Submits Daily Highlight Re 820203 Insp of Steam Generator B to Determine Location of 820125 Ruptured Tube Event.Eddy Current Tests Performed on Tube Near Periphery on Hot Leg Side & Four Adjacent Tubes
ML20071H278
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/03/1982
From: Lyons J
Office of Nuclear Reactor Regulation
To: Carter J, Harold Denton, Eisenhut D
NRC
Shared Package
ML19302F297 List:
References
FOIA-82-309 NUDOCS 8202240397
Download: ML20071H278 (1)


Text

f\\

N y%'o

(

C~.

, E " g*

/

UNITED STATES g

('gp, NUCLEAR REGULATORY COMMISSION D

te p WASHINGTON, D. C. 20555 i

l

\\,,,,, /c February 3, 1992 1

Docket No. 50-244 c

MEMORANDUM FOR:

H. Denton (P-404)

J. Carter (P-436)

D. Eisenhut (528A)

R. Purple (528)

T. Novak (442)

G. Lainas (542)

R. Tedesco (1108)

S. Hanauer (242A)

R. Vollmer (P-202A)

T. Murley (MNBB-6113)

R. Mattson (P-1102A)

T. Ippolito (545)

J. Snie~zek (EW-359)

C. Michelson (EW-263)

C. J. Heltemes (MNBB-7217)

THRU:

Dennis M. Crutchfield, Chief Operating Reactors Branch #5, DL FROM:

James E. Lyons, Project Manager Operating Reactors Branch #5, DL

SUBJECT:

DAILY HIGHLIGHT

't. E. GINNA Shortly after midnight on Wednesday, February 3, 1982, the water level in the "B" steam generator was raised in order to determine which tube or tubes had failed January 25, 1982 at the R. E. Ginna Nuclear Power Plant. Almost immediately, water was noted from one tube near the periphery on the hot leg side.

Eddy current tests were performed on the ruptured tube and on the four adjacent tubes. The rupture was detemined to be a " fish mouth" break about 5 'iiiches long starting 3 inches above the tube sheet. The ruptured tube is not one of the 21 tubes involved in the sleeving program that began in November 1980.

-Fiber optic inspection of the ruptured tube is planned to be performed l

this morning.

Rochester Gas and Electric Corporation has committed to eddy current test 100% of the hot leg tubes in the "B" steam generator.

Region I is monitoring the situation closely and keeping NRR staff informed through' periodic updates.

c p

Jame::

. Lyo P oject Manager perat ng Reac o s Branch #5 q

Divis~ n of Licensing h

l l)d h L

.