|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20202E1611997-12-0101 December 1997 IST Program Third Ten Yr Interval Submittal. W/32 Oversize Drawings ML20211Q1221997-10-14014 October 1997 Rev 22,change 2 to OP-1903.011, Emergency Response Notifications ML20198J8081997-10-14014 October 1997 Rev 28,Permanent Change 2 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20217K3001997-08-0808 August 1997 Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation ML20151K2241997-07-29029 July 1997 Change PC-01,Rev 6 to OP-1903.035, Adm Potassium Iodide ML20148T0441997-07-0101 July 1997 Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof) ML20148T0221997-07-0101 July 1997 Change AP-06 to Rev 6 to Procedure OP-1903.035, Adm Potassium Iodide ML20148T0051997-07-0101 July 1997 Change PC-01 to Rev 32 to Procedure OP-1903.060, Emergency Supplies & Equipment ML20141C5421997-06-17017 June 1997 2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc) ML20148T5391997-06-0101 June 1997 Rev 0 to Third Ten-Year Interval ISI Plan for ANO Unit 1 ML20140C0951997-03-26026 March 1997 Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation ML20137D9271997-03-18018 March 1997 Rev 21-04-00,Change PC-04 to OP-1903.011, Emergency Response/Notifications ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20115D8901996-07-10010 July 1996 Permanent Change (Pc) PC-03 to Rev 11 to OP-1903.065, Emergency Response Facility Tsc ML20107G3981996-04-17017 April 1996 Rev 4 to Procedure 1903.053, Logistical Support, Combining Procedures 1903.054 & 1903.078 in W/Procedure 1903.053 & Deleting Procedures 1903.054 & 1903.078 Completely ML20107G4231996-04-17017 April 1996 Rev 4 to Procedure 1903.078, Emergency Response Support, Deleting Procedure.Info from Procedure Incorporated Into Procedure 1903.053, Logistical Support ML20107G4011996-04-17017 April 1996 Rev 6 to Procedure 1903.054, Addl Personnel, Deleting Procedure.Pertinent Info,Instructions & Requirements from Procedure Will Be Incorporated Into Procedure 1903.053, Logistical Support ML20101E3851996-03-13013 March 1996 Rev 15 to OP-1903.062, Communication Sys OP Procedure ML20101E3571996-03-13013 March 1996 Rev 28 to OP-1903.061, Communication Equipment Test ML20101E3771996-03-13013 March 1996 Rev 8 to OP-1903.066, Emergency Response Facility Osc ML20097B2221996-02-0606 February 1996 Change AP-33 to Rev 33 to OP-1903.010, EAL Classification ML20095F9611995-12-0707 December 1995 Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer Method ML20091K8261995-08-28028 August 1995 Change PC-1 to Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20087B6431995-08-0808 August 1995 Rev 27 to Procedure/Work Plan 1904.002, Offsite Dose Projection Rdacs Computer Method ML20086B3901995-07-0505 July 1995 Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20084U7381995-06-13013 June 1995 Page 14 of Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/Notifications ML20084L9881995-05-25025 May 1995 Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/ Notifications ML20097B2201995-05-16016 May 1995 Change PC-2 to Rev 31 to OP-1903.060, Emergency Supply Equipment ML20083Q2961995-05-16016 May 1995 Rev 13 to Procedure/Work Plan 1905.002, Offsite Emergency Monitoring ML20083Q3071995-05-16016 May 1995 Rev 31 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20083Q2891995-05-16016 May 1995 Rev 6 to Procedure/Work Plan 1903.064, Emergency Response Facility - Cr ML20083L6171995-05-0505 May 1995 Rev 9 to Procedure/Work Plan 1903.034, EOF Evacuation ML20083L6141995-05-0505 May 1995 Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210 ML20083L5941995-05-0505 May 1995 Rev 5 to Procedure/Work Plan 1905.004, EOF Radiological Controls ML20082E2211995-03-31031 March 1995 Rev 1 to Procedure/Work Plan 1903.068, Emergency Response Facility - Emergency News Center ML20081K0331995-03-16016 March 1995 Rev 27 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20078R0771995-02-0909 February 1995 Rev 21 to Procedure/Work Plan 1903.030, Evacuation ML20078G8921995-01-26026 January 1995 Rev 30 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20078J1101995-01-13013 January 1995 Public Version of Rev 14 to Operating Procedure 1903.062, Communication Sys Operating Procedure ML20095J6271995-01-0303 January 1995 Permanent Change (Pc) PC-01 to Rev 11 to Procedure/Work Plan OP-1903.065, Emergency Response Facility Tsc 1999-08-04
