ML20066C626

From kanterella
Jump to navigation Jump to search
Forwards Util to NRC Re Number of Possible Shipments of Oconee & McGuire Spent Fuel to Catawba.Related Correspondence
ML20066C626
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/08/1982
From: Mcgarry J
DEBEVOISE & LIBERMAN, DUKE POWER CO.
To: Callihan A, Foster R, Kelley J
Atomic Safety and Licensing Board Panel
References
NUDOCS 8211100184
Download: ML20066C626 (2)


Text

( , r~=

gELATED COBpEWOW law orrects or 00lKETED DEBEVOISE & LIBERMAN 8200 $CVENTCENTH STRCCT,N.W.

a WAS HINGTON. D. C. 20036 Tct PHONE (202) 857-9800 LFFi; ci 5E vRiiAR y DOCHEimG & SERvlCE BRANCH

. November 8, 1982 James L.. Kelley, Chairman !TMU NUMBER ..^

Atomic Safety and Licensing  ; C I I'Z. F/*C ,[,

Board Panel (j; jf j' U.S. Nuclear Regulatory .

S u 7/

Commission Dr. Richard F. Foster Washington, D.C. 20555 P.O. Box 4263

  • Sunriver, Orggon '

97702 Dr. A. Dixon Callihan Union Carbide Corporation P.O. Box Y Oak Ridge, Tennessee 37830 Gentlemen:

ki Attached please firid a copy of Applicants November 2, 1982 letter to NRC Staff concerning the number of possible shipments of Oconee and McGuire spent fuel to Catawba. This letter serves as an attachment to Applicants' pleading of November 5, 1982.

Respec fully submitt ,

. Michael McGarry, III Enclosure cc: All Parties T211100184 821108 A

PDR ADOCK 05000413 O PDR LJ}

<=*

DUEn Powza GoweAxy e.o.nox acnae

  • * 'v7TW., MA1.28243..

vg.3,sessang '

HALh. TUCKER (704)373-433 me - November 2, 1981

-= = .

4 Mr. Harold R. Denton, Director-

+ ,

Office of Nuclear Reactor Regulation .

U. S. Nuclear Regulatory Coacaission: l Washington.. Di C. 20555 ~j Attention: Ms. E. C. Adensam, Chief Licensing Branch No.. &- .

Re: Catawba Suelear Station Docker Nass 50-413 and 50-414 Deer Mr. Denton: '

+-

Mr. W. O. Parker, Jr.'s letter of. April 2',1982 responded to questions posed ~f in Ms. E_ C. *Aw='s letter of March 8,1982, concerning the possible storage In

'- -y .

of spent. fuel, from oconee and McGuire at the Catauba Nuclear station. -

w response to question 3a, Duke;inMcared that a possible marf== number cf v '

shipments.cf. spent fuel. assemblies from Oconea and McGuire to Catawba vould .--

be 300 per station per year.. However, to clarify the situation, it is Duke's- e --

intention- that any. such- shipments srill be made so that their environmental impacts will be scw assed within the values contained in Table S-4 (10 CFR.' =

Part 51).. Thus, if a decision. is.nada to ship cpent fuel. from oconee or -:

l McGuire...or both, to Catawba, no.zate 'than 60 suche shipnents per year will -- .

be nade from each reactor, for a possible maxima total of 300 ship:sents per -

y:=r from both Oconee and McCutre. This is consistent with the. assumptions used in WASIL-1233 " Environmental Survey of Transportation of Radioactive Materials.to and from Nuclear Power Plants".

Very truly yours, ,

4 i

Bal B. TucEer IN0/php -c m cc: Mr. James P. O'Reilly, Regional Ad=inistrator.

U. S. NucIcar Regulatory thrf ssion ,

' Region 11

' 101 Marietta Street, Suite 3100 .

Atlanta, Georgia 30303 Mr. P. K. Van Doorn --

URC Resident Inspector Catouba nucicar Station n.

l l

O gru"

- - - - _ _ _ . - _ .___. . . _ - , . _ _ _ _ _ - _ _