Weekly Info Rept for Wk Ending 821015
ML20058N456
Person / Time
Issue date: 10/21/1982
From: Rehm T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20058M131 List:
References
FOIA-92-436 SECY-82-426, WIR-821015, NUDOCS 9310150056
Download: ML20058N456 (37)


Text

-s <

p w,-

a.-

?

g UNITED STATES NUCLEAR REGULATORY COMMISSION WASHIN GTON, D. C. 20555 INFORMATION ' REPORT October 21. 1982 SEcr-82-426 For:

The Cotk;issioners From:

T. A. Rehm, Assistant for Operations, Office of the EDO

Subject:

WEEKLY INFORMATION REPORT - WEEK ENDING OCTOBER 15, 1982 A sumary of key events is included as a convenience to those Comissioners who may prefer a condensed version of this report.

Enclosure Contents Administration A

Nuclear Reactor Regulation B

Nuclear Material Safety and Safeguards C

Inspection and Enforcement D

Nuclear Regulatory Research E

l F*

Executive Legal Director International Programs G

H j

State Programs Resource Management I

Analysis and Evaluation of Operational Data J'

Small & Disadvantaged Business Utilization & Civil Rights K*

Regional Offices L*

CRGR Monthly Report M*

Executive Director for Operations N

Items Addressed by the Comission 0

P Meeting Notices i

  • No input this week.

l DISTRIBUTION:

l Cc:=nissicners OGC T. A. Rehm, a nt for Operations CPI Office of the Executive Director C

ACRs SECY for Operations (Lb (jLUJ4 - lN FOR INTERNAL '!Rr

Contact:

9310150056 930218 DISTRIBUTION Of" Y T. A. Rehm, EC0 PDR FOIA f fh c}

'I

--r.

" M~0-GILINSK92-436 PDR t

t k

_M D -4 D'4 to.31 d_

HIGHLIGHTS OF WEEKLY INFORMATION REPORT j

Ueek Ending October 15, 1982 EDO Rule Accroval On October 13, the EDO approved a proposed rule which would amend 10 CFR Parts 30, 40, and 70 concerning licensee actions required if a license is to be terminated.

LaSalle, Unit 1 The licensee infonned NRR that the final report on the independent review of heating, ventilating, and air conditioning will be available on about October 22, 1982. Although the review has taken somewhat longer than originally estimated, it is not expected that plant operations will be significantly impacted.

i Oconee, Unit 3 l

On October 10 the plant was removed from service for a steam generator (SG) tube leak. A 12-day outage is planned to repair the tube and complete maintenance.

Pilerim. Unit 1 On October 12 the plant (while in cold shutdown) experienced a loss of both 345 KV offsite power sources apparently due to salt spray in the air causing insulator flashing in the switchyard. Later that day power supplies were restored.

Monticello Additional cracks have been confirmed that range in depth to about 6 to 12", of wall thickness. The licensee plans to show by analysis that the plant can safely start up and have the cracks repaired at the next outage.

Brunswick, Unit 1 A safety relief valve failed to reclose after reactor testing. The reactor was manually scrammed and the unit placed in cold shutdown. Inspection revealed that the pneumatic supply solenoid plunger spring failed. The licensee will replace all plunger springs with an improved version prior to restart.

Babcock & Wilcox B&W has announced that all low-enriched uranium powder production at its Apollo, Pennsylvania plant will cease at the end of March 1983, and that the plant will te shut down. Long-term contracts will be filled by General Electric.

Order for License Revocation l

IE issued an order revoking the license for Midstate Testing Laboratory, Inc.

l because of the licensee's failure to answer allegations that the licensee acanconed its radiographic facility and licensed material.

~MI Unit 1 Cn Novemoer 9 a public meeting will be held to discuss the potential restart.

I I

h i'

l OFFICE OF ADMINISTRATION

(

Week Ending October 15, 1982 ADMINISTRATION OF THE FREEDOM OF INFORMATION ACT STATUS OF REQUESTS 1

l Initial Appeal of I

Request Initial Dec'sion Received 516 23 Grantea 368 1

l l

Denied 72 21 l

l Pending 76 1

l t

ACTIONS THIS WEEK Received j

Rod Buckles Requests a copy of a February 1981 internal staff report -

(82-478) recommending acceptance of the ' leak before break' criteria concept.

Bill Hafner Requests all documents pertaining to Suppression Pool l

(82-479) temperature for the Shcreham Unit 1 Nuclear Plant from l

August 30, 1977 to December 1,1977.

j Susan L. Hiatt, Requests all documents made available to Stephen G.

OCRE Representative Sawicki under FOIA-82-397; a list of the documents (82-480) made available to Richard B. Hubbard under F01A-32-305; I

all documents pertaining to any possible or actual differences. in the design or construction of Units 1 and 2 of the Perry Nuclear Power Plant; and all documents regarding a meeting between the Deputy Director DEP and Deputy Director, EDO and the l

Assistant Secretary for Health relating to HHS' liaison during an emergency and the use of potassium iodide.

l l

Susan L. Hiatt, Requests all documents concerning the Comission's

)

OCRE Representative July 16,1982 Policy Statement concerning the (82 481)

' applicability of Pane v. NRC (psychological stress) to proceedings other than TMI-1 restart; all documents I

concerning the resignation of Judge Louis J. Carter from the Indian Point ASLB; all documents concerning any possible or existing wiretapping and/or phone tapping and/or tape recording of conversations of any persons in the NRC; all documents since January 1, 1981 originating with or directed toward the Commission, appeal boards, licensing boards, or administrative Judges Executive Legal Director or Executive Director for Operations concerning the general conduct of licensing proceedings; and all documents between President Reagan (or anyone on his behalf) or any member of the White House staff and the NRC.

CONTACT:

J. M. Felton 492-7211 ENCLOSURE A CCT 151952 i

(

l I

l 2

i Received, Cont'd Ronald Canfield, Requests a list of all Nuclear Engineers and Reactor Search and Recruit Operators certified by the NRC.

International (82-482)

Martin Levy, Requests sanitized Performance Appraisals for all l

NTEU Chief Steward individuals in the Operating FacilitiesSection I of l

(82-483) the Uranium Recovery Licensing Branch.

Kimberly Armstrong Newman, Requests copies of SECY-82-377, " Hearing Requests on j

Debevoise & Liberman Extension of Construction Completion Dates for (82-484)

Washington Public Power Supply Systems Nuclear Projects Nos. I and 2", and SECY-82-377A, " Minor Revisions to SECY-82-377."

Stephan T. Jarrett, Requests a copy of the winning proposal for NRC-25-82-318 Washington Access

" Keypunch and Verification Services "

(82-485) j (NRC employee)

Requests all documents regarding an Unfair Labor (82-486)

Practice Charge.

(NRC employee)

Requests all documents regarding a Conflict of Interest.

(82-487)

Jacob H. Kurkchee Requests a copy of NUREG-0909, NUREG-0916 and " Steam (82-488)

Generator Evaluation, Ginna Steam Generator Tube i

l Failure Incident," January 25, 1982 issued by-l Rochester Gas & Electric on April 26, 1982.

I Granted I

Bill Hafner In response to a request for documents relating to BWR (82-393) design deficiencies, made available 32 documents.

Informed the requester six additional documents subject to this request are available through the Government Printing Office Sales Program and one additional document is already available at the PDR.

Lynn Connor, In response to a request for all documents pertaining Doc-Search Associates to pre-implementation review of NUREG-0737 Item II.F.2.,

(82-411) made available 17 documents.

Infomed the requester additional documents subject to this request are already available at the PDR.

ENCLOSURE A f

'.;T 1 5 E 2 I

3 Granted, Cont'd l

Bruce D. Black, In response to a request for reports filed concerning Attorney-At-Law misadministration of radioactive lodine or any other (82-442) radioisotope in the treatment of cancer of the prostate, made available seven documents. Informed the requester additional documents subject to this request are already available at the PDR.

(NRC employee)

In response to a request for a copy of the NRC's 1982 (82-453)

Affirmative Action Plan, made available a copy of the requested record.

Sandra Ramirez In response to a request for infomation on the NRC, t

(82-476) made available two documents.

Denied (NRC employee)

In response to a request for infomation on Vacancy (82-373)

Announcement No. 82-1769, made available four documents. Denied two documents in their entirety and portions of four documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Denied two additional documents in their entirety containing predecisional advice, opinions, and recommendations of the Panel Members.

(NRC employee)

In response to a request for documents regarding (82-401)

Yacancy Announcement No. 82-2123, made available four documents. Denied six documents in their entirety and portions of seven documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

l (NRC employee)

In response to a request for documents regarding l

(82-407)

Vacancy Announcement No. SES-63, made available i

11 documents. Denied four documents in their

]

entirety and portions of 10 documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

Robert R. Belair, In response to an APPEAL TO THE COMMISSION for Kirkpatrick, Lockhart, documents which the Commission has ' focused on the Hill, Christopner risks associated with' fuel loading and low power

& Phillips operation and those in which the Commission has (82-A-19-82-308)

' chosen a level of emergency preparedness appropriate to assure the health and safety of the public* for fuel loading and low power operation, made available two additional documents. Informed the requester 20 other documents are already available at the PDR.

Denied one SECY paper and continued to deny three documents in their entirety, the release of which would inhibit open and frank discussion between the Commission and its staff in the future.

OCT 151552 ENCLOSURE A 1

i l-DIVISION OF SECURITY ITEMS OF INTEREST t

Week Ending October 15, 1982 1

U.S.-Canadian Agreement 1

i SEC is working with IP and ELD to develop an agreement between the U.S. and l

Canadian governments, to exchange classified nuclear-related information of 1

mutual interest.

i 4

TMI Restart Hearings

~

SEC is providing security support advice and assistance in preparation for the i

TMI Restart Hearings scheduled for next month, i

l John Abbotts v. NRC (D.D.C. No.77-624)

{

SEC issued another Supplemental Affidavit justifying the withholding of classified baseline threat information from public disclosure.

i l

i i

1 I

a 1

il l

ENCLOSURE A CCT 1515E2 1

I

4 WEEKLY INFORMATION REPORT DIVISION OF CONTRACTS WEEK ENDING OCTOBER 15, 1982 CONTRACTS CLOSED-00T NRC-10-82 401 Aspects Incorporated 10/6/82 i

NRC-05-79-260 General Electric 10/7/82 AR(49-24)-0308 Harza Engineering Co.

10/12/82 NRC-02-81 -061 Geotechnical Engineers Inc.

10/12/B2 AT(49-24)-0057 Harza Engineering Co.

10/13/82 i

r ENCLOSURE A DCT 151332 1

i 1

I l

f DIVISION OT ORGANIZATION AND PERSONNEL l

ITEMS OF INTEREST k'eek Ending October 15, 1982 l

Moving Headquarters Staff to Regions:

l On June 29, Regional Administrators were constrained on outside hiring when NRC Headquarters employees are well qualified and available. The same date, Headquarters employees were invited l

to register their interest in Regional jobs with the Division i

of O&P.

Since then, Regional Administrators have announced 18 selections of Headquarters employees, as follows-Region I

- 9 selections Region II

- 4 selections Region III - 2 selections Region IV

- 2 selections Region V 1 selection l

l 18 A total of 173 Headquarters staff members remain on the register of individuals interested in Regional assignments.

1 I

I l

l 1

l l

l DCT 1 5 1552 ENCLOS'JRE A I

OFFICE OF ADMINISTRATION DIVISION OF RULES AND RECORDS Weekly Information Report NRC Regulatory Agenda The Office of Acainistration has sent for publication in the Federal Register a notice announcing the availability of Vol.1, no.3 of the NRC Regulatory Agenda. The Agenda is a quarterly summary of NRC rules and Petitions for rulemaking and covers the period July 1 through September 17, 1982. The Agenda is divided into two sections.Section I, " Rules" will be published in the Federal Register as a part of the OMB Unified Federal Agenda.

Copies of the Regulatory Agenda (NUREG - 0936) Vol.1, no.3 are available from the NRC/GPO Sales Program, Division of Technical Information and Document Control, U.S. Nuclear Regulatory Commission, Washington, D.C.

2C55E 1

ENCLOSURE A OCT 151562 l

OFFICE OF NUCLEAR REACTOR REGULATION ITEMS OF INTEREST Week Ending October 15, 1982 LaSalle County Stat' ion, Unit 1 The licensee has orally informed the Project Manager that the final report on the LaSalle Unit 1 independent review of the heating, vent'11ating, and air conditioning will be available to the NRC and the licensee on about October 22, 1982. The licensee's original target date was September 15, 1982. An interim report was filed with the Commission dated September 15, 1982.

I I

Although this HVAC independent review is taking somewhat longer than ori-ginally estimated, the increased time is not expected to significantly impact plant operations. To date, the plant has not operated above 25" j

power.

Oconee Nuclear Station, L' it No. 3 Ocenee 3 was removed from service on October 10,1982 at 2200 for a steam generator (SG) tube leak. The leak developed in the 3A SG and increased to 0.035 gpm at the time f shutdown. A 12-day outage is planned to repair the leaking SG tute and complete other maintenance activities, pilerim 1 At approximately 2:15 a.m. on October 12, 1982, Pilgrim Station experienced a loss of both 345 KV offsite power sources. At the time, the unit was in cold shutdown utilizing ore residual heat removal system pump for shutdown cooling.

Both onsite diesel generators started and picked up loads normally. In addition to the diesels, a 24 KV offsite supply (redundant to one of the diesels) was available if needed.

The licensee has attributed this loss of offsite power, in large part, to salt spray in the air (arising from rough seas and high winds) causing l

insulator flashing in the switchyard. The offsite grid was otherwise l

unaffected by this occurrence. The 345 KV offsite power supplies were restored at approximately 10:30 F.m. the same day.

Monticelle Nuclear Generatine plant Additional cracks have been confirmed by radiograph at the Monticello Nuclear Generating pl a nt.

The previous cracks were found at the end cap of the jet t

pump header. The three new cracks are located in the jet pump riser piping ar.d safe ends. The riser piping is 304 stainless steel,12 inches in DCT '. 5 1952

.NCLOSURE B t

e l diameter, and about 7/8-inch thick. The cracks range in depth to about 6 to 12t of wall thickness, perpendicular to the weld (heat affected zcne),'

and are about 1/2-inch in length. Northern States Power Company is pre-sently investigating preliminary ultrasonic indications of two additio.nal cracks which will be confirmed by radiograph-bringing the potential total up to seven cracks.

Northern States Power Company plans on taking the following action:

1.

Placing a weld overlay over the end cap cracks.

2.

No special action to repair the riser cracks.

t 3.

Showing by analysis (for all cracks) that Monticello can safely start up and repair the cracks at the next outage.

Suscuehanna Unit 1 Pennsylvania Power & Light Company (PP&L) met with the NRR staff on October 8, 1952 to discuss the results of its evaluation of 20 additional installed pipe hangers required as part of the resolution of the Susquehanna Unit 1 Indepen-dent Design Verification Program (IDVP) for the Susquehanna, Unit 1.

PP&L stated that four of the 20 hangers required reanalysis. Those reanalyses indicated that three hangers met design requirements without a reduction in safety margin. Preliminary results on the fourth hanger indicated failure under worst case loading conditions, i

PP&L plans to expand the pipe hanger analyses further and provide a letter report to the staff by Friday, October 15, 1982.

Brunswick Steem Electric Plant, Unit No. 1 A two-stage Target Rock safety relief valve failed to reclose after testing with the reactor critical at 200 lbs pressure. The reactor was manually scrammed and the unit placed in cold shutdown. Subsequent inspection re-vealed that the pneumatic supply solenoid plunger spring failed; thus keep-ing the valve in the open position. The licensee was previously aware of i

l this potential failure mode and had an improved version of the plunger spring onsite, ready for replacement. The licensee will replace all plunger springs with the improved version prior to restart.

ENCLOSURE B OCT 1 5 1552 9

i 5

NRC Titi PROGRAM OFFICE WEEKLY STATUS REPORT October 9,1982 - Octobei 16, 1982 Plant Status Core Cooling Mode: Heat transfer from the reactor coolant system (RCS) to reactor building ambient.

- Available Core Cooling Modes: Mini Decay Heat Removal (MDHR) system.

RCS Pressure Control Mode: RCS is vented to the reactor building.

Major Parameters (as of 0600, October 15, 1982) (approximate values)

Average Incore Thermocouples*:

110*F Maximum Incore Thermocouple *:

127'F RCS Loop Temperatures:

A B

Hot Leg **

93*F 91*F Cold Leg (1) 75'F 76*F (2) 77'F 77'F Pressure: The reactor coolant system is vented to the reactor building.

i Reactor Builcing: Temperature:

70*F Pressure:

-0.20 psig Airborne Radionuclide Concentrations:

3 6.4 E-7 uCi/cc H (sample taken 10/13/82) 2.5 E-9 uti/cc perticulates (sample taken 10/14/E2)

Kr"5 concentrations are below the A

lower limit of detection (LLD):

6.2 E-6 uCi/cc 1.

Effluent and Environmental (Radiological) Information Licuic effluents from the inI site released to the Suscuehanna River a' e crecessirg, we-e mace i.'tnin tne regulatcry limits ar.c in 5:::<:t :e

't-

':: rece e e-ts a-c City cf _ rcaster cgreere Durir.; :ne perioc Octcber 7,19E2, through October 14, 1982, the effluents contained no cetectable radioactivity at the discharge point and individual effluent sources, which originated within Unit 2, contained no detectable radioactivity.

' Uncertainties exist as to the exact location and accuracy cf these readings.

    • Tne primary water level is below the hot leg temoerature sensors.