[Table view] |
Text
,
e ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One ERE RECORD OF CHANGES AND REVISIONS FO N No. 1000.06A REV. # 12 PC #
EMEFGENCY PLAN PROCEDURE l Safety Related YES ( NO O s
)' f' s PERSONNEL EIIERGE!!CY
' 1903.23j REV. 6 S
\ " !}.,j,d.1.'ud frh ~
(idd l) Ai t " t's ' ' -) -) 'a d V Lj.k - - - ~
.s s . PAGE REV PC# PAGE REV PC# PAGE REV PC// PAGE REV PC# PAGE REV PC#
1 6 2 6
,-',/
3 6 -
4 6
/
5 6 ./
6 6 /
7 6 f'
,/
O /
/
/
f APPROVED B APPROVAL DATE
() , [ ,
3-7-V3 REQUIRED EFFECTIVE DATE:
V ~(General iger) '
8303300054 830323 PDR ADOCK 05000313 F PDR _
s l
l PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:
F"rQarMrv DTAM PFRSOMMri FMrparMrv 1903.23 1 PAGE 1 of 7 o
qj ARKANSAS NUCLEAR ONE arv=oa CHANGE e oars DATE 02/24e83 l 1.0 PURPOSE The purpose of this procedure is to provide guidance to ANO personnel on how to respond to a personnel emergency. This emergency may be medical or contamination-related medical.
2.0 SCOPE This procedure outlines the general response to be taken during a person-nel emergency. It is not intended to give medical guidance for use during the emergency.
3.0 REFERENCES
3.1 References Used in Procedure Preparation:
3.1.1 Arkansas Muclear One Emergency Plan 3.1.2 Red Cross First Aid Instruction Pamphlets 3.1.3 NCRP Report No. 39, " Basic Radiation Protection Criteria" 3.1.4 NCRP Report No. 65, " Management of Persons Accidently Con-
[)
\s' taminated with Radionuclides"
_ 3.2 References Used in Conjunction with this Procedure:
3.2.1 1622.010, " Personnel Decontamination" 3.2.2 1903.33, "Re-Entry Guidelines" l 3.2.3 1903.74, " Pope County Ambulance Service" 3.3 Related ANO Procedures:
3.3.1 1903.42, " Duties of the Emergency Medical Team" 3.3.2 1903.72, "St. Mary's Hospital" 3.3.3 1903.73, "Millard-Henry Clinic";
3.3.4 1000.38, " Arkansas Nuclear One Industrial Safety Program" l 3.4 Regulatory correspendence containing URC commitments which are im-plemented in this procedure include:
3.4.1 Letter OCAU108213, Appendix A. Item 1
-~s A. Section 7.2.2 J
PLANT MANUAL SECTIOO: PROCEDURE / WORK PLAN TITLE: NO:
rMengrMCV PTAM PERSOMMEL EMERGEMCV 1903.23 PAGE 2 of 7 p j ARKANSAS NUCLEAR ONE aEvisiON CHANGE e DATE DATE 02/24/83 4.0 DEFINITIONS 4.1 A serious injury that requires action specified in this procedure is defined as an injury to any person that has resulted in:
4.1.1 More than a momentary loss of consciousness.
4.1.2 An actual or suspected fracture.
4.1.3 A head injury.
4.1.4 An injury that may have damaged internal organs.
4.1.5 A serious burn.
4.1.6 Hemorrhaging.
4.1.7 Receipt of a large dose of radiation (i.e., greater than 50 R).
5.0 PRECAUTIONS 5.1 Personnel administering first aid to an injured person in a suspected I \ or undefined radiation field should be joined by a Health Physics
-/ representative as soon as possible.
5.2 Entry into evacuated or high radiation areas for the purpose of attending to injured or contaminated individuals shall be in accordance with 1903.33, "Re-entry Guidelines".
5.3 If it is not clear that the individual can be moved without harm, he should not be moved until further help arrives, unless the in-dividual would be in danger of Icss of life or limb.
5.4 Individuals who have suffered any of the conditions described in Section 4.0 should receive a medical examination prior to returning to work.
