiration Date of 020811
ML20043A056
Person / Time
Site: Washington State University
Issue date: 04/19/1990
From: Rich Smith, Van Wie B, Wilson W
WASHINGTON STATE UNIV., PULLMAN, WA
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9005170273
Download: ML20043A056 (3)


Text

.. .

k s

.o >

Washington .

State University l Nuclear Radiation Center, Pullman, Washington 99164 1300 / 509-335-8641 i

April 19, 1990  :

Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 .

Docket No.t 50.27

  • i Gentlemen:

A In accordance with the requirements of 10 CFR 50.33 and 50.75, the following decommissioning report information for the Washington State University modified TRIGA reactor is hereby i submitted:

1) The estimated cost for the complete decommissioning of  :

the WSU TRIGA reactor facility is $3.84 million. This cost estimate was prepared by the Installation and Contruction Services Manager of the Nuclear and Advanced Technology Division of Westhinghouse Electric Corporation '

in pittsburgh, Pennsylvania, assuming that Westinghouse would provide all the people and services needed to perform the decommissioning operation. A schedule is attached indicating the time required - for each phase of '

the decommissioning operation.  ;

2) Washington State University is a state institution and i i

thus, according to the provisions of 50.75(e) (2) (iv) , the funds needed for decommissioning will be requested from the Washington State Legislature if and when a decision to decommission'the WSU reactor facility is made.

3) The cost estimate for decommissioning the WSU TRIGA reactor facility for years 1991 and .beyond will be l

adjusted for inflation by the consumer ' price index and [

the new-estimate kept on file at the facility.  ;

Facility License R-76 for the WSU modified TRIGA reactor expires on August 11, 2002. In accordance with the requirements of 50.02, WSU will either submit an application ,#

i gm nwcx wocygg7

4 fo'r renewal of the license or a formal decommissioning plan two years or more prior to this date.

Sincerely, bO W. E. Wilson Associate Director Approved: MII B.J. VM/Wie, Chair M

Re t' Safeguards Committee Approved: ~

M Rokfrt V. Smith,' Vice Provost for Research & Dean of the Graduate School Enclosure WEW crc I

9 i FIGU R E 1 l

WASI-ilNGTON STATE . UNIVERSITY i

DECOMMISSIONING SCHEDULE- '

MONTHS 1 23456 7 8 9 1011121314151617181920 mimimimimimimimimimimimimimimimimlmimlm l

!~

1.PEPARE DECO M PLAN

2. PREPARE LICENSE DOC.
3. REGULATORY REVIEW 6

!  ! l- !  ! l ilili'l*ill!!

lll!

PummuPufu8',lI i

I ll ji*l!

l

4. DETAIL WORK PACKAGES li i

l.ll--lllli-ii-i?  :

5. EQUIP. & SERVICES -  !! .'
6. STAFFING & TRAINING !ll,!l  !-l l l'l M ,

l .

l- ljl!

l

'7.lNSTALL TEMP. EQUIP. ll!ll l1 Mjl E

8.DEFUELING

9. RADIATION SURVEY

,i l

l l  !

l l

l l

l l

li I
l :M l l!l

,I

!!!!!llii!!ii Mi

10. GENERAL CLEANUP llllll,%j!!i.ll

! i

11. REMOVE REACTOR COMP.

lllll i !!!!!!!!!!il!M i

i i!!!ii!!!!!j:!

12. REMOVE CONCRETE POOL .@,!

L 13. REMOVE MECH. EQUIP  !!!!!! !!!!!!.l l lEEEiuli.

14. REMOVE PIPING
15. REMOVE I & C SYSTEMS llllll!lll'I ll!!!!!!!li1g!i il'M I '
16. REMOVE ELEC. SYSTEMS ll!!.!!!!l!!

!'ui'ai.

i  :

.: M

17. REMOVE HVAC SYSTEMS i i i i 1 t l  :.

i  !  !  !  : i  : i  ! i 1 i

: 1.

j j lj:

i  :  : :  :  :  :  : -:  :

L

18. PACK -& SHIP WASTES
19. FINAL RADIATION SURVEY l!!! jll!j!!ji!j'l~!l.anu 8

j ,

_ _ _.._ _________ _ _ _ _ _ _ - - - - - - - -- - - -