)

l 00T 151552 ENCLOSURE B 1

2 2.

Environmental Protection Acency (EPA) Environmental Data The EPA measured Kr-85 concentrations at several environmental monitoring stations and reported the following results:

l Location September 10, 1982 - September 24, 1982 3

(pCi/m )

Goldsboro 21 Middletown 21 Yorkhaven 22 TMI Observation Center 24 The EPA Middletown Office has not received the environmental Kr-85 i

for the samples which were taken subsequent to September 24, 1982, J

from the EPA's Counting Laboratory at Las Vegas, Nevada. These i

results will be includec in a subsequent report.

j No radiation above normally occurring background levels was detected in any of the samples collected f rom the EPA's air and gamma rate networks during the perico from October 6, 1982 through October 14, 1982.

i 3.

NRC Environrental Data f

Results from NRC monitoring of the environment around the TMI site were as follows:

The following are the NRC air sample analytical results for the onsite centinuous air sampler:

1-131 Cs-137 Samole Period (uCi/cc)

(uCi/cc)

HP-34 Cc:ccer 6 - October 13, 1982

<6.8 E-14

<6.8 E-14 l

4 Licensee Radicattive Material and Radweste Shioments 1

On Octooer S, 1952, 79 drums containing contaminated laundry from Jr':s 1 are 2 were shi;;ec to Interstate Unifor-Services, New l

l e-sdr;;;r, Perrs/ vania.

Cn October 8,1982, two Unit 2 reactor coolant samples were shipped to the Babcock and Wilcox Lynchburg Research Center, Lynchburg, Vi rgini a.

On October 11,19E2, two Unit 1 solidified evaporator bottoms were shipped to U.S. Ecology (Hanford Burial Site) Richland, Washington.

On October 12, 1982, two Unit 2 25-m1 reactor coolant bleed tank "A" liquid samples were se'; ped to Westinghouse Hanford Company, Richlanc, Washingten.

CCT 1 5 1552 ENCLOSURE B i

i h

3 On October 13, 1982, two Unit 1 solidified evaporator bottoms were shipped to U.S. Ecology, Richland, Was;.ington.

On October 14, 1982, one Unit 1 solidified evaporator bottom, and nine Unit 1 and three Unit 2 LSA waste containers were shipped to U.S. Ecology, Richland, Washington.

On October 15, 1982, 77 drums containing contaminated laundry from Units 1 and 2 were' shipped to Interstate Uniform Services, New Kensington, Pennsylvania.

Ma.ior Activities Submerged Demineralizer System (SDS). SDS completed processing Batch 1.

No. 37 (approx;mately 5,000 gallons of miscellaneous letdown water) on October 7,1952 and is presently in standby status.

2.

EPICOR II. The EPICOR 11 system is presently in standby status.

3.

Reactor Euilcine Entries. Four reatter building entries were conducted cur nc :ne week of October 10, 1982. (peactor builcing entries are

y:icilly schecuied en Monday, Wednescay, and Fridey with makeup entries er inurscay.)

i Tne ongoing flushing of reactor building interior surfaces has added approximately 60,000 gallons of processed water to the reactor building Thirty thousand gallons of this water have been subsequently sump.

transferred to the SDS feed tanks for reprocessing. Flushing of the reactor builoing come has been completed. The current decontamination effort is fccused en remote spraying below the 305 ft. elevation and a manual deccntamination of tne polar crane.

l In corjunction with these decontaminaticn activities, the closed Circuit television ins;ection of the 282 ft. elevation has continued. A prominent " dirt ring" approximately one foot wice was visible on vertical surfaces. The elevation of the "cirt ring" appears to correspond to the elevation of the reactor building high water level (291 ft.).

An examir.ation cf the 222 ft. ficor surfaces was masked by aporoxtrately

' cur inches of water wnich accumulated in the reactor building basement fr:r teccata 9 et cn activities. Tne water a;oea ed relatively clear, L: its :s: - cis::r:ed tre.iev. cf tne fi::r tur# ace. An irstectier c' tr.e re aticr ccc'.ar. crain tant cubitle,r.nitn inciotec an irs;ection cf the rupture cisk discharge pipe, did not identify any component damage.

In addition to cecontamination, the following reactor building activities are scheduled for the remainder of October:

A second attempt to uncouple the three leadscrews still coupled to tneir control rod spicer assemblies, Temporary power installation to the polar crane, and l

pre::aration of work packages for testing the polar crane motors.

3CT 1 5 1532 ENCLOSURE S I

4 4

EDICCE II Prefilter Shioment Status. The EPICOR II PF-2 liner, which was snippec f rom iM; on Oc:coer 7, i9E2, arrived safely at the Idaho National Encineering Laboratory (INEL) on October 12, No prefilter shipments were mace this week because of delays in cask availability. Two EPICOR 11 shipments are scheduled next week: PF-7 on October 20 and PF-8 on Octecer 21, 1982. This schedule is predicated on having a HN-200 cask

~

availtble from Hittman Nuclear and a CNS-8-120 cask returned from INEL.

5.

TMI Aerial Radiolegical Survey.' The aerial radiological survey of the inree Miie Islanc area nas teen tentatively scheduled to begin on October 20, 1952. Attachment 1 is the October 14, 1982 NRC press release that cescribes the survey.

Fu ure Peetirp 1.

On Cciccer 29,19E2, Lake H. Ba,rrett will meet with Friends and Family of TMI to ciscuss varicus TMI-2 issues.

2.

On f.cvercer 9,1982, the NEC Ccmmissioners will hold a public meetina to ciscuss tne potential restert of TMI Unit No. 1.

Further details

~

regarding location and local centact for public statements will be inclucec in a press releases wnen ney beceme availaole.

3.

On Ncvember 17, 1982, the Advisory Panel for the decontamination of TMI Unit 2 will hcid a meeting --open for public observation-- to discuss the current status of cleanup efforts and the disposition of processed water.

Tne meetir.; will take place at the Holiday Inn, 23 South Second Street, Harriscurg, Pennsylvania, from 7:00 to 10:00 PM.

l 02I 1 5 1992 ENCLOSURE E

ATTACHMENT 1 1

UNITED STATES-f.""%

I'

'\\-

NUCLEAR REGULATORY COMMISSION e,

".. z Nd OFFICE OF PUBLIC AF. FAIR!LREGION t

  • , mx #.!.

631 Park Avenue, King of Pruuia, Pa.19405

,,%,...,+

October 14, 1982 l

l l

AIRCRAFT TO PEFJORM BACKGROUND RADIATION SURVEY f

l AROUND THREE MILE ISLAND NUCLEAR PIANT IN PENNSYLVANIA A blue and white helicopter will fly a routine radiological background Icv altitudes over a 25 square-mile area surrounding the Three

~

survey at Mile : eland Nuclear Prwer Plant near Goldsboro, Pennsylvania, beginning cheut october 20, 1952, and ending about 10 days to two weeks later.

l The U S. Department of Energy (DOE) will perform the survey as part l

of a' cooperative ef fort with the Nuclear Regulatory Con =ission (NRC) to l

c:nduct an ongoing research and environmental radiation monitoring program.

l The Dor has conducted similar surveys around many f acilities in the United states for more than 20 years.

The last such survey of the Three Mile 1

Island area was done in 1976.

f rom the firm's Washington, D.C., Aerial..easure-

--.g

- ew en-[s $p~ erat.cbs~Of fice will operate the DOE-owned helicopter.the natural te The cre3*

C:

I 1

.nc the Thr'ee Mile Island Nuclear Power Plant.

The helicepter will fly during the day at an altitude of 150 fset.

Flight schedules will depend on weather conditions.

All flights vill be

--- -ad with the Federal Aviation Administration.

4 ENCLOSURE B OCT 1 5 5E2 i

f

i 1

i 0FFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest f

Week Endino October 15, 1982 l

Babcock & Wilcox, Apollo, Pennsylvania

]

Babcock & Wilcox has announced that all low-enriched uranium powder produc-tion at its Apollo Pennsylvania plant will cease at the end of March,1983, j

and that the plant will be shutdown. Long-term B&W contracts will be filled

)

using low-enriched uranium powder supplied by General Electric. About 200 employees at the Apollo plant will be affected.

l l

l l

1 1

l OCT 1 5 1552 ENCLOSURE C l

l

i 0FFICE OF INSPECTION AND ENFORCEMENT Items of Interest Week Ending October 15, 1982 1.

The following Significant Enforcement Actions were taken during the past week:

\\

EN 8147A, American Electric Power Service Corporation, Indiana and a.

Michigan Power Company (Donald C. Cook Nuclear Plants - Units 1 & 2) -

An Order Imposing Civil Monetary Penalty in the amount of $52,000 was issued on October 14, 1982. The action was based upon several violations relating to the licensee's failure to implement its fire protection program and maintain containment integrity.

l D.

EN-82-21 A, Duke Power Company (Oconee Unit 1) - An Order Imposing Civil l

Monetary Penalty in the amount of $44,000 was issued on October 12, 1982.

l The action is based upon a violation concerning the failure to ensure that procecures affecting safe operation of the facil-ity were meticulously followed resulting in the failure te maintain containment integrity as required by Technical Specifications.

t EN-E2-26A, Midstate Testing Laboratory, Inc. (Hammond, IN) - An Order Revok-c.

ing License No.13-11E22-01 was issued on October 14, 1982.

The action was based upon the licensee's failure to file an answer to EN 82-26 dated July 22, 1982 alleging the licensee's apparent abandonment of its raciographic facility and its licensed material.

2.

The following Preliminary Notifications were issued during the past week:

i a.

PNS-I-E2-12, Nuclear Assurance Corporation ( Atlanta, GA) - Spent Fuel j

Shipment.

b.

PNO-II-82-107, Florida Power and Light Company (Turkey Point Unit 4) -

Extenced Maintenance Outage.

c.

PND-II-82-108, Duke Power Company (Cconee Unit 3) - Shutdown Exceeding 48 Hours.

d.

PNO-II-E2-109, Carolina Power and Light Company (Brunswick Unit 2) - Shut-down in Excess of 48 Hours.

e.

NO -II-EE-110, Carolina Power and Lignt Company (Brunswick Unit 1) - Failure of Relief Valve to Reclose.

f.

PNO-11-E2-111, Duke Power Company (Oconee Units 1, 2, and 31 - Pressurizer Code Safety valve Problem.

g.

FNO-III-E2-109, ADE Technology Corporation (Harwood Heights, Ill - Possible Loss of U. 5. Arty Infinity Aiming Collimator, Containing 10 Curies of Gaseous Tritium FND-1:I-EE-110, Short-Elliot-Hencrickson, Inc. (Chippewa Falls, WI) -

n.

Reported ineft of Troxler Density Gauge.

i.

rNO-III-82-111, Cincinnati Gas & Electric (Zimmer Nuclear Power Station 1 -

stop Work Order.

j.

ONO-IV-22-36, Exam Cemoany (Tulsa, OK) - Overexposure of Two Padiographers.

k.

oNO-IV-E2-37, Oublic Service Company of Colorado (Fort St. Vrain) - Unplanned

eiease of Radicactive Gases.
NC- - E2 41, Sou nern Caloreis Edison Corcery (San Oncfre ?.uclear serecat:r.; Station Units 213) - Mecia Interes* 4r. Welcing ~~. legations.

OCT 151:-E2 ENCLOSURE D I

l l

i 3.

The following IE Bulletin was issued this past week:

IE Bulletin #82-03, Stress Corrosion Cracking in Thick-Wall, large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants was issued on i

October 14, 1982 to certain licensees operating boiling water reactors.

Information copies were provided to other licensees ar.d holders of construction l

permits.

I 4

Other Items i

a.

Office of the Director The Deputy Director, IE, and staff from the Division of Emergency Preparedness, observed the emergency preparedness exercise at the Prairie Island facility and participated in the critique of the exercise on October 13-15, 1982.

b.

Division of Reactor Procrams

i. Division staff visited Region I, October 14-15, 1982 to prepare to accompany INFO on the INPO eval'ation of Oyster Creek. Division u

staff will observe the INPO evaluation at Oyster Creek October 25 -

November 4, 1982.

ii. On October 12, 1982, the construction appraisal team (CAT) returned l

to the TVA Bellefonte Site in Scottsboro, Alabama for the final i

phase of the inspection. The team will be onsite October 12-22, 1982.

c.

Division of Fuel Facilities, Materials, and Safeguards

i. The Director, Division of FFMS, visited Region V this week to discuss the materials inspection program and accompanied Region V inspectors on inspections at materials licensees.

ii. Division staff visisted Region III October 13-14, 1982 to discuss the instructions for the Drug Abuse Program and to provide training to inspection staff for carrying out the program, j

d.

Division of Emercency Precaredness The Director, Division, EP, will attend and participate in the annual meeting of the National Organization of Test, Research, and Training Reactors in College Station Texas, October 18-20, 1982.

OCT15 agg ENCLOSURE D I

OFFICE OF NUCLEAR REGULATORY RESEARCH Items of Interest l

Week Ending October 15, 1982 Publication Issued During the Week of October 11-15, 1982 Reg. Guide 3.8. Rev. 2: " Preparation of Environmental Reports for Uranium' Mills".

i i

2 ENCLOSURE E 00T 1 5 15!2 I

i ITEMS OF INTEREST OFFICE OF IhiERNATIONAL PROGRAMS t

WEEK ENDlhG OCTOBER 15, 1982 Foreign Visits to NRC On Tuesday Mr. L. G. Williams, Principal Inspector of the UK Nuclear Installations Inspectorate (NII), met with D. Powers of the NRR Core Performance Branch to discuss fuel behavior during normal operation and in design basis faults.

On Wednesday Mr. Walter Binner of the Austrian Nuclear Research Center met witn RES Director R. 8. Minogue to discuss the LOFT Program.

On Wednesday John G. Collier, Direct.or of the Safety and Reliability Directorate of the United Kingdom's Atomic Energy Authority, met with Commissioners Ahearne and Roberts, EDO Dircks and RES Director Minogue.

Dr. Jonn Gaunt, Atomic Energy Attache at the Britisn Embassy in Wasnington, acconpanied Mr. Collier. J. V. Zimme rma n, I P, al s o participated in the OCM meeting.

On Wecnesday Dr. Cesare Merlini, President of the Italian Institute of International Af f airs, met witn Commissioners Ahearne, Roberts and Asselstine.

J. V. Zimmerman, IP, also participated in the meetings in wnich tne economic and security aspects of nuclear nonproliferation were di scussed.

On Friday Dr. Sergio Finzi, Director for Research and Development in Nuclear Af f airs at the European Communities Commission (C.E.C.),

accompanied by Mr. Albert Scnurenkamper, also from the C.E.C. in Brussels, and Mr. Francois Lafontaine of the Washington Delegation of tne C.E.C. met with Mr. W. J. DircKs, EDO. IP Deputy Director Lafieur also participatec in tne meetings. CEC-NRC Agreements were discussed as well as the status of researcn ar.d development operations 1

at NRC.

i l

l i

l l

ENCLOSURE G

......i?;

f

  • Foreign Reports The following foreign reports were received in IP October 12-15:

(For further information contact Eva Szent-Ivany, IP, X24506.)

From France:

DSN No. 559 - Determination of Specific Reference Movements for Nuclear Sites in France l

CEA - Information Notes:

- Dry Storage of Irradiated Fuels

- The Vignola Solar Center A ard of the American Nuclear Society i

From FRG:

1 GRS-A-710 - Vibration Monitoring on Pressurized Water Reactors Under2round Siting of P!uclear Power Plants KfK - Nuclear Energy Lexicon l

From Sweden:

Swedish Energy **

(No.2. 1982)

From Taiwan:

Monthly Operating Report (August 1982) for the Chinshan Nuclear Power Plant Units 1 and 2**

Reportable Occurrence Report (RO-04-06)

(Sent for translation) j From Yugoslavia:

Steam Generator Testing in Krsko Nuclear Power Plant **

l Note: IP received the English translation of the German Risk Study Accendix 2: Deliability Analysis from the Health & Safety Executive - NII, U.K.

1 Deletec from 0n4 copy

    • Inci:stes tre reecris are in Englise DOT 15 522 ENCLOSURE G 1

l l

i

OFFICE OF STATE PROGRAMS ITEMS OF INTEREST WEEK ENDING OCTOBER 15, 1982 TMI-2 Litigation Deveicoment On September 30, 1982 the U. S. District Court for the Southern District of New YorL issued a decision in GPU's 54.01 billion negligence suit against Babcock and Wilcox (B&W). This decision denied B&W's motion for summary judgment against GPU's ordinary negligence claim against B&W. Consequently, the trial of this case will begin on November I, 1982.

Review of New York Program The review of the New York State Health Department radiation control program will be concutted during the week of October 18, 1982.

i l

l l

OCT 1 5 1352 ENCLOSURE H

L

_ OFFICE OF RESOURCE MANAGEf'ENT t

ITEMS OF INTEREST WEEK ENDING OCTOBER 15, 1982 Publication Nuclear Power Plants, Construction Status Report (Yellow Book).

Volume 6, Number 2, data as of June 30, 1982, was distributed.

i I

l i

I l

l 8

l l

l I

E*1CLOSU:.E I

---4 3 3.g I

f 1

I EXECUTIVE DIRECTOR FOR OPERATIONS Items of Interest

eek Ending October 15, 1982 Prc:csed Rule to be Signed by EDO On Octcber 13

, 1982, the Executive Director for Operations approved a proposed rule which would amend 10 CFR Parts 30, 40, and 70.

