Text
_
k s
.o Washington State University Nuclear Radiation Center, Pullman, Washington 99164 1300 / 509-335-8641 i
April 19, 1990 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket No.t 50.27 i
Gentlemen:
A In accordance with the requirements of 10 CFR 50.33 and 50.75, the following decommissioning report information for the Washington State University modified TRIGA reactor is hereby i
submitted:
1)
The estimated cost for the complete decommissioning of the WSU TRIGA reactor facility is $3.84 million.
This cost estimate was prepared by the Installation and Contruction Services Manager of the Nuclear and Advanced Technology Division of Westhinghouse Electric Corporation in pittsburgh, Pennsylvania, assuming that Westinghouse would provide all the people and services needed to perform the decommissioning operation.
A schedule is attached indicating the time required - for each phase of the decommissioning operation.
2)
Washington State University is a state institution and i
thus, according to the provisions of 50.75(e) (2) (iv), the i
funds needed for decommissioning will be requested from the Washington State Legislature if and when a decision to decommission'the WSU reactor facility is made.
3)
The cost estimate for decommissioning the WSU TRIGA reactor facility for years 1991 and.beyond will be l
adjusted for inflation by the consumer ' price index and
[
the new-estimate kept on file at the facility.
Facility License R-76 for the WSU modified TRIGA reactor expires on August 11, 2002.
In accordance with the requirements of 50.02, WSU will either submit an application i
gm nwcx wocygg7
4 fo'r renewal of the license or a formal decommissioning plan two years or more prior to this date.
Sincerely, bO W. E. Wilson Associate Director Approved:
MII M
B.J. VM/Wie, Chair Re t' Safeguards Committee Approved:
~
M Rokfrt V. Smith,' Vice Provost for Research & Dean of the Graduate School Enclosure WEW crc I
9 i
FIGU R E 1
l WASI-ilNGTON STATE. UNIVERSITY i
DECOMMISSIONING SCHEDULE-MONTHS 1 23456 7 8 9 1011121314151617181920 mimimimimimimimimimimimimimimimimlmimlm l
1.PEPARE DECO M PLAN 6
ilili'l*ill!!
!~
lll!
ll l
- 2. PREPARE LICENSE DOC.
- 3. REGULATORY REVIEW l- !
l PummuPufu8',lI I ji*l!
i i
- 4. DETAIL WORK PACKAGES l.ll--lllli-ii-i?
li
- 5. EQUIP. & SERVICES -
l
!ll,!l !-l l l'l M,
l-ljl!
- 6. STAFFING & TRAINING l
'7.lNSTALL TEMP. EQUIP.
,i l
! ll!ll l1 Mjl l!l 8.DEFUELING l
l l
l l
l l
l l i :l :M l
I
,I
- 9. RADIATION SURVEY E
!!!!!llii!!ii Mi
- 10. GENERAL CLEANUP i lllll llllll,%j!!i.ll i
- 11. REMOVE REACTOR COMP.
i !!!!!!!!!!il!M i
- 12. REMOVE CONCRETE POOL i!!!ii!!!!!j:!
L
- 13. REMOVE MECH. EQUIP
!!!!!! !!!!!!.l l
lEEEiuli.
llllll!lll'I I
il'M
- 14. REMOVE PIPING
- 15. REMOVE I & C SYSTEMS ll!!!!!!!li1g!i'
- 16. REMOVE ELEC. SYSTEMS ll!!.!!!!l!!
!'ui'ai.
i i
i i
1 i
l
- . M t
- 17. REMOVE HVAC SYSTEMS i
i i
i 1.
1 i
- 18. PACK -& SHIP WASTES j
j lj:
i
-jll!j!!ji!j'l~!l.anu j
- 19. FINAL RADIATION SURVEY l!!!
8 L
- - -