6.0 IMMEDIATE ACTIONS 6.1 In the event of a personnel emergency, personnel in the vicinity of the affected individual should: ,
6.1.1 Administer immediate first aid and attention. This attention should consist of:
A. Stepping bleeding by applying pressure.
lT U
. PLANT MANUAL S,ECTION': PROCEDURE / WORK PLAN TITLE: NO:
. CMcCGrMrv DTAM PFRSOMMFt_ EMEROFMcy 1993.23 PAGE 3 of 7
,q ARKANSAS NUCLEAR ONE Revision o DATE 02/24/83
( ,
CHANGE DATE B. Using resuscitation techniques.
C. Keeping the individual calm and comfortable until further help arrives.
6.1.2 Notify either uait's Shift Supervisor (prefered), the Safety & Fire Prevention Coordinator or the individuals Supervisor.
6.1.3 Remain available to provide information to the appropriate medical personnel.
7.0 FOLLOW-UP ACTIONS 7.1 For any medical emergency, either unit's shift Operations Supervisor should be informed, if not previously done; periodic updates should be provided to the shift Supervisor initially contacted.
7.2 The Shift Operations Supervisor shall direct appropriate medical assistance to the injured individual. The following groups should be called upon (when on site) to provide assistance:
NOTE: These groups should be contacted by the most expedient means
[-~,')
available (if the page is used, the announcement should be
repeated several times).
7.2.1 Bechtel Nurse (3736).
7.2.2 Emergency Medical Team or Shift Maintenance Medical Team (After routine working hours - 3142/3411).
7.2.3 Safety & Fire Prevention Coordinator (3131).
NOTE: First Aid Supplies are maintained in the following locations.
A. Unit 1 Turbine Building, Elev. 354 South (Fire Locker).
B. Unit 2 Turbine Building, Elev. 354 North (Fire Locker).
C. Unit 1/2 Turbine Building Elev. 386 (Fire Locker).
D. First Aid Room - Second Floor Administration Building.
7.3 When directed, the appropriate medical personnel onsite should respond to the location where the injured or contaminated individuals are located and:
-~ 7.3.1 Administer appropriate first aid measures.
O
PLANT MANUAL SECTIONi PROCEDURE / WORK PLAN TITLE: NO:
CMrRGFMCY PT AM PERSOMMrt FMcRGrMrv 1903.23 PAGE 4 of 7 n
- j ARKANSAS NUCLEAR ONE aEvismN CHANGE s o*TE DATE 02/ w s3 N,s 7.3.2 Record information on Form 1903.23A.
7.3.3 Provide the Shift supervisor with an assessment of the situation (to include further needs, if necessary).
l 7.3.4 Gather necessary information from the personnel initially on the scene (to include individual's name for future re-ference).
f 7.3.5 Obtain the injured person's security badge but DO NOT re-move their dosimeter and TLD until arrival at the medical facility. Upon arrival at the medical facility, the ac-companying Health Physics personnel should remove the in-jured person's dosimeter and TLD for further identification and dose determination.
7.4 If an individual is potentially contaminated, the following pre-cautionary measures should be taken (as allowed by the nature of the injury), as necessary:
NOTE: The Shift operations superviscr shall ensure that a Health Phy-sies representative is assigned to accompany the individual (s) both onsite and to offsite medical facilities, as necessary.
[ ,s)
\~ / 7.4.1 Take precautions (coverings, use of stretcher, etc.) to prevent the spread of contamination during movement and transport of the individual.
7.4.2 Move the individual to a " clean" area, as allowed by step 5.3.
7.4.3 Remove contaminated clothing.
7.4.4 survey the individual for surface contamination.
NOTE: Contaminated wounds, eyes, etc., should be decontaminated by use of water only; wounds should be covered before and I after decontamination efforts.
7.4.5 Decontaminate the affected areas removing as much transfer-able contamination as possible per 1622.010, " Personnel De-contamination".
1 .
I 7.4.6 Cover remaining contaminated areas.
HOTE: If an individual is potentially contaminated and requires transportation to an offsite medical facility, he should be initially transparted to St. Mary's Hospital.
(%
N~-]
PLANT MANUAL SECTIONf PROCEDURE / WORK PLAN TITLE: NO:
FMennrMrv otAM prR ROMMri FMeparMcy long,23 PAGE q of 7 ARKANSAS NUCLEAR ONE aEwsmN 4 DATE mwn r,\ CHANGE DATE (w/
7.5 The Shift operations Supervisor may make arrangements for treatment based upon the assessment of a qualified medical individual. If a qualified medical individual is not available, the following guidance is provided:
7.5.1 If the injured individual (s) requires attention from a doctor and are judged incapable of travel, the appropriate physicians should be called from Millard-Henry Clinic (968-2345) or St. Mary's Hospital (968-6211), advised of the physical and radiological condition of the injured, and requested to come immediately to ANO. The Pope County Ambulance Service should also be contacted (refer to step 7.5.2).