This rule would amend these carts to recuire, if a licensee decides to terminate a license, that (1) licensee's terminate use of and dispose of nuclear materials, (2) licensees surmit a form cescricing the disposal of nuclear materials, (3) licensees submit I

a final raciation survey report, (4) the licensee submit a plan for decontamina-tion, if residual radicactive contamination is present above levels suitable i

for ur. estricted release, (5) a license continues in effect beyond the license expi c-ion date, if necessary, with respect to possession of residual radioac-tive t ntamination, (6) in cases where residual radioactive contamination is ore 5e't, the licensee DJst control Contaminated areas until decontamination is cc ;iete, and (7) a specific license will be terminated only on written notice frc-ine Cc mission.

Eased on tne information available, the Executive Director for Operations certif'es under the Regulatcry Flexibility Act that the rule will not have signi-fica.i economic 'moset on a substantial number of small entities. However, tecause cf tne wicely cif fering conditions uncer which licensees operate, public ccm ent from small entities is specifically re;uested.

~-is r.ctice ccnst'tutes notice tc the Commission that, in accordance, with t'e *alemar.'n; autnc" ;. cele; ate: to ECO. the EDO has sig.e this proposed ru:s ': ;utlicaticn i-tre Fede-al Fegister.

OCT 151552 ENCLOSURE N 1

._ ~--- _, -

I ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING OCTOBEF, ~ 5,1982 A.

STAFFREOUIREMENTS-STATUSOFSTAFFC{RTIFICATIONOFLICENSEECOMPLIANCE WITri RESTART RECulREMENTS IN TMI-1, 3:i P "., OCTOBER 6.1982, COMMISSIONERS' CONFERENCE ROCM. DC OFFICE (OPEN TO PUBLlUATTENDANCE), Memo SECY for the Re: Orc, 10/12/82 The Cc:=.ission was briefed by staff en the status of the 129 restart certification items applicable to TMI Unit 1 (see SICY-E2-384).

There were no requests made at this :neeti:ig.

OCT 151552 Ex;toSuRE o t

E

--4 Y

NRR MEETING NOTICE 5*

gM@lL'38}

m.

DOCKE T APPLICANT /

I DATE/ TIME NUMBER LOCAll0N PURPOSE ATTENDEES NRR CONTACT 10/18/02 50-537 Landow 1111 Working review meeting on DOE, PMC, TVA R. Stark 8:30 am Bethesda Chapter 6.2 (containment systems)

(Clinch River) 10/18/82 50-327 P-110 Discuss the adequacy of the hydrogen TVA C. Stahle 1:30 gun 50-328 Bethesda mitigation in the Sequoyah facility 10/18-19/82 50-289 P-118 Discuss results of GPU Nuclear's SG FRC, BNL, Ohio State R. Jacobs 9:30 am Bethesda repair qualification program, eddy (TMI-1) 4 current testing program, RCS cleaning i

10/19/82 50-537 MMBB-6507 Working review meeting on the CRBR 00E, PMC, TVA R. Stark 1:00 pm Bethesda Control Room design 10/19/82 50-508 P-110 WNP-3 senior management presents a WNP-3 L. Wheeler d

9:00 am Bethesda project overview. NRC management discusses specific items of interest related to OL review 10/19/82 50-275 P-422 Discuss status of 10VP Phase I and Pact fic Gas & Elec.

H. Schier11ng t

1:00 pm Bethesda

!! Issues Teledyne (Diablo Canyon 1) 10/19/82 STN 50-482 P-114 Discuss matters related to Fire Pro-Union Electric Co.

G. Edison 9:00 am STN 50-483 Bethesda tection for-the Alternate Shutdown Kansas Gas & Elec. Co.

J. Hopkins Panel of Callaway 1 and Wolf Creek 1 SNUPPS Orgmization 10/19-21/82 50-458 Stone & Webster Discuss Mechanical Engineering Br.

Gulf States Utilities Co.

R. Perch l

Cherry Ill11, NJ open items on River Bend Station review se i

O PLEASE BE ADVISED THAT DAILY RECORDINGS CAN BE HEARD ON 492-7166

  • Copies of stenmaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local pubitc doctanent rooms.

1

I c)

O NRR MEETING NOTICES *

("

17.

APPLICANT /

U DOCKET DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 10/19-20/82 50-537 Landow 1111 A working review meeting on 00E, PMC, TVA R. Stark 8:30 am Bethesda Chapter 8 (Power Systems) 10/19-22/02 50-352 Bechtel Power Corp.

Limerick - Structural Engineering Philadelphia Elec. Co.

H. Abelson 9:00 am 50-353 San Francisco, CA Design Audit / Technical Meetir.g 10/20/82 P-118 Discuss ongoing work activities Target Rock Corp.

F. Cherny 9:00 am Bethesda directed at resolving 2-stage BWR SRV set point variability problems 10/21/82 50-329 P-110 Discuss Hidland SER Open item No. 6 Constners Power Co.

R. liernan 8:30 am 50-330 Bethesda regardir.g seismic and dynamic Babcock & Wilcox qualification of equipment Bechtel NUTECH 10/21/82 50-206 San Onofre 1 Site Discuss the soil parameters used Southern California W. Paulson in the San Onofre i seismic Edison Co.

9:00 am reevaluation (SEP Topics 111-6 and 11-4.1) 1G/21/82 50-382 P-114 Waterford Technical Specifications Loulslana Power & Light S. Black B:30 am Bethesda 10/22/82 P-110/P-114 Review progress to date in the Westinghouse W. Kane 10:00 am Bethesda resolution of the vibration probicm associated with Model D-4 steam generators 10/22/82 50-329 MNHB-1713 Discuss dual operator licensing Consumers Power Co.

R. Hernan 8:30 am 50-330 Bethesda proposal for the Midland Plant PLEASE BE ADVISED THAT DAltY RECORDINGS CAN BE HEARD ON 492-7166

  • Copies of sinmaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.

~

l T

d r

C l

A n

a e

T e

a n

n r

N f

n o

t e

O f

r D

n n

C a

e c

i i

J H

M K

M n

i R

R N

D R

D L

5

)s (e

l i

f o

C t.

c t

c hb e

e e

.s ga l

k l

oi iL E

c E

Cs L

)

o y

3 d

rl

&l

)

ea t r s

r 6

/'

s wn rae a

e 6

e TS a

oA eNv G

v 1

v 7

i NE G

P w

i i

AE t

onR i

R t

CD e

sn Pe t

C 2

c I N r

re vl a

Pl 9

e LE o

em aaa n

F a 4

p s

PT m

ne dht n

,t N

e s

PT i

t g ik s i

AA t

saA roy c

Gy O

r l

nnR oor n

8 r GC D

e a

oaE l rC i

B CMT FB(

C E(

R h

A t

E H

n i

E l

t r

t ad B

d r

o d

n t e e

e o

f n

ee ns N

c v

r a

h re eo A

a l

p s

t ah mp C

l a

n t c8 pt m no p

C rg si4 rp a

or S

S ei ef oagr rp G

d N

n E

t ws ut 0 f

ng i C

a oet qc5 fi o vs l

a PDn ee eot r nn u

T s

a r pR t

eP E o R

e I

O l

O d

stl sFR atl i

t C

b N

a rnP s

C dh pn l

o ee e

x gmo aa E

a G

l mdd

'L h 0 i nioi cc R

l i

N E

unn At1 d ol ct ii I

S y

sea P

n i

a gf Y

a T

O v

n pl F mf e t nnn oi L

v l c I

a E

P a

oed oop eiin E

R e

Cdi f r p

l i

oe A

M U

h2 nM of sA pt sf i p D

y l

P eI t

mnen dS R

f&

h t

nsn,

oaio a

T c

R o

t ra one0 cl tC Rl A

i N

I o

iom5 pl a3 li l

l sf s sie s

uy sc -

T b

os s

w st rR srct sir u

rf ul e u pi F ueii unC D

p tf cai cmuC cmfl ch E

ni ssv seq smf a scr S

e I

d ol ioe ixe0 l iiu i eo CC D pR Der 1 OZdQ DTf V

a D

m A

e E

b a

D l

l F

E l

S i.

A w3 -

r E

m go t

e L

N n

v P

nr O

a i

i I

0 3

l R

tt T

1 a 1 a a

P en A

1 d 7d d

l C

6 s 1 s s

r a

ee O

- e e

4 e e

t mm L

Bh Bh l h m

s t

Bt Bt it m

y ec N e N e

- e i

r so MB MB PB Z

C ed htc i

LL fl 0, 0, ob TR MM 01 8

2 u

EE OO 55 5

0 sp KH 22 3

3 e

CM 90 il Ol 23 00 0

0 ra DN 33 55 5

5 ac t

mo al 00 t

55 sd n 2

f a 8

o

/

EM 2 m 2m 2

2 8

C I

8 a 8a 8 m 8m 2 m EPSi1EF

  • sR eN N4 w c,,N T

/

/

/ a

/ a

- a i

/

50 50 7

7 7

E 20 20 20 20 20 pe oh T

/: /:

/0

/0

/0 0:

0:

Ct A

00 00 0

D 1 1 1 1 1 9 1 9 1 9 l,

T C

A r

r T

e e

2 0

lT l l l

f l

l T

0 C

iH i

MM MMi E,

1 H

C W

W R

N 1

5 d

e b

o r

tc M

dI D_

i Mg W l

T nP m

WT l

,aM

,M i

/

nW Wn,

ST w

,i r i

EN t,

t el EA rr rnil DC ae euee NI Ml Bms l

EL l

l rs TP

.uu

.i i

TP BM MOSR AA J1 1 J J V,.

. 1 1

s re

- s oh t

e nt i

n n

rc r

e o

eo en m

rot r vo S~c it cP o

E g

v a

Ge C

a nrrw c

I n

E eae ert T

a thi hoc OM C nC v tf e e

N D e e

j e

RCWR fk o Gt E

N L

N's S

I osr Ii yI t aP C

O h c r

gT T

P I

ti eo n

W E

R il hp isL Ef U

f 'n l wot e M o P

P R

f e

g s

iad S

n nl sn rmr S

o auo B1 o i

M'I tt ci 1 f Ns enst Een w

l eeia Opa v

Mmdz DSl l

i D

C.

D A

W x

N a

n O

o I

t d

T g

n A

n a

C i

l O

h h

L s

c a

i W

R TR EL Kl l

CM OU DN E

2 2

M 8

8 I

/

/

T 9

2

/

2 1

E

/

/

NIg. P8im M T

0 0

s A

1 1

V

. - e'" g o

a g-6 m

T C

A v

T s

s a

N r

r O

e*

er r

C d

dr r

n ne e

C a

ah h

R S

SS S

N K

KT T

C AC R

I R N

DN C

E AE O

R SO D

N

/

ND ST A

A EN EA AA D

D D

C C

DC I

NI CC A

A EL A

TP TP e,

e e

AA tF t

t aA a

a tS t

t o

SU S

S e

O lc e

y Cr a

g l e t

el M

f u p

uc N

u r

o af r

con G

o i

csi g

utt n

S s

Nca i

E d

E er k

C r

S npe r

I a

iO, osf o

T u

P Ai W

g O

g R

p l

n H

e U

ol o n

i f

P h ar a

t G

a scP l

c N

S ki P

e I

rns H

oh n n

T f

E o

Wco o

S E

ep i A

M n

ET a t

T o

O e

c O

S i

D&W A

P S

s M

l iv f

i D

CD n

t n

N o

p e

O t

e vk I

g D

ar T

n h o e

kY A

i C

h t

o O

s a

ow L

a t

re W

S UN TR EE KB CM OU DN E.

1 M

2 I

T 9

6 0

Pz O M~

/.

1 2

2 E

/

/

/

1 T

0 0

0 w g,R A

s c

1 1

1 i

D 6

NMSS MI:ETING NOTIEES o

FOR WEEK ENDING: 10/15/82 O

Division of fuel Cycle and Material Safety a

m ATTENDEES /

I.

DOCKET N DAll/ TIME NUMBER 0 CAT 10N PURPOSE APPLICANT NRC CONTACT 10/10-15/112 Seattle, WA To attend 1982 International W. T. Crow W. T. Crow Deconinissioning Symposium 10/12-14/82 New Orleans, LA Planning A Program Meeting Representatives C. E. MacDonald for International Symposium from 00E, DOT, on Packaging and Transporta-Sandia Lab. and tion of RAM.

Others.

10/15/82 Conf. Room Pre-Application Meeting for J. Rollins and C. E. MacDonald 5th Floor, SS Spent Fuci Storage / Transport H. Baatz, GNS C. R. Ciappell Cask.

10/19-21/82 70-27 Lynchburg, VA-To review implementation of J. T..Long J. T. Long 70-1201 Radiological Contingency Plans R. D. Cardarelli dt Babcock & WilcoX facilitics (NNFD, Lynchburg Research Ctr

& Commercial Nuclear Plant).

10/20-22/82 Washington, DC Spent Fuel Management and Representatives J. P. Roberts llyatt Regency Waste Disposal Seminar from NRC, DOE, Hotel DOT and the Nuclear Industry.

J. P. Roberts, NMSS

! ~

g P8

!5

~

m 1

m e

+

e 4

4 0

,m

.,r m:-.-..

,....u..

--m.-

_..-.-.-%,~-.e.%.

....,.m,+1~,---r_,-

-.m.,

,w.,

y,-_,,--..,.-.,._.,_me.

~,..-..e-

,m_,

i ii I

T C

s A

m g

I a

s n

e e

u N

s i

O e

l k

m o

t l

l i

Y C

e r

e a

i B

W B

G D

CR N

G E

W B

R e

le v

i n

2 n

t 8

o n

a i

t 9

EE sr m

n

/

e d se 1

I I P

s g

Ars ST 5

EN so f

sn nr oe EA ens l f e

ei uol t r 1

k mk ol aap DC mae aa e

gt nt l

ir Y ynre r

i NI raa oS e

re eaotR e

i D

GP DTi s b

EL GPB o

TP gP giR e

R eE t

TP c

AA BTG RD W

BK RJR N

O 1

ec g

8 g

ri n

n C

n n

ur o

S ci o

st i

i sc et f n i

oi t

p di t

ee a

onea u

as cl rl enr yt oht o

gi s eapE h oT c

it n rs nvey t n ti nst e

Gt o

sc oodl tl eecnm r

L son rina i

f an gi eie ga ipe pt ar rg a

e oza rt p l

nP

.rour eN rn eis ep i

i gnh ml nsm kt Mh pe r

ee el G na c Eii ui rn w

m i

gr c

oe h

h es fhl S

i t ra naert Wm t ec s

t od E

croe s

B n C

eOe ofh os e) i e

s tf ol C c0 wnat n sh a~

I ml es pe pa I a1 ae d

utf T

E aR r ospm s

Pl grsd e cios O

S l n o

h noaei N ps nF eer sw l

N O

ao

,t sol rt a

/es i

rt a i

d e P

uit c k p e gi r ER a t m ap dt rs eorl e eas G

R nt sa rsvosp E

l N

U naee oeernp E nC eroer oeoe o(

Mff rp T mI V l

ANTR WRd poa I

l P

i E

E D

M n

M o

s A

n E

i t

g C

o I

a r

i t

u t

N S

b o

a 0

s g

r V

l e

r e

a n

l g

e i

A e

h D

it o

C l

t i

l i

n C 'n g

O oX a

a R e e

L CT G

S NC R

IR EE KICH Ot DN 2

2 2

E 8

H 8

M

/

/

/

0 2

0 2

2 l

i 2

2 2

H H

mMG$A,

/

/

/

E 8

9 9

0 6

1 1

1 2

2 8a w W a0

/

/

/

/

/

r; AL 0

0 0

0 0

1 1

1 1

1 l'

ii;-

l 4

reo d

e n

r s

z i

ol n

fl y

t z

k i

T c

k rt n

n l e l

e er C

e nwy A

b eoo l

W TP I

T n

JLH 2

N e

A E

JJ 8

O d

9 C

o JJJ 1

R C

R I

5 N

E f

I f

S 1

I

&a E

r S

s t

R RS e

E e

E c

gs S

i yn E

,S

,R S b

SR SE s gi s R

rE r

E o

(

yonn eR e

,R t

ER,

l d hli o g

R

,s c

nRP oai e

n.

l r,

O a

i ol cD

,yiR nrt z

is i L trkNlht a t

zi Mfl e

rE ywn ac r

n nw

.ler e

looe, reye i ee l

WL RTP m

m AR lLJSet rp l

l noro

.Fi ei u o

R r

fD JJJDGBS A

EG JJJ f

,o

/

l ceS ST e n pS s

EN nI oM i

EA n

,cN s

DC o

s y

o Nl sii l

t n

Ei rxxS a

TP eiiE n

g o

i TP PlLR a

n t r AA s

i k w n

ao nf s e i

i e

ar a

l p t c t

d s re ao r

cc rm es oc S_

is oo pm oi E

l i f o e

q cf C

ex r

gt n

i f

d o I

ni n

ns i i

T l

ol i y t

n n

o tS e

al O

e i

N h e t r e

e a

th ct er M

nn G

t en ni oos N

E s

l o r A 7

iid t gr I

S sf l c 3

6 T

O uo o

l cea E

P c

cP 9o P

aru r

g E

R s e P

5 r S

ehe M

U i s aN t

ttf P

Du t

Sn A

S af No S

nia I wS E

Do AC I

R N

g O

d I

l A

I A

l T

P C

e t

i O

t 0 A

A L

s3 V

C a

l 1 i

I n i

h I y m

S o

p w

f Il 4 R G

t l

1 l

N l

e A

d nE y

a o

in r

o l

ge r

l i

u a

h el RG S

P P

TR EE KB CM Oil DN

~

0 E

0 M

2 H1 2

2 2

I T

/

8 8

8

/

30

/

/

/

E 1 3 2

EP8C r m A

00:

9 1

9 8

T

/

2 2

1

/

1 1 4

0 8

6 5l

"' " lN D cC b

1 2

1

/

/

/

/

0 0

0 0

1 1

1 1

1

n T

r a

C e

m A

s r

e T

s e

n f

f a

t n

0 s

s e

2 C

l i

r 8

E K

B 9

Cm 1

iT H

F E

1 l

l e

RD d

E ro B

d eh O

r wR T

a o

C o

P.

