Part 21 Rept Re Defect in Hose Assembly 77379.Assembly Welded w/60-degree Rather 30-degree Elbow Installed. Condition Reported to Bechtel
ML20072D498
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 05/09/1983
From: Shafer J
METAL BELLOWS CORP.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-83-903-000 PT21-83-903, PT21-83-903-000, NUDOCS 8306230277
Download: ML20072D498 (4)


Text

. s METAL BELLOWS CORPORATION P.O. BOX 2447,20960 KNAPP ST., CHATSWORTH, CA 91311 USA TEL:(213) 341-4900, TELEX: 651-483 May 9, 1983 l

U.S. Regulatory Commission Region IV 6111 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Attn: J.T. Collins i

Gentlemen:

The purpose of this correspondence is to inform you of a j potentially reportable defect under 10CFR, part 21. We have

! supplied our part no. 77379, flexible hose assembly, to the Calloway plants and have subsequently discovered that the assembly was welded with a 600 rather than a 30 elbow in-stalled. This condition has been reported to the Bechtel Power Corporation in Gaithersburg, Maryland. A copy of the report is enclosed for your reference.

Yours Truly,

. Shafe Q6ality surance Manager Encl. (1) p g;l,,;C OMGil AL . 1 CertifiedBykd-(d[(f([--

IO 8306230277 830509 DR ADOCK 05000 8 g 'h

\

7

/4

ma fu _

e METAL BELLOWS CORPORATION P.O. BOX 2447,20960 KNAPP ST., CHATSWORTH. CA 91311 USA TEL (213) 341-4900. TELEX: 651-483 May 4, 1983 Bechtel Power Corp.

15740 Shady Grove Road Gaithersburg, Maryland 20760 Attn: Project Engineering Manager Job 10466-M-133 Calloway Plants, Units 1 and 2 Ref: Bechtel P.O. 10466-M-133-2, Item 1.17 MBC Job No. A14573 MBC P/N 77379 (Hose Assembly), S/N 080 Gentlemen:

The purpose of this letter is to bring to your attention a defect we believe exists in the above described hose assembly which was shipped to the Calloway plant on April 7, 1981.

We have received from the Wolf Creek plant another P/N 77379 l hose assembly in which a 60 rather than a 30 elbow (P/N l 77968) had been installed. Since the two hose assemblies l (The one built for Wolf Creek and the one built for Calloway) l were manuf ac tured at the same time and from the same materials, l we believe that the assembly shipped to you also has a dis-crepant elbow.

Our Project Engineer, Mr. Ron Nystrom, has determined that, if present, a 600 elbow might result in premature failure of the hose assembly. However, the exact conditions of install-ation of the hose assembly also affect its serviceability.

l Accordingly, we request that you have one of your engineers l contact Mr. Nystrom so that they might determine if the elbow is discrepant and, if so, coordinate in arriving at a dis-position.

l l

METAL +f.;;;f CORPOR ATION We sincerely regret any inednvenience this matter might cause you. Should it prove necessary to rework the hose assembly to conform to our drawing, we shall expedite our work to the best of our ability. Of course, all costs con-nected with reworking the hose assembly would be borne by Metal Bellows Corporacion.

Respectfully,

- O Paul B. Campbell Corp. Vice President, Engineering I

l i-

4 Dato: 12/3/81__Section: 3

- Dece Proceduro: 8 Revised: __

Pago: 3 of 3 Division Affected: Chatsworth METAL BELLOWS CORPORATION DEFECT AND NON-COMPLIANCE NOTIFICATION REPORT REPORTING. ENTITY: Metal Bellows Corporation 20960 Knapp St., Chatsworth, Ca. 91311 '

Telephone: (213) 341-4900; Telex 651-483

. 'l REPORTING INDIVkDUAL' Paul B. Camnbell -

TITLE vice President Eng.

REPORT DATE: 5/3/83 . ,

.MBC PART NO: 773I9 - PART DESCRIPTION: Hose Assemgly ,

CUSTOMER PART NO: N/A *-

~

, TECHNICAL SPEC. NO: 10466-M-1330, Lev,i3Fj Ecchtel Power / Daniel Int'1, Calloway'NPP, MBC CUSTOMER NAME & ADDRESS:

Portland, MO.

6'O rather than required 30 0 elbow (detail P/N NATURE OF DEFECT:

77968)' installed in hose assemb y.

l (Attach Additional Sheets if Necessary)

DATE INTORMATION RECEIVED: 5/3/83 _

NUMBER AND LOCATION OF ANY IDENTICAL OR SIMILAR COMPONENTS WHICH CONTAIN OR MAY CONTAIN THIS DEFECT No other locations COMP. NO. QTY. LOCATION V

i

' CORRECTIVE ACTION (S) TAKEN OR TO BE TAKEN: Discreoant elbow to be reclaced

! with correct elbow. MBC detail dwg for elbow has been revised to call out 300 instead of'607

NAME AND ADDRESS OF PERSON RESPONSIBLE FOR CORRECTIVE ACTION

'J.C. Shafer. Metal Bellows Corooration

! 20960 Knapp.St., Chatsworth, CA 91311 -

30 days after receipt at MEC DATE CORRECTIVE ACTION WILL BE COMPLETED; l ADDITIONAL ADVICE OR REMARKS Part is believed to be installed i n__

Calloway olant No. 1 or 2. -

s m

g .g.: ..; ,_ g .= g w ..

.