7.5.2 If the injured individual (s) requires immediate attention from a doctor and are judged capable of travel, the Pope County Ambulance Service should be called at 968-4567, ad-vised of the physical and radiological condition of the in-jured and requested to come immediately to ANO. If contami-nation is involved, a Health Physics representative should immediately be dispatched to the emergency entrance at St.
Mary's Hospital to assist the hospital staff as the situation warrants (use call-out list in procedure 1903.10, Attachment 5, if necessary).
[)
v NOTE: An Unusual Event Emergency Action Level shall be declared by the Shift Operations Supervisor when a medical emergency requires transporting a radiologically contaminated indi-vidual from the site to an off site hospital. (Reference procedure 1903.10, " Emergency Action Level Response".)
7.5.3 If the injured individual (s) do not require immediate atten-tion from a doctor and are judged capable of travel, ar-rangements chould be made to transport the individuals for further examination to Millard-Henry Clinic or St. !!ary 's Hospital.
7.5.4 If the injured individual or individual (s) attending to the injured individual are suspected of having received a radia-tion dose in excess of 50 R, arr;angements should be made to transport those individuals to the University of Arkansas Medical Sciences Hospital in Little Rock for treatment, as necessary, after examination at St. Mary's Hospital.
p N./I
PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:
FUrparMrv PTAM PFPs0MMFT FMirpacMrv 1903.23 PAGE 6 of 7
- ARKANSAS NUCLEAR ONE aEvmioN 8 DATE 02n4m N'3
..) --
CHANGE DATE 7.6 The Shift Operations Supervisor should notify the Duty Guard Eergeant if off-site medical assistance has been requested to report onsite so that Security personnel may be ready to receive and escort the medical personnel. (Routine access point - tiorth Gate; routine receiving area - Maintenance Facility Breezway, unless otherwise directed.)
If the situation requires tne ambulance personnel to enter a poten-tially contaminated area, refer to 1903.74, " Pope County Ambulance Service" for further guidance.
7.7 If the injured individual is transported to a medical facility, the Shift operations Supervisor should call the appropriate medical faci-lity and advise them, as known, of the nu.aber of individuals involved, a description of the medical emergency and whether or not contamina-tion is involved.
7.7.1 Millard Henry Clinic (9e8-2345) 7.7.2 St. Mary's Hospital (968-6211 or 968-2481) 7.7.3 University of Arkansas Medical Sciences Hospital (661-5000) 7.8 An escort, as indicated below, should accompany the injured individ-ual(s) to provide any necessary information or assistance to the
(')
s ,/
medical personnel and provide periodic updates to the Shift Super-visor (or other individual, as directed).
7.8.1 If the individual is contcminated, a Health Physics repre-sentative shall accompany.
7.8.2 If the individual is not contaminated, one of the following individuals should accompany:
A. Erergency Medical Team Member B. Bechtel Murse (If Bechtel personnel are involved)
C. Safety and Fire Prevention Coordinator D. An AMO Management Representative E. Any knowledgable member of the plant staff 7.9 Followupandreporting(written)ofthepersennelinjurEoraccident should be accomplished as stated in reference 3.3.4 (Para. 6.8).
8.0 ATTACHME!!TS AND FORMS 8.1 Form 1903.23A " Personnel Injury" O
V
~
y --
PLANT MANUAL SECTION: PROCEDURE 1 WORK PLAN TITLE: NO:
FifCROF? rV PT MI I
PERSOfif fEI F?' CRC:f frv 1903.23 PAGE 7 of 7 O ARKANSAS NUCLEAR ONE aEvisioN CHANGE s oATE 02/24/s3 e DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLETIRSchrJEL INJURY l FORM NO. 1903.23A REV. #" PC #
Date/ Time _
t Name/ Badge Number TLD Niunber Dosimetry Vital Signs:
Time B/P
\
Pulse i Resp.
I
! Injuries I .
I l
[ -
Contamination: No (
i
)
l f , SC i Extent of Contamination i
I I
O .3 ke h
.- .-