O B

G k

P w-L a

A hn

/

S oo S '1 Mi s

EN I

t e

EA s

aa t

DC nr rr P a NI oe ao St EL ib gp OS TP gm ar TP ee io AA RM NC drao g

S B

n l

E i

a C

P t

t u I

L e

rne T

A e

ant O

S M

pA a N

r t

k t

edS G

c n

t n e

e nat N

N m

u n

I E

g e

ogeg T

S E

O mn c

Cnmn ai r

iei E

P dt o

Ot et M

R de f

L ere l

i ae n

S cge I

P l

M E

Rf AM 1

l t

f 0

1 G

E R

D t

o M

c c

t i

f f

g f*

f r

O O

u i

1 ls I

I

!0 r

1 n

n e

T o

o h

A i

i t

C g

g i

O e

e a

L R

R G

TR5 0

EE 1

1 KB 2

4 Cf l

0l 0

0 i

)l 5

6 I j 9

2 K

m

/

II m.

0 i

I a

1

/.

a PMiis M 0

00 5

f 20 20 2

S /3

/:

/

0:

00 0

D 18 11 1

e 8m * " Am~I '

T 0

4 4

4

e T.

t e

t l

A T.

s s

u n

e i

i k

a c

2 0

w w

n y

n i

i r

a 8

C e

e.

S B

D 9

L I

1 c

J I.

i

l R

R M

I 1

5 1

r e

bo l

l t

e e

c

s I

n n

O s0 mI n

n 1

l o

l o

l f

r1 oR adf o

r ads ads nna td fd nnr nnr

/

S T(.

oat cn e

oae oae L f i

S ea et i

P i

P l A gr p

vcs gr gr

?

liC eol sl i er eol eoI RI Rti ni tl e RtI RtI R

aeb

.aR

.aR LI

.aR I

r r

I P r

l tS u I

l' ctd tde n

e etd etd AA eses nen edN ese ese sit r et n sn sit sit nnce dco eaf nnc nnc eieh i es r

f eie ei e cml c sl r pR a cml cml i

t. ee eee eRt id e id e LASM RSP RRS LAS LAS e

e S

h g

E h

t r

y n

C t c og hn i

I uint t n P

t a t

T oroay ci L

io et O

St t

et A

wm en N

cyni pe rS g o

rymi enol se e

n gC en o

e ltl aii nM wni n

watP G

N iC pt c i oot ir opn w

maa y

Pi e t e P mey I

aogf tl t e ew ome T

gnCi nh aaN co aCek C

1 i

E 5

ni t r et dr P

d cr f

M 0_

i l sse d n iod it ru e

rhoT t oa en o

rpr P. k o gf i

P e

~

erg vn su ora 1

R.

oo Al u li nn 1

l ea nu el l

C&iS RB FCI SD fLeo

~

l.

l l

f f

NO I

G E

R e

e e

e c

c c

c i

i i

i f

f f

C f

f f

f t

f i

O O

O O

e I

1 1

1 H,.

1 1

1 t

I u

t f

n n

n o

n o

1, o

o o

I l

i i

i r

A, i

g g

g a

g (0

e e

e h

e l.

R R

R C

R TR LE W.1pM K

I f,

2 0

/

m.

P8i,sn g

2 3

2 m 2

m.

28 8

j 8

2 0

e I

/

/ a

/ p

/a 1,

8 0

6 7

8

/

1 2

20 20 20 oO $,u, i ~

S E

/

/

/3

/ 0

/3 0:

l 0

0 0:

0 b

9 i

1 1

1 8 1 2 1

l.

e e

l 11!

l

!I!

r r

r e

e e

r T

l l

l e

C p

p p

l A

p p

p p

T e

e e

p 4

2 t

K K

K e

K.

8 C

9 C

G. f G. f G.

G.

1 C

Jf Jf Jf Jf R

a a

f f

5 P

1

.t t

a a

.s t

t cs s

s r

e e

l &

v&

r b

E r

n8 cC o

r er o

a t

E e S e sr or c

/

l i e P e O

ST sp

.l dl l

p EN a p b p E p s p EA G e ue p

r p I.

.K PK t e ee DC 1

iK mK fE t n.

o u

T P r.

s.

n s G.

G.

G.

n G.

l P l

t i

AA C

UJ e

o J

DJ CJ f

f n

n o

ot t

S C

C n n

E a

i C

t tl t

o I

n nP n

P T

e e

a s

O E

m me l

k e N

S e

ee P

cd O

c c r oa G

P r

re i

R s N

R o

os m

p i

f. w r

l gl 2

I U

f n

r e e

aia 2

T P

E E

EK F

SBP

/

E 0

M 1

o I

I t

I 8

N 1

O

/

I 0

G 1

E R

H L

L L

n O

I I

I o

r f

n n

n i

t y

y y

d l

a l

l l

e f

C n

l l

l g

I n

E E

E r.

i a

T A

c n

n r.

h e

e c

C n

e.

i l

t OL C

'G G

G e

t a

d 2

8

/

T R 0

5 1

55 7

E E 5

0 4

55

/

K0 3

3 3

1 2 0

C 1

1 OU 0

0 0

00 DN 5

5 5

55 de trop er y

lsu o

m.

i 2

2 v

E 2

2 P8%m U M

8 8 a B

8.

e m.

r

/

/

/.

/

I T

9 20 7

P m.

8 2 a 8e # v G*~

/

e 1

23 2

/

/:'

/ a

/

E 0

00 0

D0 T

1 1 1 1 9 1 1 M

'l l

. i

'li 15 ' i

!I I.

UNITED STATES NUCLEAR ReiGULATORY COMMISSION D

WASHINGTON, D. C. 20655 INFORMATION REPORT SECY-82-443 October 28, 1982 For:

The Comissioners From:

T. A. Rehm Assistant for Operations, Office of the EDO

Subject:

WEEKLY INFORMATION REPORT - WEEK ENDING OCTOBER 22, 1982 A sumary of key events is included as a convenience to those Comissioners who may prefer a condensed version of this report.

Contents Enclosure Administration A

Nuclear Reactor Regulation B

Nuclear Material Safety and Safeguards C

InspRtTon and tnforcement D

Nuclear Regulatory Research E

Executive Legal Director F

International Programs G

State Programs H

Resource Management I

Analysis and Evaluation of Operational Data J

Small & Disadvantaged Business Utilization & Civil Rights K

Regional Offices L

CRGR Monthly Report M*

Executive Director for Operations N*

Items Addressed by the Comission 0

Meeting Notices P

  • No input this week.

DISTRIBUTION:

Commissioners

/

O T. A. Reh., httdfor Operations I

gp Office of the Executive Director

{

ACRS for Operations SECY 62LLU_ ~ / N

Contact:

FOR INTERNAL NRC T. A. Rehm, ED0 DISTRIBU ION ONLY C>'(

492-7781

.m g\\

,y e

s,

hth b h TQ-K/

HIGHLIGHTS OF WEEXLY INFORMATION REPORT 10 Df Ea j

Week Ending October 22, 1982 Moving Headouarters Staff to the Regions On June 29, Regional Administrators were constrained regarding outside hiring when NRC Headquarters employees are well qualified and available.

Since then, RA's have announced 24 selections of Headquarters employees. One hundred seventy-three interested staff members remain on the register for regional assignments.

Supervisory Development Program Under Appendix 4150, Part VII, a new Supervisory Development Program is to be implemented. During the week of October 25 a pilot session of the new course, " Supervising Human Resources," was c,onducted. The " Supervising Human l

Resources" course will be brought to the NRC Regional Offices in the spring of 1983.

Regionalization A training program for regional personnel to use in evaluating licensee changes under 10 CFR 70.32 has been developed.

Five staff members from Region I and II underwent training on October 20-21.

Convention on the Physical Protection of Nuclear Material On October 19, the President signed into law H.R.5228, the Convention on the Physical Protection of Nuclear Material Implementation Act of 1982.

The Act amends the Federal Criminal Code to make theft of nuclear material, extortion and similar offenses involving nuclear material federal crimes.

1 National League of Cities Steve Salomon, OSP, met on October 20, 1982 with the National League of Cities to discuss items of mutual regulatory interest. Current interest is focused l

on the enforcement of regulation pertaining to the transportation of hazardous materials including radioactive materials.

Grand Gulf Nuclear Station, Units 1 and 2 On Odu' er 20, usz, the ASLB issued a Memorandum and Order in this operating o

license proceeding denying the late-filed petition to intervene of the State of Louisiana.

i Significant Enforcement Action The following actions were taken during the past week:

EN-82-33, Vermont Yankee Nuclear Power Corporation (Vermont Yankee) - A Notice of Violation and a Notice of Proposed Imposition of Civil Penalty in the amount of S40,000 were issued on October 15, 1982.

OCT 2 2 M

i, OFFICE OF ADMINISTRATION Week Ending October 22, 1982 ADMINISTRATION OF THE FREEDOM OF INFORMATION ACT STATUS OF REQUESTS Initial Appeal of Request Initial Decision Received 527 24 Granted 376 1

Denied 77 21 Pending 74 2

ACTIONS THIS WEEK Received Aileen M. Smith Katagiri Requests copies of infrared photographs for the 1978 (82-489) and 1980 reports entitled, " Monitoring of Cooling Tower Operational Effects on Vegetation in the Vicinity of the Three Mile Island Nuclear Station,"

prepared for Metropolitan Edison Company by Environmental Services Division, NUS Corporation.

Sanford L. Hartman, Requests all documents setting forth NRC policy Debevoise & Liberman concerning (1) the issuance of press releases by (82-490)

NRC in connection with its enforcement and licensing activities and (2) the coverage of NRC licensing or other NRC hearings by the media.

l Lyle Graber Requests copies of SECY-82-lllA and SECY-82-lllB.

(82-491) l Milo Solomito, Requests information to verify that Jack E. Terry was

. Methodist Hospitals an authorized user under Radioactive Materials License of Memphis Number 34-07225-15 issued to Picker Corporation and l

(82-492) a copy of the license.

l Al Stern, Requests a list of those who received IFB, RS-ADM-Al Stern Associates83-298.

(82-493)

Kim Fickett, Requests a copy of SECY-82-322, " Review of Directors Energy Research Decision on 2.206 Petition," and the 8/16/82 Memo to Group, Inc.

Bickwit from SECY.

(82-494)

CONTACT:

J. M. Felton 492-7211 ENCLOSURE A OCT 2 21SS2 I

2 i

Received, Cont'd (NRC employee)

Requests copies of all documentation which served as (82-495) the basis for his appraisal, rating and coments.

Catherine Quigg, Requests all records on embrittlement, thermal shock, Pollution and corrosion and cracking of the reactor pressure Environmental vessel at the Zion Nuclear Power Station and all i

Problems, Inc.

other records which relate to these problems at l

(82-496) any plant.

l John C. Houston, Requests a copy of grant applications and grant The Fairness awards to the National Conference of State Committee Legislatures over the last five years.

(82-497) l Renee Magalona Requests all infomation concerning government (82-498) experimentation testing involving toxic and carcinogenic.or radioactive substances and documents concerning the presence of military personnel I

near the explosion of nuclear devices.

l A. P. King, Requests a copy of SECY-82-58.

l British Embassy (82-499)

Barbara Stamiris APPEAL TO THE COMMISSION for the release of the 1981 (82-A-20-82-477)

Confidential Proposed QA Stipulation relating to the l

Midland Nuclear Power Plant.

j Granted Lynn Connor, In response to a request for a copy of the NRC Doc-Search Associates Shutdown Plan, SECY-81-600 and SECY-81-600A, made (82-410) available a copy of the draft Shutdown Plan.

Informed the requester the SECY papers are already available at the PDR.

Malcolm H. Philips, In response to a request for documents regarding the Debevoise & Liberman value-impact / cost justification for the NRC staff (82-439)

' requirements' set forth in NUREG-0737 (Item II.F.2),

made available four documents.

Infomed the requester additional documents subject to this request are already available at the PDR.

Reuben Goldwaser, In response to a request for information regarding State of New York burial of radioactive material at NL Industries, (82-456)

Inc., Colonie New York, informed the requester the NRC has no documents subject to this request.

ENCLOSURE A OCT 2 '. W i

l 3

Granted, Cont'd Marshall H. Brooks, In response to a request for the name of the owner Friedlander, and of the managing agent of five specified buildings Friendlander &

occupied by NRC staff, informed the requester we Brooks, P.C.

have referred his request to the General Services (82-460)

Administration for direct response to him.

Thomas W. Parkinson, In response to a request for a list of the names Interstate Nuclear and addresses of all NRC licensees located in i

Services Maine, Vermont, Massachusetts, Ohio, Connecticut, (82-469) and West Virginia and the appropriate offices in j

the Agreement States of New Hampshire, Rhode Island, l

New York and Maryland, made available the requested information.

(NRC employee)

In response to a request-for a copy of the NRC's (82-475) 1981 Affirmative Action Plan, made available a copy of the requested record.

Denied (NRC employee)

In response to a request for four categories of (82-383) documents pertaining to Vacancy Announcement No. R-82-6014, made available three documents.

(

Denied one docurent in its entirety and portions of two documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

Denied two documents in their t

i entirety containing predecisional advice, opinions i

i and recommendations of the Panel Members.

l (NRC employee)

In response to a request for four categories of (82-384) documents pertaining to Vacancy Announcement No. RIII-82-0012, made available three documents.

Denied three documents in their entirety and portions of one document, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

j (NRC employee)

In response to a request for four categories of (82-385) documents pertaining to Vacancy Announcement No.

82-2810-6, made available two documents. Denied one document in its entirety and portions of-two documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

ENCLOSURE A DCT 2 21982 I

4 4

6 Denied, Cont'd j

Lynne A. Fairobent, In response to a request, on behalf of four NRC NTEU Steward employees, for documents pertaining tn Yacancy (82-459)

Announcements 82-1146 and 82-1720, mad' available l

eight documents. Denied portions of 13 documents, the disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

C. Coleman Bird, In response to a request for,tehies of such Wald, Harkrader documents as will show the names and addresses

& Ross of all persons or entities that submitted a (82-461) proposal in response to Request for Proposal No.

RS-SECY-82-437, denied the " Bid / Proposal Log" l

in order to protect NRC's interests in awarding of i

i a contract for stenographic services.

1 L

l I

l

)

l l

l

\\

l l

ENCLOSURE A 007 2 2 1992 l

l l

l

.,.. _ _,, ~.

l WEEKLY INFORMATION REPORT DIVISION OF CONTRACTS WEEK ENDING OCTOBER 22, 1982 1

l PROPOSALS UNDER EVALUATION RFP No.: RS-NMS-83-027

Title:

" Evaluation of Material Accounting Performance at Nuclear l

Fuel Cycle Facilities" i

==

Description:==

The contractor shall apply Automated Material Accountin?

Statistics System (AMASS) methodology to material accounting 4

perfomance evaluations at nuclear fuel cycle facilities.

Period of Perfomance: Twenty-one months Sponsor: NMSS Status: RFP closed October 15, 1982. Technical proposals forwarded to l

Source Evaluation Panel for review and evaluation on October 18, 1982, 1

RFP No.: RS-NMS-S3-028

Title:

" Additional Tasks for Development of the Automated Material Accounting Statistics System" i

==

Description:==

The contractor shall perform work in the (1) development of applications oriented AMASS documentation; (2) validation of the generic measurement error structure employed in AMASS by I

the analyses of the source of measurement errors for general major measurement systems; and (3) incorporation into AMASS the effects of bias and bias correction procedures.

Period of Perfomance: Fifteen months l

Sponsor: NMSS Status: Competitive range report due October 15, 1982.

CONTRACTS CLOSED-0VT NRC-02-78-077 Science Applications, Inc.

10/18/82 NRC-02-80-051 SRI International 10/18/82 NRC-05-73-Oll State of Connecticut 10/15/82 NRC-04-74-232 Massachusetts Institute of 10/20/82 j

Technology (MIT) l NRC-04-79-212 Univ. of Arizona 10/21/82 l

NRC-04-78-246 Univ. of Sheffielo 10/21/82 i

NRC-02-80-066 Council of State Government 10/22/82 N RC-10-81 -379 Lundsford-McKee & Associates 10/15/82 ADMINISTRATIVE MATTERS As previously noted in the Weekly Infomation Report for the week ending September 17, 1982, The Franklin Institute had notified NRC that the increase in the volume of documentation to be reviewed under Assignment 13 would necessitate a six (6) month extension to the Assignment and additional costs in the amount of $600,000.00 to satisfactorily complete the Assignment.

In response to NRC's request, Franklin submitted alternative approaches with corresponding cost estimates for completion of the Assignment which were subsequently reviewed by the appropriate NRR personnel. As a result of this DCT 2 21992 ENCLOSURE A t

u

_i.&

s

_,.s a

1 I

i i

i I

}

Weekly Information Report :

l ADMINISTRATIVE MATTERS Cont'd l

review, NRR submitted a Request for Procurement Action (RFPA) requesting that the Division of Contracts (DC) negotiate an extension to the contract and increase the contract funds to facilitate the completion of all outstanding work under the assignment. DC consummated negotiations and contract modification 5

No. 23 was fully executed on September 30, 1982 extending the period of performance by six (6) months to March 31,1983-and increasing the estimated reimbursable costs by $498,911.00.

