ML20070Q625

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to FSAR
ML20070Q625
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/10/1983
From: Westafer G
FLORIDA POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20070Q628 List:
References
3F-0183-05, 3F-183-5, NUDOCS 8301270018
Download: ML20070Q625 (1)


Text

.

(^ .}Y,?Ki:3~

C

\J "$?g ,' ' [ vf I rQ y t d

Florida Power COmPOmaie0es January 10,1983 3F-0183-05 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Final Safety Analysis Report Revision

Dear Mr. Denton:

O V In our letter dated July 22, 1982, Florida Power Corporation made a commitment to supply an updated description of the Steam Generator Tube Rupture Analysis and several drawings which had been delayed.

To fulfill this commitment, we have enclosed Revision I to the Crystal River 3 Final Safety Analysis Report. One original and twelve (12) copies of this revision are included.

The Crystal River 3 Final Safety Analysis Report, Revision 2 will be filed no later than July 22,1983.

Sincerely, l ,

G. R. Westafer s

Manager Nuclear Licensing and Fuel Management

h TSW
mm Attachments cc: Mr. 3. P. O'Reilly, Regional Adrainistrator Office of Inspection & Enforcement p U.S. Nuclear Regulatory Commission l 101 Marietta Street N.W., Suite 3100

("/ Atlanta, GA 30303

/ DESIGNATED ORIGINAL ErtifiedBy b

~

B301270018 830110 =

PDR ADOCK 05000302 K PDR ,26g98 3 General Office 3201 TNrty fourth street souin . P.O. Box 14042. St. Petersburg. Florda 33733 813-866 515?