PY-CEI-NRR-1228, Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790)

From kanterella
(Redirected from ML20065R552)
Jump to navigation Jump to search
Forwards Rev 0 to Core Operating Limits Rept for Perry Nuclear Power Plant,Unit 1 Cycle 3 (Reload 2). Nonproprietary 23A6492,Rev 0 & Proprietary 23A6492AA,Rev 0, Suppl 1 Also Encl.Proprietary Rept Withheld (10CFR2.790)
ML20065R552
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/14/1990
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310D014 List:
References
PY-CEI-NRR-1228, NUDOCS 9012190087
Download: ML20065R552 (2)


Text

. _ _ _ _ _ _ _ _ _ _ _. _____-

1 CENTERCOR ENERGY PERRY NUCLEAR POWER PLANT Mail Acress-10 CENTER ROAD P O BCX 97 Michael D. Lyster PERRY OHIO 4061 PERRY, OHIO 4051 0:e Prescent Ncear W6)259 3737 December 14, 1990 PY-CEI/NRR-1228 L U.S. !!uclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Core Operating Limits Report Submitt_a_1 (Cycle 3)

Gentlement This letter provides the Core Operating Limits Report (COLR) for Unit 1 of the Perry Nuclear Power Plant (PNPP) for the upcoming fuel cycle. These limits are exactly the same as those formerly contained within the PNPP Unit 1 Technical Specifications for the past cycle, with the addition of the two new Maximum Average Planar Linear lleat Generation Rate (MAPLHGR) curves for the fuel being added. Due to our undoratanding that the Utility Radiological Safety Board of Ohio (URSB) is interested in this subject we are also sending a copy of this submittal to the URSB.

Attachment 1 is a copy of the Core Operating Limits Report for Cycle 3. Also, please note that the reactor core monitoring computer sof tware has been adjusted to account for the effects of channel box bow.

Enclosure 1 provides the Supplemental Reload Licensing Submittal for the Perry Nuclear Power Plant Unit 1 (23A6492 Rev. 0) Reload 2, Cycle 3 which provides a description of the core and summarizes the results of the transient and accident analyses for the upcoming cycle.

[f I h CK P

87 901214 0500o44o PDR Operonnguntts:

Cleveano tiectnc lituminahng loiedo Edison g/

s .*

$fl

USNRC December 14, 1990 PY-CE1/NRR-1228 L Enclosure 2 provides Supplement 1 (23A6492AA Rev. 0) to the above Suppicmental Reload Licensing Submittal, which contains fuel bundle descriptions and the MAPLilGR's for the new fuel to be loaded into the core for the upcoming cycle.

This information is considered by General Electric (GE) Company to be proprietary information. Pursuant to 10 CFR 2.790 it is requested that the information contained in Enclosure 2 be withheld from public disclosure. An affidavit from CE is attached to this letter as required by 10 CFR 2.790(b)(1).

If you have any questions, please feel free to call.

Sincerely.

-y Wh bmu Michael D. Lyster 4 MDL: RAL: nj c Attachment / Enclosures Enclosure 2 contains 10 CFR 2.790 material to be withheld from public ect NRR Project Manager disclosure. Upon separation of NRC Resident Office Enclosure 2, this letter and it's USNRC Region III attachments are decontrolled.

State of Ohio URSB

- - - - . . . - .. . , . _ - . -