3

)

4 4

i ENCLOSURE A OCT 2 21982 I

DIVISION OF ORGANIZATION AND PERSONNEL ITEMS OF INTEREST As of October 22, 1982 Moving Headauarters Staff to the Regions:

On June 29, Regional Administrators were constrained regarding outside hiring when NRC Headquarters employees are well qualified and available.

The same date, Headquarters employees were invited to register their interest in Regional jobs with the Division of Organization and Personnel.

Since then, Regional Administrators have announced 24 selections of Headquarters employees, as follows:

j 8 selections Region I l

Region II 6 selections Region III 4 selections 5 selections Region IV 1 selection Region V i

24 i

A total of 173 Headquarters staff members remain on the register of l

individuals interested in Regional assignments.

)

i i

1 ENCLOSURE A OCT 2 g logg j

l 1

MANAGEMENT DEVELOPMENT AND TRAINING STAFF WEEKLY INFORMATION REPORT WEEK ENDING 10/22/82 Supervisory Development Program The Management Development and Training Staff has begun to implement the new Supervisory Development Program. This program, outlined in NRC Appendix 4150, Part VII, consists of a comprehensive program designed to provide meaningful learning ex;,eriences for the development of first-level supervisors. During tne week of October 25, the pilot session of the new course, Supervising Human Resources, will be conducted. The curriculum of this course has been designed to help the first-level supervisor understand and deal with various skills and techniques found useful in performing the managerial function and to help the supervisor plan his/her future managerial development. One of the prime objectives is to provide continuing help in integrating the new supervisor into the management team as quickly and efficiently as possible.

In order to facilitate this and to clarify the role expectations and developmental needs of the participant, the immediate manager of the participant has been asked to attend one module of this course. The Supervising Human Resources course will be brought to the NRC Regional Offices in the Spring of 1983.

OCT 2 21932 ENCLOSURE A i

0FIICE OF MUCLEAR REACTOR P,EGULATION ITEPS OF INTEREST Week Ending October 22, 1982 Crystal River Unit No. 3 (CR-3)

About 2:00 p.m. on October 14, 1982 Florida Power Corporation (FPC) declared an unusual event for CR-3 and started shutting the plant down. Earlier a fire alarm had been received in the reactor building. On entering the build-ing no fire was noticed but the alarm came from the vicinity of the reactor ccolant drain tank. Subsequently, there was an increase in the level of the i

reactor building sump, level indication of the reactor coolant drain tank was lost and high radiation was measured in the reactor building. The licen-l see then started to shut the plant down to investigate. Earlier in the day the cooling coil in the drain tank failed and was isolated. The speculation is that r'upture disk on the drain tank failed and R/A steam is leaking through the pressurizer safety valves into the reactor building.

Oconee Nuclear Station, Units 1, 2, and 3 Euke power Company recently informed us of problems with the Dresser pres-surizer code safety valves installed on Oconee Units 1, 2, and 3 which caused it to declare these valves " inoperable" from a technical specification standpoint. Oconee Unit 3 was previously shutdown for a steam generator tube leak; Unit 2 commenced a shutdown for safety valve replacement; and Duke requested and ' as granted a waiver to allow operation of Unit 1 until w

October 30, 1982.

The valve problem involves incorrect positioning of the three adjusting rings which control the lift setpoint and blowdown capacity. This problem was disclosed during EPRI tests ~and has been discussed by NRR with licen-sees of plants L ilizing similar valves and with the Regional Offices. The affected N555 vendors have been orally requested to provide infomation on the operability of these valves by October 18, 1982. A generic letter to all pWR licensees is being prepared to inform all utilities and request their review of the potential problem.

Suscuehanna Unit 1 Independent Desien Verification Program In a letter dated October 14, 1982, Pennsylvania Power & Light Company (PP&L) provided a plan for a reconciliation sampling-program to review 500 safety-related pipe hangers. PP&L also requested in the same letter that the NRC staff allow operation of Susquehanna Unit 1 at power levels up to 35 percent rated power pencing completion of the reconciliation program. NRR has the matter under consideration.

NCWSURE B OCT p 3 ;g i

=_, -

I

' ~

t Monticello Nuclear Generating Plant j

On October 14, 1982, representatives from Northern States Power Company

[

and the Nuclear Regulatory Comission met in Region III. The Licensee

1) presented the recults of the inservice inspection program on the recirculation piping, 2) discussed the latest findings of additional cracks, and 3) presented plans for repair or alternative action. The number of cracks now totals 12. The licensee plans to place weld i

overlays over two of the cracks and provide justification for continued operation with the remaining cracks.

As a result of this meeting, Region III issued, on October 19, 1982, a confirmatory action letter to the licensee requesting an analysis of stresses resulting from repairs and justification for continued operation with existing cracks. The action letter requires the licensee to provide this information and receive NRC concurrence before Monticello may be returned to service.

j Maine Yankee Atomic Power Station i

Maine Yankee Atomic Power Company has detected defective tubes in Maine Yankee's Number Two steam generator. These tubes were identified in.a routing surveillance program during the current refueling outage. The surveillance is being conducted by Combustion Engineering with eddy current detectors.

i As of October 19, 1982, 815 tubes had been tested in this steam generator. Ten were found to contain defects greater than 40% of nominal wall thickness and are candidates for plugging.

Maine Yankee and Combustion Engineering observed that all but one of the defective tubes were in Rows 5 through 8.

These are the short radius U-bend tubes. The pattern of defective tubes is very similar to that found at St. Lucie 1. another CE plant.

In view of the similarity with the St. Lucie event, Maine Yankee is proposing a reduced surveillance program. Under the current technical specifications, the licensee would be required to examine all tubes in all steam generators. However, the licensee's proposing a one-time exemption that would permit them to do a limited examination focusing on short radius tubes.

ENCLOSURE B OCT 2 21932

~

,n3-,.

,.wm

I i

l NRC Tft1 PROGRAM OFFICE WEEKLY STATUS REPORI October 17, 1982 - October 23, 1982 i

1 Plant Status Core Cooling Mode: Heat transfer from the reactor coolant system (RCS) to reactor building ambient.

Available Core Cooling Modes: Mini Decay Heat Removal (MDHR) system.

RCS Pressure Control Mode: RCS is vented to the reactor building.

Major Parameters (as of 0500, October 22, 1982) (approximate values)'

Average Incore Thermocouples*: 110*F Maximum Incore Thermocouple *:

128'F RCS Loop Temperatures:

A B

Hot Leg **

90*F 88'F Cold Leg (1) 73'F 74*F (2) 74*F 75'F i

Pressure: The reactor coolant system is vented to the reactor building.

Reactor Building: Temperature:

66*F Pressure:

-0.12 psig Airborne Radionuclide Concentrations:

3 5.9 E-7 uCi/cc H (sample taken 10/15/82) 5.8 E-9 uti/cc particulates (sample taken 10/22/82) 1.

Effluent and Environmental (Radiolocical) Information Licuid effluents from the TMI site released to the Susquehanna River after processing, were made within the regulatory limits and in accordance with NRC requirements and City of Lancaster Agreement.

During the period Octcber 14, 1982, through October 21, 1982, the effluents ccntainec rc detectable radioactivity at the discharge point ar.c incivic,El efflue7.e racloactivity.scurces.,v.{.ichorigir.atedwitnirUnit2, containec no cetectab 1

  • Uncertainties exist as to the exact location and accuracy of these readings.
    • The primary water level is below the hot leg temperature sensors.

i ENCLOSURE B OCT 2 21952

.2 2.

Airborne Effluents Airborne releases to the environment as measured by licensee installed monitors at discharge stacks are listed below. These releases were well within regulatory limits.

AUGUST 1982 SEPTEMBER 1982 UNIT II EPICOR II UNIT II EPICOR II I

I I

I Noble Gases (Ci) 2.42 x 10 7.89 x 10 1.63 x 10 5.77 x 10 Particulates (Ci) 2.76x10j 4.94 x 10-8 1.43x10{6 6.97 x 10-0 7

Tritium (C1) 1.40 x 10 1.11 x 10~2 1.48 x 10 1.30 x 10-2 3.

Environmental Protection Acency (EPA) Environmental Data The EPA Middletown Office has not received the environmental Kr-85 for the samples which were taken after September 24, 1982, from the l

EPA's Counting Laboratory' at Las Vegas, Nevada. These results will i

be included in a subsequent report.

No radiation above normally occurring background levels was detected in any of the samples collected from the EPA's air and gamma rate networks during the period from October 13, 1982 through October 21, 1952.

4.

NRC Environmental Data Results from NRC monitoring of the environment around the TMI site were as follows:

The following are the NRC air sample analytical results for the onsite continuous air sampler:

1-131 Cs-137 Sanole Period (uti/cc)

(uCi/cc)

HF-3cl October 13 - Octcber 20, 1982

<6.8 E-14

<6.8 E-14 The NRC cnsite air sarpler is being modified ard will be out of service frcr Octeter 20, 19E2 throuch October 27, 19E2.

5.

TMI Occucational Exocsure Licensee TLD (Thermoluminescent Desimeter) records indicate the following Unit 2 occupational radiation exposures for 1982:

September 1982 29 man-rem Total 1982 (January-September) 259 man-rem OCT 2 213E2 ENCLOSURE B

~

3 i

Man-rem is an expression for the summation of whole body doses to individuals in a group. Thus, if each member of a population group of 1,000 people were to receive a dose of 0.001 rem (1 millirem), or if two people were to receive a dose of 0.5 rem (500 millirem) each, the total i

man-rem dose in each case would be one man-rem.

l 6.

Licensee Radioactive Material and Radwaste Shipments On October 18, 1982, one drum containing Unit 2 CRDM cable ties was shipped to Sandia National Laboratory, Albuquerque, New Mexico.

l On October 19,1982,11 Unit 2 smears from the pressurizer loop seal were shipped to Babcock and Wilcox, Lynchburg Research Center, Lynchburg, Virginia.

On October 21, 1982, one Unit 2 EPICOR 11 prefilter (PF-7) was shipped to Idaho National Engineering Laboratory, Scoville, Idaho.

On October 22, 1982, 83 drums containing contaminated laundry from Units 1 and 2 were shipped to Interstate Uniform Services, New Kensington, Pennsylvania.

On October 23, 1982, one Unit 2 EPICOR 11 prefilter (PF-8) was l

shipped to the Icabo National Engineering Laboratory, Scoville, i

Idano.

Major Activities J

1.

Submerged Demineralizer System (SDS). SDS is presently in a standby status. No new water is reacy to ce processed.

2.

Ep!COR II. The EPICOR II system is presently in standby status. No water is reacy to be processed.

3.

Reactor Building Entries. Four reactor building entries were conducted curanc tne weet of Octcber 17, 1982. Decontamination of the polar crane was the precominant in-containment activity. The polar crane ceccntaminaticn technicues include the use of a mild chemical degreaser, hancs cn cecontamination, vacuuming, ano flushing. Following the cetontamination, a stricpable coating will be applied to the crane sur# aces te hclo centrol surf ace contaminatier..

After the polar crane decontamination is complete, electric power lines will be connected to the polar crane and power tests of the motors and control circuits will be performed. Decontamination of the reactor building lower elevations will continue in parallel with the polar crane refurbishment.

4 EpICOR 11 Prefilter Shipment Status. Two EPICOR II prefilter shipments were mace f rom IMI to ine Icano National Engineering Laboratory (INEL) this week; PF-7 in the CNS-8-120 cask (10/20/E2) and PF-8 in the HN-200 cask (10/23/62). Currently five in a group of 49 EPICOR II prefilters OCT 2 219E2 ENCLOSURE B

. =. -.

~

4 have been shipped to INEL. 'The remaining 44 PF liners are stored in the

~

. solid waste storage facility modules. 7PU intidpateC-shipping an additional eight PF's by the end of 1982. The majority of i

the remaining EPICOR PF's will be shipped during 1983 at an approxima,te rate of four shipments per month.

5.

Purification Demineralizer Status. Preparations are continuing by GPU and DOE for the removal and disposal of two reactor coolant system (RCS) purification demineralizers. External gamma scans on the 4 ft. diameter, 7 ft. high, stainless steel vessels indicate approximately 15,000 curies of mixed fission product activity exist (predominately as Cs-137) within i

each vessel. Preliminary data from a special Si(Li) (Lithium drifted silicon crystal) detector provided by the DOE Westinghouse-Hanford Environmental Development Laboratory (WHEDL) indicates that some reactor fuel was deposited in these demineralizers. However, the fuel content is j

significantly below the threshold level for criticality concerns. GPU is l

making preparations for collecting gas and liquid samples from each of the demineralizer vessels in December, 1982. Further characterization of the vessel internal conditions including resin samples is scheduled to be completed in early 1983. In conjunction with GPU's activities, the DOE through WHEDL is evaluating options for the eventual removal and disposition of the demineralizers. The techniques being considered include resin sluicing, chemical dissolution and vessel removal.

6.

TMI Aerial Radiolooical Survey. Preparations for the aerial radiological survey of the Three Mile Island area are continuing. The initial overflight is scheduled for either Monday, October 25, 1982 or Tuesday, October 26, 1982, weather permitting.

l l

I 2 2 IEE2 ENCLOSURE B

"'D

.--e-f.,,,,

l l

~

5 l

Future Meetines

{

1.

On October 29, 1982, Lake H. Barrett will meet with Friends and Family of l

TMI to discuss various TMI-2 issues.

2.

On November 9,1982, the NRC Comissioners will hold two public meetings t

to discuss the potential restart of TMI Unit 1.

The first meeting will be to hear oral presentations from the parties involved in the formal TMI Unit 1 restart proceedings. This meeting will be opened for public j

i attendance (not public participation) and will be held from 3:00 to 5:00 PM at the William Penn Museum Auditorium Third and North Streets, Harrisburg, Pennsylvania.

The second meeting will be in the evening to hear the views of concerned citizens who are not parties to the fonnal restart proceedings. The i

speakers for the evening meeting will be selected by Mr. John E. Minnich,

~

Chairman of the Dauphin County Board of Comissioners and also Chainnan of the NRC Advisory Panel for Decontamination of TMI Unit 2.

He will l

select the speakers from a list of people who requested to speak at the 4

meeting by calling the NRC's TMI. offic+ during October 21 through October 27, 1982. Details for the meetings are included in the Attachment.

3.

On November 17, 1982, the Advisory Panel for the decontamination of TMI Unit 2 will hold a meeting --open for public observation-- to discuss the l

current status of cleanup efforts and the disposition of processed water.

The meeting will take place at the Holiday Inn, 23 South Second Street, i

l Harrisburg, Pennsylvania, from 7:00 to 10:00 PM.

l i

i l

1

(

ENCLOSURE B

]

OCT 2 21932 l

f"*g UNITED STATES 1

s NUCLEAR REGULATORY COMMISSION e

t OFFICE OF PUBLIC AFFAIRS, REGION I

\\,,,,,*

631 Park Avenue, King of Pnasis,Pa.19408 No.:

I-82-103 Wednesday October 20, 1982

Contact:

Karl Abraham Gary Sanborn Tel:

215/337-5330 337-5000 NRC ANNOUNCES DETAILS ON NOVEMBER 9 MEETINGS IN HARRISBURG The Nuclear Regulatory Comission today announced further details on meetings to be l

held in the Harrisburg area on November 9,1982 to consider the proposed restart of the l

Three Mile Island Unit 1 nuclear plant.

l The NRC announced on October 6 that its five Commissioners would hold two meetings in l

the Harrisburg area on November 9, one 5 the afternoon to hear oral presentations from

ne parties involved in the TMI Unit 1 restart proceeding and one in the evening to hear i

interested citizens who are not parties to the proceeding.

The evening meeting will be neld from 7:30 to 10 p.m. at the Central Dauphin High School. 4600 Locust Lane, Colonial Park, Harrisburg. The afternoon meeting, scheduled from 3 to 5 p.m., will be held at the William Penn Museum auditorium, 3rd and North Streets, Harrisburg, and is also open to public observers.

In an order issued on October 6, the Comission indicated it would like to have a neutral party arrange for speakers at the evening meeting. with the aim of having a balance of viewpoints presented. John E. Minnich, Chairman of the Dauphin County Board of Comissioner and also Chairman of the NRC Advisory Panel for Decontamination of TMI Unit 2, has agreed to assist the NRC in making arrengements for the evening meeting.

He will review the list of people rr psting to speak and will select 30 persens to represent a balance of view-

'ese 20 speakers have finished, if time remains, additional speakers will points. Af.

the order of call-in prior to the meeting.

be enosen b. c.

o The Cc nission order stated that selected individuals or organizations will be allotted three minutes eact at the meeting to nake statements in the nature of limited appearances, witn no single individual or organization (by virtue of anotner yielding) speaking for rcre tnen six minutes.

The meeting will be enaired by the Chaiman of the Nuclear Regulatory Comiss%n, Nunzio J. Palladino. ~ Mr. Minnich will be responsible for timekeeping and announcing. the order of speakers. Since the purpose of the meeting is to allow the Comissioners to hear the views of the oublic, questions from the speakers will not be entertained.

Those wishing to speak at the meeting must contact the NRC's TMI office by phone between the hours of 8:00 a.m. and 5:00 p.m. on October 21. 22, 25, 26 or 27. Phone neeers to be used are (717) 948-1150 or 946-1152.

If citizens have difficulty getting through, they can call a reserve line in Philadelphia on 215/337-5332. No names will be accepted after 5:00 p.m. October 27.

(MORE)

ENCLOSURE B g 7 3 7 g.gy

l l

i.

j 1

No. !-82-103 2

l The 30 speakers will be notified by phone by t,ctober 29 and a confirmation letter i

will be sent to each by Mr. Minnich.

i Written coments will be accepted at the meeting from anyone wishing to submit them.

They should be turned into the Speaker Desk which will be identified at the'meetin~g'. All coments will be provided to the five Comissioners and to the parties to the TMI-1 restart

~

proceeding.

t In its order issued on October 6, the Comission said that it intends to decide by December 10, 1982, whether to lift the effectiveness of two 1979 orders directing that TM1 1 remain in a cold shutdown condition until further order. These orders followed the March 1979 accident at Three Mile Island Unit 2.

The Comission noted, however, that even if its December 10 decision is to lift the effectiveness, further authorization would be i

i required before restart of THI-1 "...because issues beyond the scope of the earlier shutdown orders, such as the steam generator tube leaks, will still have to be resolved..."

The oral presentations by the parties on the afternoon of November 9 will be on the l

Atomic S6fety and Licensing Board's July 27, 1982, partial initial decision on cheating in reactor operator licensing examinations and on the Licensing Board's December 14, 1981, 1

partial initial decision on hardware / des 15n issues, the separation of Units 1 and 2. and emergency planning.

9 f

1 1

i l

2 2 1932 ENCLOSURE B f

i I

1 0FFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending October 22, 1982 Regionalization A training program for regional personnel to use in evaluating licensee changes under 10 CFR 70.32 has been developed. Five staff members from Regions I and II will undergo training on October 20-21.

Inventory Difference Resolution NUSAC, Inc. briefed Safeguards staff regarding contract results which provide the following two significant capabilities not previously available for the analysis of inventory differences:,(1) estimation of the quality of the calculated variance of the inventory difference, and (2) the ability to segre-gate non-measurement contributors to inventory difference into four components.

j Once fully developed these should help assure better understanding and resolu-tion of inventory differences.

Kerr-McGee's Rare Earths Facility, West Chicago, Illinois On October 19, 1982 representatives of NHSS and OCA met with Mr. Cobb of Congressman Corcoran's staff to discuss matters related to the decommissioning of Kerr-McGee's Rare Earths Facility in West Chicago, Illinois. Matters discussed included NRC's schedule for preparing the Final Environmental Statement, EPA's sug;estion that the final statement discuss alternatives for disposal of thorium present at offsite locations, and efforts of NRC and EPA to develop a memorandum of understanding concerning agency responsibilities for assuring that remedial actions are taken at sites contaminated with 1

radioactive materials.

Florida Power and Licht Company Florida Power and Light Company was issued Materials License No. SNM-1902 on October 14, 1982, authorizing the receipt, possession, inspection and storage of uranium, enriched in the U-235 isotope contained in fuel assemblies and j

fission chambers, and plutonium-beryllium sources for eventual use in St. Lucie Plant Unit No. 2.

Spent Fuel Sto-age - GNS Topical Report Following receipt of detailed staff comments on the topical reoort submitted by GNS on the West German dry storage cask design and subsequent meetings with the staff, GNS has advised that it will submit a revised topical report in late i

November 1982. Because of major revisions planned in the format and content i

of the report, GNS has requested withdrawal of a number of appendices submitted with the original report that GNS requested withheld because of contained proprietary information and data.

ENCLOSURE C 1

0C7 g g Le,

l t

_ ~. _ _ _

l l

3 2

Spent Fuel Storage - VEPCO The FC staff has received an application from VEPCO to provide for additional

)

spent fuel storage at its Surry site through the use of dry storage casks under the provisions of 10 CFR Part 72. The VEPCO transmittal letter explains I

I that the application refers to reports under preparation by various cask manufacturers which are to provide details of the cask design and safety features. Specifically identified by VEPCO are reports being prepared by j

Ridihalgh, Eggers and Associates (REA), Gesellschaft fur Nuclear-Service mbH (GNS), and Combustion Engineering (CE). VEPCO states 1. hat the first of these reports will be submitted within 6 months with others following(as amendmentsThus, whj to the application.

het not been made by VEPCO. the application at the present' time is intended i

to provide VEPCO cask design criteria and specifications arid all site-related information on hedling and storing the fuel under Part 72 Ifcense. NMSS reviews of the application will be coordinated with any licensing actions that may be necessary under the Part 50 operating licenses for handling the casks at the Surry reactor pool. A detailed review schedule will be developed after an initial review for completeness of the information presently contained in the application.

CCT 2 21532 ENCLOSURE C j

b i

-,.-,~.-,......., -,..~.,.-,,-.

OFFICE OF INSPECTION AND ENFORCEMENT ltems of Interest Week Ending October 22, 1982 i

1.

The following Significant Enforcement Action was taken during the past we'ek:

EN-82-33, Vermont Yankee Nuclear Power Corporation (Vermont Yankee) - A Notice i

of Violation and a Notice of Proposed Imposition of Civil Penalty in the amount i

of $40,000 were issued on October 15, 1982. This action is based on one violation concerning the failure of station personnel to promptly recognize changes in the status of safety related equipment and, therefore, to promptly classify and report events in accordance with the emergency plan.

2.

The following Preliminary Notifications were issued during the past week:

a.

PNO-I-82-65. Duquesne Light Compan.v (Beaver Valley Unit 1) - Plant Trip and Partial Loss of Offsite Power.

b.

PNO-I-82-66, Power Authority of the State of New York (James A. Fitzpatrick Nuclear Power Station) - Transportation Accident.

c.

PNS-I-82-13, Public Service Electric and Gas Co. (Salem Nuclear Generating Station) - Attempted Suicide by a Security Monitor.

d.

PNO-II-82-ll2, Georgia Power Company (Vogtle Units 1 and 2) - Media Interest in Geological Report.

e.

PNO-II-82-ll3, Florida Power Corporation (Crystal River Unit 3) - Shutdown l

in Excess of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

j f.

PNO-III-82-ll2, Comonwealth Edison Company (Quad Cities Nuclear Plant) -

Bowed Spent Fuel Storage Racks.

g.

PNO-III-82-113. Victoreen. Incorporated (Cleveland, OH) - Shipment of 112 Millicure Cesium-137 Source Without Proper Labels Or Shipping Papers.

h.

Sacramentc Municipal Utility District (Rancho Seco Nuclear Power Plant) -

Unidentified RCS Leakage Greater Than One GPM.

1.

Pacific Gas & Electric Co. (Diablo Canyon Unit Nos.1 and 2) - Declaration of Ur. usual Event Due to Forest / Brush Fire On Land Surrounding Plant.

j.

U. S. Ecology, Inc. (Seatty, Nevada Burial Site) - Banning of General Electric Company, Vallecitos Nuclear Center (NRC and State of California j

Licensee) From Burial of Low-Level Waste Shipments.

J I

l ENa05URE D OCT 2 21952

.m-.,-v

.e,---

e

-.%--sm,,-.-.-ww,

l 1

l 3.

The following IE Infomation Notice was issued during the past week:

Number 82-41, Failure of Safety Relief Valves To Open At A BWR was issued October 22, 1982 to all nuclear power reactor facilities holding an operating license or construction permit.

4.

Other Items a.

Division of Reactor Programs

i. A Perfomance Appraisal Team (PAT) inspection will comence t

October 25 at the Haddam Neck facility. The inspection will involve six PAT inspectors and includes three weeks of field inspection effort.

ii. The Construction Appraisal Team (CAT) inspection continued this week at the TVA Bellefonte facility. The initial site inspection began in September 1982. This week is the final onsite inspection effort planned for this CAT inspection.

b.

Division of Engineering and Quality Assurance 1.

Division staff witnessed the vendor validation of ultrasonic testing methods on large BWR piping samples at the Battelle Memorial Institute, Columbus, Ohio. This validation and testing effort is in response to IE Bulletin 82-03, Stress Corrosion Cracking in Thick-Wall, large Diameter Stainless Steel Retirculat-ing System Piping at BWR Plants which was issued October 14, 1982.

ii. A working session was held with regional repres~entatives on October 19-20, 1982 to develop a procedure for the Regional Evaluation of NTOL's and Quality Assurance Sumary Reports.

Also discussed was the role on reporting changes to QA programs and associated NRC procedures to perfom the evaluation.

iii. The Director, DEQA and staff provided a discussion to an AIF Sub-comittee on NTOL actions regardireg the QA initiatives on October 19.

iv.

Contractural arrangements have been made for technical assistance and work has begun for two major quality assurance initiatives -

Integrated Design Inspections and the Long Tem Review.

v.

On October 22, 1982, Division staff met with Ashcroft-Hutton, Principal Inspector, United Kingdom Installation Inspectorate to discuss licensee event reporting requirements, data collection and analysis.

CCT 2 213E2 ENCLOSURE D

. c.

Division of Emergency Preparedness 1.

Division and Regional staff met October 19-21, 1932 to discuss the proposed inspection procedures for inspecting licensees' emergency j

l response facilities.

11. The Director, DEP and staff participated in the Annual Meeting of the National Organization of Test Research and Training Reactors October 18-20, 1982. The Director, DEP, gave the opening address at the meeting.

Also, a taped interview was carried on a local television station.

l ENCLOSURE D OCT 2 21922

i i

i 0FFICE OF NUCLEAR REGULATORY RESEARCH f

i Items of Interest l

Week Ending October 22. 1982 pBF The first severe fuel damage (SFD) test in the PBF at INEL is now j

scheduled for October 27. The SFD experiment consists of 3 days t

steady state irradiation (completed as of October 18) followed by

[

eight days cooling followed by the two hour transient test which is expected to reach a peak fuel temperature of 2500K.

l ACRR Debris - Coolability D-9 l

t Phase-1 of debris - coolability experiment D-9 was successfully l

perfomed in the ACRR test reactor on October 16-17. This is one in a series of in-pile experiments on the coolability limits of fission-heated LMFBR particulate core debris in sodium (simulating decay heat) in a joint program with EURATOM and Japan. In the initial l

48-hour run of phase-1 of the experiment, all objectives of the full D-9 experiment were successfully achieved. Following. a planned 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> shutdown to rest the operating crew and planning of follow-on work.

phase-2 of the experiment will be perfomed on October 19.

l The purpose of experiment D-9 was to determine the dry-out coolability limits and post dry-out behavior of a particulate debris bed in sodium i

that is vertically stratified by particle s.ize (as in settling through a pool) and that also includes very fine debris. This experiment also -.svestigated the effects on coolability of low sodium subcooling and of opening up vapor channels in the bed. This channeling process c~an substantially increase the bed coolability. but previous experiments have indicated that this pro:ess is severely restricted in stratified beds a result that experiment D-9 strongly confirms. Phase-2 of the D-9 experiment will investigate the channeling process in the stratified D-9 debris bed Results of these LMFBR debris coolability experiments are used to develop and validate debris coolability models. which are also used for LWR safety j

assessments. In the LWR Severe Fuel Damage Program experiments are underway to validate these models for LWR specific accident conditions.

l l

l ENCLOSURE E i

007 2 2 1932 l

t I

I t.

4

i t.

r ',

l i

i.

1 Hydrogen Workshop The 2nd International Workshop on the Impact of Hydrogen on Water Reactor Safety was held in Albuquerque, New Mexico on October 3-7, l

1982. Papers were presented on various aspects of hydrogen behavior i

and control in nuclear plant contalments which included: hydrogen i

transport analysis and experiments, hydrogen deflagration and detonation studies, and on various methods for mitigation the consequence of a a

i hydrogen burn. Representatives of several foreign countries, utilities.

l vendors and private research organizations participated in the meeting.

j The meeting was jointly sponsored by the NRC and EPRI.

Harold j

Denton, Director of NRR was keynote speaker.

I US/FRG Core Melt Infomation Exchance Meeting 3

The annual BMFT/USNRC Core Melt In' formation Exchange Meeting will be i

held in Karlsruhe, Germany on October 27-28, 1982. The objective of the meeting is to discuss progress made on core melt.research over the past i

This includes discussions on thermal hydraulics, fission product year.

l and aerosol behavior, containment loadings, and molten core concrete interaction. John Larkins of the Severe Accident Assessment Branch is

}

coordinating the U.S. participation in the meating.

i I

Fluid and Themal Mixing N. Zuber attended a workshop on testing and modeling fluid and thermal mixing pertaining to the PTS issue. It was sponsored by EPRI and conducted at Creare, Inc., Hanover,.NH. Demonstration tests were perfomed in the 1/5 scale f acility at Creare, designed to simulate mixing of HP* in the cold leg and downcomer under conditions of no looD flow.

Test results show good mixing due to:

Mixing in the HPI line caused by jet instability at low Froude.

a.

numbers.

b.

Counter-current flow in the cold leg.

Gravity current propagating upstream through the pump into c.

the loop seal.

Tests are in progress to determine the effect of the fluid in the lower plenum on the mixing process in the downtomer.

ENCLOSURE E OCT 2 21952

~-

a

g

' Hydrogen Transport Codes A research review meeting was held on October 15, 1982 at P-422 to j

discuss hydrogen transport codes and an advanced containment code; 1

coments from potential users were solicited. CSB/NRR indicated their interests beyond degraded core accidents are limited and they do not transport code development.

encourage strong efforts in H2 2D/3D i

Personnel from JAERI visited UCLA on October 4,1982 to exchange results obtained from the JAERI Slab Core Test facility (SCTF) and the UCLA Multipin Test facility (also of slab geometry). In t'

addition, JAERI personnel will visit Westinghouse Corporation on October 18, 1932 to exchange information on fuel bundle flow blockage effect. Both FLECHT SEASET and JAERI SCTF facilities are investigating the flow blockage effect.

Dr. I. Catton of UCLA and Dr. L. Hochreiter of Westinghouse, have been gett,ing the JAERI test reports as part of the 2D/3D Program Cooperation.

j BWR FIST BWR FIST Facility shakedown is continuing. Analysis activities include planning for heat loss testing and continued evaluation of TRAC scaling calculations. A meeting of the BWR FIST program management group is scheduled for October 26-27, 1982 in San Jose, California.

Data Bank Data from stage 3 tests of the Single Heated Bundle Facility were f

added to the data bank: Numbers 5101, 7307, and 1004. These tests investigate reflood heat transfer, core spray heat transfer, and l

l refill-reflood phenomena.

i I

RELAP5 I

The development work of RELAP5/M3D2 continues as planned. As a i

result of helpful support from the RELAP5 code developers and more control systems existing in RELAP5/ MOD 1.5, the RELAP5/M3D 1.5 analysis work of the pressurized thermal shock (PTS) task for Oconee-1 was completed on schedule at INEL. N re analysis work j

related to the PTS issue is expected.

i 1

OCT 2 21E2 ENCLOSURE E i

}

i

l

. LOFT The Quick Look Report on the last ATWS test, L9-4 was issued October 8,1982. Reports needed to complete the definition of the planned -

next test, L2-6, and dealing with fuel behavior and initial power level were issued this week in time for consideration of the LOFT Review Group meeting, scheduled October 19-20, 1982 in Idaho Falls.

A third report dealing with the nemoval of the pumo and steam generator simulators (to avoid entrapment of released fission

,i products and fuel fragments), will be delayed several weeks as j

consideration is given to a new approach to this question.

,i e

Tests are now in progress to characterize the transient behavior i

of the thermocouples contained inside the new fuel bundle to be used in the L2-6 test. This fuel was recently received from EXXON and the instrumentation is now being checked out.

The recent announcerent of the formation of a DOE-led consortium to take over operation of the LOFT testing program is causing a radical redirection of the program. NRC is cooperating closely with DOE in shif ting the lead responsibility to DOE representatives while maintaining an active role in participation in test planning.

Semiscale Modifications to the facility are almost complete.

Preparations i

are underway to begin shakedown tests and to begin the loss of power test series in late November. The loss of power test series will study various accidents and transients with concurrent loss of offsite power assumptions. After that series is complete, work will begin on a series of steam generator tube rupture tests.

ENCLOSURE E DCT g 2 1952 i

l 0FFICE OF THE EXECUTIVE LEGAL DIRECTOR ITEMS OF INTEREST WEEK ENDING OCTOBER 22, 1982 Grand Gulf Nuclear Station, Units 1 and 2 On October 20, 1982, the Atomic Safety and Licensing Board issued a Memorandum and Order in this operating license proceeding denying the late-filed petition to intervene of the State of Louisiana. Specifically, the Licensing Board con-cluded in its Order that it had jurisdiction to rule on the late-filed petition to intervene of the State of Louisiana even though the Office of Nuclear Reactor Regulation had already issued a low power operating license in this previously uncontested matter. The Licensing Board also found, in evaluating the factors enumerated in 10 CFR E 2.714(a) for late-filed petitions, that Louisiana had failed to establish good cause for its late-filing, offered no showing of its ability to make a substantial contribution to the record, and sought to expand j

the issues and delay the proceeding.

i l

OCT 2 21532 ENCLOSURE F 1

l

o ITEMS OF INTEREST OFFICE OF INTERNATIONAL PROGRAMS WEEK ENDING OCTOBER 22, 1982 Convention on the Physical Protection of Nuclear Material On October 19 the President signed into law H.R. 5228, the Convention on the Physical Protection of Nuclear Material Implementation Act of 1982. The Act amends the Federal Criminal Code to make theft of nuclar material, extortion and similar offenses involving nuclear material federal crimes. Presidential approval of this Act will now enable the U.S. to ratify the Physical Protection Convention, which was signed by the U.S. on March 3, 1980, and approved by the Senate in July 1981.

In addition to provisions covering crimes involving nuclear material, the Convention calls for adequate physical protection for nuclear material (comparable to the levels recommended in INFCIRC/225/Rev.1) during domestic use, storage and transport as well as international transport. As part of the effort to assure proper implementation of the Convention in the U.S.,

representatTVes of IP, NMSS, and ELD participated in an interagency meeting on October 20 to discuss procedural and regulatory implementing arrangements for the Convention. In addition to making minor changes to 10 CFR Parts 70, 73, and 110 as necessary to ensure that U.S. obligations under the Convention are met, appropriate U.S. interagency coordination procedural arrangements will have to be established.

Technical Coooeration with Korea Ralph Meyer, CPB, will visit the Daeduk Engineering Center the week of October 25 to lecture on fuel behavior and its role in licensing and to hold discussions on baffle jetting problems and the damage to the TMI-2 core. This visit is being carried out under the Arrangement Between the USNRC and the Ministry of Science and Technology (MOST) for the exchange of Technical Infor-mation and Cooperation in Regulatory and Safety Research Matters.

Foreign Visits to NRC On Monday a four-member Safety Analysis Code Study Mission from the Japanese Nuclear Safety Institute, headed by Dr. Masakuni Narita of the Ministry of International Trade and Industry (MITI), met with Dr. D. J. McCloskey, Manager of the Nuclear Fuel Cycle Safety Research Department, and other representatives at the Sandia National Laboratories during a tour and discussion of the develop-ment and application of reactor thermal-hydraulic safety codes at Sandia.

On Monday a 16-member Japanese delegation, headed by Professor Mamoru Akiyama of the University of Tokyo and sponsored by MITI, met with K.G. Steyer, Chief, and C. Feldman of the RES Chemical Engineering Branch, E. P. Regnier of the "L

OCT 2 2 EE2 t

I l

I Foreign Visits to NRC Cont'd NMSS High-Level Waste Licensing Branch, P. Lohaus of the NMSS Low-Level Waste i

Licensing Branch and P. Erickson of the NRR Standardization and Special Projects Branch to discuss the status of decommissioning and waste management rulemaking activities.

On Monday Dr. Hyung-Sik Chung of the Nuclear Safety Center of the Korean Advanced Energy Research Institute (KAERI) met with G. Lear, Chief, and repre-sentatives of the NRR Hydrologic and Geotechnical Engineering Branch to discuss regulatory guidelines and recent experience on the differential settlement at nuclear facilities.

On Monday and Tuesday Dr. Paul D. Parsons, Section Leader for LWR Fuels at the UK Atomic Energy Authority (AEA), met with Dr. R. R. Robins at INEL to discuss severe fuel damage experiments at PBF. On Wednesday Dr. Parsons met with Dr. H. M. Chung at Argonne National Laboratory to discuss LWR degraded core accidents and fuel behavior.

j On Monday and Tuesday Mersrs. R. L. Deruaz, P. Gully, J. L. Nigon, and H. Panek I

of the French Atomic Energy Commission at Grenoble met with M. Stanley at the i

LOFT and Semiscale faciiities at IONEL to discuss measurement techniques on l

integral test facilities used to investigate PWR behavior in accident siutations.

l On Wednesday a 22-member Japanese delegation, headed by Dr. Kinichi Torikai, Director of the Garai Research Establishment of the Japan Atomic Energy Research Institute (JAERI), met with K. G. Steyer, Chief, and C. Feldman of the RES Chemical Engineering Branch and P. Erickson of the NRR Standardization and Special Projects Branch to discuss the regulatory aspects of decommissioning of nuclea.- facilties and decommissioning technology. The delegation had con-tacted GPU directly for discussions at TMI on Tuesday, prior to coming to NRC.

On Wednesday and Thursday Dr. Donald M. Bruce, Nuclear Inspector of the UK Nuclear Installations Inspectorate (NII), met with various NRR and RES representatives to discuss (1) steam generator tube corrosion; (2) primary circuit crud prcDiems; (3) revisions to NUREG-0017; (4) source terms; (5) chemical control; (6) boric acid stress corrosion cracking of stainless steel pipework; (7) current fuel storage and refuelling pool problems; and (8) the status of supporting research in the above areas. Dr. Bruce, a member of the NII's licensing assessment team for the Sizewell B PWR, has been assigned responsibility for chemistry, corrosion, and spent fuel ponds. In connection with his visit, Dr. Bruce will travel to the Kewaunte Nuclear Plant to discuss chemistry control and to Oak Ridge and Sandia Natie.tal Laboratories to discuss NRC fission product chemistry research programs.

OCT 2 21952 ENCLOSURE G f

. i l

i Foreign Visits to NRC Cont'd j

i On Wednesday Mr. P. Lagadec, Advisor to the French National Council on Civil i

Defense, met with B. X. Grimes, Director of the IE Division of Emergency i

Preparedness, and members of his staff to discuss emergency management.

On Thursday Drs. Kofahl and Goertz, technical consultants to the German Federal Ministry of Interior (BMI), met with D. Calkins of the RES Chemical Engineering Branch to discuss the current status of decommissioning rulemaking. Drs. Kofahl and Goertz also attended the International Decommissioning Symposium in Seattle, j

prior to the NRC discussions.

On Friday Mr. W. W. Ascrof t-Hutton, Principal Inspector of the UK Nuclear Instal-lations Inspectorate (NII), met with (1) W. R. Mills Chief of the IE Events Analysis Branch, and F. Hebdon of the Office for Analysis and Evaluation of Operational Data to discuss revised LER reporting requirements, data collection i

and analysis, (2) V. Benaroya, Chief, and R. Ferguson of the NRR Chemical Engineering Branch to discuss fire protection, and (3) A. Serkiz, A. Marchese, and C. Anderson of the NRR Generic Issues Branch to discuss progress on un-resolved safety issues A-43, A-45, and A-48.

During this week Mr. Jesse Fell of the Reactor Systems Analysis-Division of the UK Atomic Energy Authority ( AEA) toured INEL to discuss RELAP 5 and supporting experiments, and LANL to discuss the TRAC code and code validation.

l l

ENCLOSURE G DCT 2 21332

  • Foreign Reports The following foreign reports were received in IP October 18-22:

(For further information contact Eva Szent-Ivany, IP, X24506.)

From Finland:

Standards and Guides for Nuclear Power Plants in Finland **

From France:

DSN - Improvements of PWR Plant Responses to Severe Hypothetical Accidents **

(Enclosure 3 of Trip Report, Visit to France, September 20-24, 1982, by D. F. Ross, Deputy Director, NRR)

From Japan:

Heat Removal by Top Spray Emergency Core Cooling **

From Sweden:

Report on Safety Related Occur rences and Reactor Trips, January 1 -

June 30, 1982**

From the U.K.:

1 News Release, dtd 09/30/82, PWR Inquiry: Paper Published on Organization and Role of the Nuclear Installations Inspectorate **

H&SE - The Work of HM Nuclear Installations Inspectorate **

From the OECD:NEA:

IRS 159.2 - Unterweser, FRG - Pilot valve failure of pilot operated main steam safety valves IRS 207 - Goesgen (KKG), Switzerland - Heavily damaged energency power diesel motor IRS 208 - Point Lepreau 1, Canada - Failure of shutdown system to actuate l

Deleted from PDR copy

    • Indicates the reports are in English ENCLOSURE G DCT 2 21952 f

.

  • Foreign Reports - Cont'd The following foreign reports were received in RES October 1-15:

(For further information contact Anita Summerour, RES, X74304.)

From the FRG:

GRS-A-709 - Investigation of the Heat Transfer Rates in the High-Pressure Phase of Medium-and Large-Break LOCAs MPA-Contract No. 810 053 - Research Project 150 353 - High Speed Tensile Tests on Large Scale Specimens.

Stage I: Model Tests and Construction of a 12 MN High Speed Tensile Machine From the U.K.:

I SRD R 198 - UK Aircraf t Crash Statistics - 1981 Revision **

SRD R 217 - Matching the Results of a Theoretical Model with Failure Rates Obtained from a Population of Non-Nuclear Pressure Vessels **

SRD R 234 - Electronic Contributions to the Transport Properties and Specific Heat of Solid U0 : An Empirical Self-2 Consistent Analysis l

AEEW R 1495 - An Experimental Study of Thermal Interaction Between Molten Uranium Dioxide and Sodium ** - PROPRIETARY I

l l

Deleted from PDR copy

    • Indicates the reports are in English l

ENCLOSURE G OCT 2 21982 I

I

_ OFFICE OF STATE PROGRAMS ITEMS OF INTEREST WEEK ENDING OCTOBER 22, 1982 Low-Level Waste Information Needs for the States OSP and Waste Management staff met on October 19, 1982 at NRC with repre-sentatives of the Department of Energy EG&G and Oak Ridge National l

Laboratory to discuss low-level radioactive waste (LLW) information needs for the States. Four major areas were discussed: transuranic contaminated i

and greater than Class C LLW; the impact on LLW sites of the LLW from decomissioning light-water reactors; the EG&G computerized LLW information retrieval system; and the economics of the transportation and disposal of j

LLW.

Status Report - Low Level Radioactive Waste Compacts i

The Department of Energy on October 19, 1982 transmitted to Senator McClure, Chairman of the Comittee on Energy and Natural Resources, its " Status Report - Low Level Radioactive Waste Compccts, As of July 1982." The NRC i

provided information to DOE in the preparation of this report which contains j

coments on the seven interstate compacts regarding low-level radioactive waste disposal. Copies of the report should become available from DOE in i

early November.

National Leacue of Cities Steve Salomon OSP, met on October 20, 1982 with the National League of Cities to discuss items of mutual regulatory interest. Current interest is foct. sed on the enforcement of regulations pertaining to the transportation of hazardous materials including radioactive materials. Within the next year, an issue that may become important is the involvement of the cities with the States in the siting of low-level radioactive waste sites primarily as related to the transportation aspects.

l DCT 0 21952 EHCLOSURE H e

=+

-,y,y.,

w.

m.,. -

,,c 4

OFFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA ITEMS OF INTEREST WEEK ENDING OCTOBER 22, 1982 Fuel Assembly Degradation While in the Spent Fuel Storage Pool AE0D completed an engineering evaluation of an event in which a fuel assembly top nozzle separated from the remainder of the fuel assembly in the spent fuel pool at Prairie Island. The mode of failure was identified as stress corrosion cracking of the 304 stainless steel top nozzle, but the root causes have not yet been identified. The primary safety concerns are 1) the mode of degradation appears to be new to fuel assemblies and occurs in the spent fuel pool, 2) the degradation may not be readily detectable, 3) the degradation resulted in separation of the top nozzle from the remainder of the fuel assembly while transferring the assembly in the spent fuel pool to new high density racks, and 4) the degradation may be generic with potential for dropped fuel assemblies and resultant fission product release. The information was transmitted to the responsible program office together with listed concerns and suggestions for their resolution.

Potential U.S. Participation in the ADRS As part of discussions potentially leading to NRC participation in the Abnormal Occurrences Reporting System (AORS) being developed by the Commission of the l

European Communities (CEC) located in Ispra, Italy, AEOD has reviewed the reporting criteria, f ormat, and computerized data storage capability. The principal concern resulting from this review is the currently projected limited degree of accessibility to the information by U.S. organizations such as INPO l

and NSAC. AEOD has pointed out the importance of assuring that major organiza-tions analyzing operational data have access to the information.

The ADRS is a data bank which collects information at a lower threshold than the current IRS system, i.e., it is designed to collect events that have or may have safety significance. The collected data, selected according to special defined criteria from either national reporting systems or directly from nuclear power plants, are stored, retrieved, analyzed, and evaluated as a whole in a centralized, structured reporting system.

l 1

OCT 2 21982 l

t

I l

l 0FFICE OF SMALL AND DISADVANTAGED BUSINESS UTILIZATION CIVIL RIGHTS t

1 Items of Interest Week Ending October 22, 1982 During the week of October 17, 1982, the Office of Small and Disadvantaged l

Business Utilization and Civil Rights (OSDBU/CR) participated in a national training conference held in Kansas City, Kansas. The training was administered l

by the National Association of Human Rights Workers (NAHRW), and was focused on approaches to combat hate / violence, employment discrimination, affirmative action, and age discriminaton, Various noted speakers addressed the conference and provided valuable informa-tion. They included the Honorable Clarence M. Pendleton, Jr., Chaiman, Com-mission on Civ11 Rights; the Honorable Antonio F. Monroig, Assistant Secretary for Fair Housing and Equal Opportunity HUD; the Honorable John Carlin, Governor, State of Kansas; and the Honorable John E. Readan, Mayor of Kansas City, Kansas.

Workshops of special interest to NRC were Employment Discrimination Affirmative Action, and Age Discrimination. The workshop leaders described ways by which Federal agencies could possibly eliminate or minimize discrimination complaints.

Some of the following areas were covered:

How to conduct work-force analyses; l

rights of age discrimination complainants and the law that governs the age i

discrimination complaint process; and ways of developing effective affirmative action plans.

I i

1 ENCLOSURE K I

'\\:.5,' %.

't 2%

.Q T-s.,

(:

I RaGIos V

'~

t, fl.

WEEKLY, REPORT ENGING 10/22/02 b

t.

~

~

pacific Gas & Electric Ocnnaar 1,.l

,., a Q '. s Diablo camon - 11 nit' 1 & 2 i ~. :,

M Unusual Event:

At 6:54 p.m., p6T'on'10/16/32, a grasis' fire-started at the north and of thef-506. 3tv switchyard..,.The*,

licensee declared an unusual event'.at'7:30 p.m.,

pDT;, and the califodnia Department of Foreistry WTi was u the f

~

scene V ocambat the fire. 'At 8:18.S.'s., #DT both 230 W e,.-

supply 1 S w to the site were.dF-emei1rimeCet;lhe request ef CDi.

he site was still supplied offsite power by.3... '

separate 500 KV circuits. The licenses secured front the unusual event at 11:10 p.m

'p6t'h thei.f.iis had 4mr$ed

m. away from the plant. and no furt%CM,$4..stru'&~ures.Was presented.

The licensee was checklde the.amorg'ency diesel generators during this period to assure availability if offsite: power was lost. At.3:45 a.m. on 10/17/82, the licensee roped-off the area where the fire started and posted a guard in order to conduct an investigation into the cause of the fire. At 8:20 a.m.

one 500 KV circuit supplying offsite power trippedt however, the site was still supplied with off-site power from 2 other 500 KV circuits. At 12:04 p.m.,

pDT, the other two 500 KV circuits tripped resulting in a loss 7

of offsite power..One emergency diesel generator in each

~~

^ of Unit 1 and 2 was brought on-line to carry safety ~.related hotel loads at 12:07 p.m., PDT. An unusual event was

- again declared by the licensee at 12:18 p.m.,

PDT, due to loss of all offsite power.

Both 230 KV supply circuits were re-energized at 4:56 p.m. and paralleled with diesels to go back on offsite power supplies.

One 500 KV line was re-energized at 10:02 p.m. and the other 2 500 KY lines ~were re-energized at 11:29 p.m.

t There were no injuries, fatalities,.or structures damaged as a result of the fire.

The fire came to the plant boundary and --

smoke detectors inside the plant were alarming.due to the smoke, concentrations.

The control room vpatilation system automatically switched to closed circuit operation mode *Nria?

the event.

~

About 1800 acres of grassland and forest were burned.

~

W e

ENCLOSURE L OCT 2 21932 s

~

\\

.v

~

.., g,

t

l l

1 3

I ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING OCTOBER 22, 1982 4

j A.

STAFF REQUIREMENTS - AFFIRMATION / DISCUSSION AND VOTE, 3:30 P.M., THURSDAY, l

OCTOBER 14, 1982, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE), Memo SECY for the Record, 10/19/82

~

l i

]

SECY-82-389 - Metropolitan Edison Company (Three Mile Island, Unit 1), Docket No. 50-289 SP (Restart)

The Commission,* by a vote of 4-1 (Commissioner Gilinsky disapproving), approved an Order as modified that addresses 1

several issues related to the TMI-l Restart Proceeding.

The Order finds that the Licensing Board did not have jurisdiction 1

to i= pose a $100,000 fine, refers the matter to staff to determine widther civil penalty proceedings should be instituted and directs staff to investigate whether the licensee made a j

material false statement when it certified that the individual j

identified as vv was. certified to take an operator license j

exam in 1979.

J (Subsequently, on October 14 the Secretary signed the Order j

with the separate views of Commissioners Gilinsky and Roberts attached.)

)i

  • Section 201 of the Energy Reorganization Act, 42 U.S.C E'5841, i

provides that action of the Commission shall be determined by a " majority vote of the members present."

Commissioner Roberts j

was not present when this item was affirmed, but had previously indicated that he would approve.

Had Commissioner Roberts been present, he would have affirmed his prior vote.

Accordingly, the formal vote of the Commission was 3-1 in favor of the j

decision.

T l

B.

SECY-82-335 - RULEMAKING TO PROVIDE SP~CIFIC AUTHORITY RELATIVE TO THE 1

i TESTING OF SAFEGUARDS SYSTEMS, COPYING OF RECORDS, AND TO SPECIFY RETENTION PERIOD FOR PHYSICAL SECURITY 3ECORDS, Memo SECY to Dircks and Kammerer, 10/19/82 This is to advise you that the Comaission has approved the proposed rulemaking in part and dis spproved it in part.

The i

Co= mission (with all agreeing) has approved the changes with regard to specifying the retention p triod for licensee physical security records (10 CFR 73.70).

The Commission i

(with Co=missioners Gilinsky, Ahearne and Asselstine agreeing) also approved the sections providing specific authority to copy and remove copies of licensee records.

The Commission (with Chairman Pal?.adino and Commissioners Ahearne and Roberts agreeing) disapproved your proposal to require 3

j licensees to perform tests of the safeguards related equipment

~

and procedures during.fnspections of nuclear power plants.

4 q

, ENCLOSURE O i

J

i

. ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING OCTOBER 22, 1982 B.

SECY-82-335 (Cont'd)

The proposed rule should be revised to reflect the above Commissioner action and return to SECY fo.r publication for comment in the Federal Register.

(EDO/RES) (SECY SUSPENSE:

11/8/82)

The appropriate Congressional Comittees should be informed.

(OCA) (SECY SUSPENSE:

11/8/82)

C.

SECY-82-380 - NRC RULEMAKING TO AMEND 10 CFR 2.201, Memo SECY to Dircks, 10/20/82 This is to inform you that the Commission by a vote of 5-0 has approved the proposal in the subject paper that 582.200 and 2.201 be amended:

(1) to authorize issuance of notices of violation (NOV's) to non-licensees and to require non-licensees to respond to NOV's, and (2) to recognize the authority of Regional Administrators or their designees to issue NOV's.

Accordingly, you should forward the final draft of the Proposed Rule to the Office of the Secretary for pub'.ication in the Federal Register and notify the appropriate Congressional Committees.

(EDO) (SECY SUSPENSE:

11/8/82)

~'

The Orfice of Inspection and Enforcement was notified of this action by telephone on October 20, 1982.

l l

l l

ENCLOSURE O f

,g,k Q

'~

o Y h k'#

IMAGE EVALUATION

'[* *S

,E,,, -

p i

l i

r 1.0 E2 M L. E 33 gi2.2

'i_~ E10 l,l f

  • b!N l

1.8

{

l.25 1.4 l

1.6 1

4 150mm 4

6" s, %,//

+ sA a lb,3; s

/

j

.x h'qNl _Y

/

h' sb %

\\

g~.,,

" C.. '

f(,{A "p%* /?s PHOTOGRAPHIC SCIENCES CORPORATION O,4 h

770 BASKET ROAD

  1. [D P.O. BOX 338 4{;

,3p,

WEBSTER, NEW YORK 14580 (716) 265-1600

S

-4 NRR MEETING NOTICES

  • October 22, 1982 li}

DOCKET APPLICANT /

DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 10/25/82 MMBB-5110 Control of heavy loads at Calvert Baltimore Gas A Elec.

D. Jaffe 10:00 am Bethesda Cliffs 1 & 2 10/25/82 50-329 OM,0L MMBB 1713 Discuss the Consumers Power pro-Constsners Power Co.

R. He.' nan 10:00 am 50-330 OM,0L Bethesda posal for independent Design Management Analysis Co.

Reviews at Midlend Plant TERA 10/27/82 50-250 P-114 Discussion of FP&L's requests for Florida Power & Light D. Mcdonald l

9:00 am 50-2'1 Bethesda exemptions from the specific Brookhaven Natl.- Lab.

l requirements of 10 CFR 50.48 and (Crystal River 3) 10 CFR 50, Appendix R 10/27/82 50-358 Zimmer Plant Discuss completion date for the Cincinnatt Gas & Elec.

L. Kintner 9:00 am Zimmer plant in light of apparent dif ficulties in completing the Quality Confirmation Program 10/27/82 50-461 MNBB-6507 Discuss the status and clarify tilinois Power Co.

J. Williams 9:00 am Pethesda positions on Clinton SER out-standing issues WNP-3 senior management ! pre l' ents s

WNP-3 L. Wheeler 10/27/82 50-508 P-110 9:00 am Bethesda a project overview to NRC senior management 10/27-28/82 50-302 Crystal River, Fla.

Discuss Radiological Environmental EG8G, FPC

5. Miner 9:00 am Technical Specifications proposed (Crystal River) i for CR-3 9

P o

PLEASE BE ADVISED THAT DAILY RECORDINGS CAN BE HEARD ON 492-T 56_

m o

  • Copies of summaries of these meetings will be inade publicly available and placed in the respective docket flie(s) in the NRC and local public doctsnent rooms.

-eu.-a----,----

u---a-_---.a---.---.

mV- -

S, to NRR MEETING NOTICES

  • DOCKET APPLICANT /

DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES' NRR CONTACT 10/27-29/82 50-352 Bechtel Power Corp.

Limerick - Instrumentation and Philadelphia Elec. Co.

H. Abelson 2:00 am 10/27

-353 221 Main St.

Control Systems Branch initial 9:00 am 10/20-29 San Francisco technical meeting 10/28/82 50-348 P-114 Review APCO's refined calculations Alabama Power Co.

E. Reeves 1:00 pm 50-364 Bethesde and methodology relating to masonry Franklin Institute walls at Farley Plant Bechtel 10/29/82 50-245 P-118 NNECO to describe inspection Northeast ~Muclear Energy J. Shea 9:30 am Bethesda technique, observations, and short (Millstone 1) and long-term potential safety i

l impilcations. Also, will discuss l

use of a clamp to assure adequate I

emergency spray water for core cooling 11/2/82 50-362 San Onofre Site Discuss issuance of Operating Southern Calif. Edison H. Rood 9:30 am San Cicmente, CA Licensing for Unit-3 11/3/82 50-331,346,348, P-118 Masonry Wall Design (IE Bulletin Interested Licensees C. Trammell 9:00 am 364,263,277, Bethesda 80-11) - Use of " Energy Balance Franklin Research Center 278,250,251, Technique" and " Arching Theory" Drexel Universal Con-325,324,317, sultants to FRC 318,336,255 (Facilities: Duane Arnold Davis-Besse 1. Farley 1/2, Monticello, Peach Bottom 2/3, Turkey Point 3/4, Brunswick 1/2, Calvert Cliffs 1/2, n,

pi Millstone 2, Palisades, Oyster Creek 1 Dresden 2/3, Quad Cities 1/2,

[;

Oconee 1/2/3, St. Lucie 1, Millstone 1, Vermont Yankee 1, Maine Yankee, E?

Ginna, Haddam Neck)

?

o PLEASE BE ADVISED TilAT DAILY RECORolNGS CAN BE ilEARD ON 492-7166

  • Copies of sunmaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.

l?

-4 t4 to cc, NRR MEETING NOTICES

  • NJ DOCKET APPLICANT /

DATE/ilME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 11/4/82 50-382 MNBB-6507 Discuss LPAL's proposed corrective toutstar.a Power & Light

5. Black 8:30 am Bethesda actions for human factors dis-Lawrence Livermore crepancies in the Waterford control room EE f2 5:

E m

o PLEASE BE ADVISED THAT DAILY RECORDINGS CAN BE HEARD ON 492-7166 J

  • Copies of summaries of these meetings will be made publicly available and placed in the respective docket flie(s) in the NRC and local public document rooms.

M VM NM55 MEETING NOTICES October 22, 1982 Division of fuel Cycle and Material Safety e

ro DOCKET ATTENDEES /

RIDATE/ TIME NUM8ER LOCATION PURPOSE APPLICANT NRC CONTACT 10/26 Willste Welding and fabrication guide.

Law. Liv. Lab C. E. Williams 9:00-5:00 5th floor conf (11.11. Woo, R. Sears)

C.E. Williams'(FC)

C. R. Chappell (FC)

11. W. Lee (FC)

D. T. Iluang (FC) 10/26 Arlington, TX Neet with RIV staff to discuss R. E. Cunningham (FC)R. E. Cunningham regionalization.

RIV staff V. Miller (FC) 10/27 71-9074 Willste Review submission for license C. E. Williams (FC)

C. E. Williams 9:00-11:00 Room 388 renewal.

John Murphy (ANEFCO) 10/27 San Antonio, TX To meet with the Air Force Radio-R.E.Cunningham(FC)

R. E. Cunningham I

isotope Committee to discuss the V. Miller (FC) feasibility of consolidating all Reps fm Air Force licenses held by military forces into a single license issued to D0D or three separate licenses issued to each of the services.

10/28-30 Phoenix, AZ Meeting with Lester Rogers R.E.Cunningham(FC)

R. E. Cunningham to develop policy position for L. Rogers NEA consideration.

1 a

1,5 r

i l

I

Is m i/ m 4

8

' October 22, 1982

-i NMSS MEETING NOTICES Da te Division of Safeguards in NJ DOCKET ATTENDEES /

DATE/ TIME NUMBER LOCATION PURPOSE APPLICANTS NRC CONTACT 11/2-4/82 Chattanooga, TN To discuss security C. Gaskin, NHSS Charles Gaskin concepts being proposed Region II Staff 427-4383 by TVA. Discussion will cover Safeguards Infor-mation, therefore, this is a closed meeting.

4 4

P8 m

T e

wm Vm O

S NMSS MEETING NOTICES ncenh,,r ??- Ion?

Divisl5n of Waste Management so m

DOCKET ATTENDEES /

PJ DATE/ TIME NUMBER LOCATION PURPOSE APPLICANT NRC CONTACT 10/25/82 Willste Bldg.,

Meeting with Engineers T. Seamans, J. Greeves, T. Seamans, Silver Spring, MD International (EI) on R. Nataraja L. Chase, WMllT; WMili Technical Assistance for V. Rajaram, EI Design Reviews 10/26-28/82 Natural Bridge Annual RES Review Meeting R. Scarano, D. Stefken, R. Pennifill, State Park, KY on Maxey Flats, KY low-R. Pennifill, WMLL WMLL Level Radioactive Waste Disposal Site 11/1-3/82 Boston Park Plaza Sixth International F. R. Cook, E. Wick, WMill; F. R. Cook, llotel, Boston, MA Sy m ostum on the E. Hall, Consultant WMill Scientific Basis for Nuclear Waste Management 11/1-3/82 Willste Bldg..,

flydrogeology Contractor's T. Vema, R. Johnson, T. Vema,

Silver Spring, MD Meeting on BWIP Issues M. Logsdon, P. Justus.

WMilT with Williams-Robinette R. Wright, WMitT; M. Gordon, and Golder Associates WMllL; L. Doyle, RES; Rowe, Brown, Cherry, Golder; I

Williams, Winter, Williams-l Robinette l

t Pa E

Et1 8

y t

e

.ii-......wn..ii--__

g October 22, 1982 w

to IE MEETING NOTICES DOCKET ATTENDEES /

DATE/ilHE nth ER LOCATION PURPOSE APPLICANT NRC CONTACT Oct. 24, 1982 NRR, Bethesda, To discuss Zion - Definition C. Berlingler, NRR I. Vi11alva Mn of 100% Power Operation

1. Vi11alva, IE F. Lentine, Zion Oct. 26, 1982 Region i To discuss management infonna-V. Stello, EDO E. Brach tion control and tracking J. Roe, EDO systems R. DeYoung IE J. Blaha, IE E. Brach, IE Nov. 2/ 1982 NRC Ops. Ctr.

NRC/ FEMA Steering Coninittee DEP Staff S. Schwartz ET Room meeting to discuss emergency FEMA Staff t

preparedness activities between the two agencies.

i i

9 P

8

!5 m

T t

J RES MEETING NOTICES October 22. 1982 tO w

SI

~

ATTENDEES /

DOCKET DATE/ TIME NUMBER LOCATION PURPOSE APPLICANT NRC CONTACT 10/21-23/82 Pottstown, PA Human Error Data Study Review T. Ryan, RES/NRC T. Ryan, RES Limerick

- Prairie, Swain, &

Guttman, Sandia Kozinsky & Barr, GPC 10/23-30/82 Halden, Norway Attend Halden Program Group J. Norberg, RES/NRC J. Norberg, R Meeting A Workshops Halden Staff Other signatory reps.

10/24-26 London UKAEA E. Edwards Costello i

10/25/82 Geo. Wash. Univ.

Meeting with Radiation Safety Radiation Safety Staff, N. McElroy,RES Washington, DC Staff to discuss survey meter Geo. Wash. Univ-,' -

calibration ristocols N. McElroy, RES/NRC 10/27/82 Seattle, WA Human Factors Society J. Jenkins, RES/NRC J. Jenkins,RE!

2 Panels - SPDS and HF Stds.

HF Soc. attendees Stuksvik K. Johannson Costello o

10/27-30 Stockholm i

10/29/82 ORNL Reytew Research Contracts K. R. Goller, RES/NRC R. Neel, RES Oak Ridge, TN R. Neel, RES/NRC Atom Sciences. Inc.

ORNL P

i

E.

y RES MEETING NOTICES October 22. 1982 in R!

ATTENDEES /

DOCKET DATE/ TIME NUMBER LOCATION PURPOSE APPLICANT NRC CONTACT _

11/2 Cologne GRS F. Reuschenback Costello 11/2-4/82 Room 013, NL Review Pr'oposed IEEE Std. on NRR personnel D. Basdekas, Classification of IAC and Electric RES personnel H. Kondic,RES Systems Important to Strefy" IEEE personnel

~

d 11/3 Karlsruhe KfK L. Malcher Costello

~

.1 I

Mason Wall Structures Franklin Instittite Burns-Kenneally 11/3 Review of INEL Program on On-Line INEL/RES/NRR G. S. Lewis RES Nicholson Lane 11/4/82 Radiation Monitors Costello

{

I D. Costes CEA Paris l

11/4-6 C. Stress Burns ACRS 11/4 Research Review Group RES. HRR,

5. S. Finn'e7

~

November 4, 1982 Phillips Building Review current 9 a.m 4:15 p.s.

Room P-110 equipment qualificattop (r$

nd personnel 9

research and go over that proposed for J

P FY83 & FY84 4

,4 Human Error Reporting System Study T. Ryan,C. Overbey,t C. Overbey,

'u RES Nicholson Lane et al, NRC 11/5/82 Coordination P. Dietz, 1HPO s

October 22, 1982 o

[$

OSP f1EETING NOTICES Hi

~

DATE/TlHE LOCATION PURPOSE ATTENDEES NRC CONTACT 10/25/82 Bethesda, Md.

Impicmentation of State of D. A. Nussbaumer, SP Part 61~by Agreement Washington State Representatives, NHSS, SP 10/29/82 Bethesda, Md.

Implementation of State of Nevada D. A. Nussbaumer, SP Part 61 by Agreement Representative, State NHSS, SP t

6 i

E P

o m

T i

w-

-w-


x-

..6'*-----

!O

' co REGIONIMEETI@, NOTICES _

0CTOBER 22. 1962 l[18 MTE

'> ~

ATTENDEES /

l DOCKET DATE/1IllE NUMBER LOCATION _

PURPOSE APPLICANT.

NRC CONTACT r.

11/1 50-272 Region I Office SALP Board Meeting -

SALP Board Members L. E. Tripp I

Salem Untts 1 and 2 0:30 a.m.

50-311 11/0 50-354 Region 1 Office SALP Board Meeting -

SALP Board Henbers I.. E. Tripp Hope Creek 0:30 a.n.

a i

e i

l I

E P8 g

m e

e l

l I

l l

e-

.e.-

e

.e

a

. nit MEcli!gi,;!ay,1,rg.s_

9.cMMr_2h 1982 g

w N

A1RilDEES/

D0CKET 0, ATE [TillE NtAIDER LOCATI0ft PURPOSE APPtlCANT ffRC C0tITACT 10/25 Mcgion !!

Discuss Technical Rockwell Inter-R. Lewis 9:00 a.m.

Office Assistance Capabilities national Corp.

and Selected Ril Staff Members 10/26 Region 11 Discuss Projected Changes R. A. Alto &

G. Troup 9:00 a.rs.

Offico in the Operation of BfM C. W. Speight, CliFP BfM Comerical Ituclear Plant; Regional Admin.

and Sciccted Ril Staff Henbers 10/26 Region 11 Florida Power Corporation flRR and Sciccted M. Sinkule 8:30 a.m.

Office SALP Board Hecting Ril Staff Mesters 10/27 Charlotte,HC DukePowerCompanj' Comissioner Asselstine, SALP Meeting Regional Adninistrator, 2:00 p.m.

and Selected Ril Staff Mesters R. Lewis 10/28 Region 11 Meeting with Florida Licensee,RA,and R. Lewis 9:30 a.n.

Office Power and Light Cospany Selected RII Staff regarding Turkey Point Members

=

P L

8 I

j

S ltEGION III F;ETING NOTICES

-4

[

October 21, 1982 g

Ri ATTENDRI$/

APPL.! CANT NftC CONTACf 00CKti PtJRPOSE

=

DATt/TI'1E ttyMDER LOCAT10pt

    • 10/27sid 50 341 Glen attyn, It, Feral plant Detrolt Edison A.S. Davis A.s. Davis i stof f s

tt00 p.m.

    • 10/28/47 5@133 Glen Ettyn, II, 8 ALP consumers Power A.B. Dewis Big Rock Point A.B.Devis & staff 10 a.'

Patigedes 10-25/82 50-354 Washington, D.C.

Coavelssion Briefing J.G. Keppler J,G.Keppler 2 M p.ia.

11/3/82.

50-237 Glen Ettyn, IL Enforcement Conf.

Coseonvestth Edison J.G. Keppler Bresden, Guad cities J.G. Keppler t staff 10:30 a.p.

50-249 2

11/3/82

$0-456 Glen Eltyn, JL Enforcement Conf.

Cowenwestth Edison A.8* Davis A.9. Davis 8 staff Braidwood 1:30 p.m.50-45T w

    • Prevleusly reported on 10/14/82 m'

MG y.

A

-