ML20046C122

From kanterella
Jump to navigation Jump to search
Forwards Temporary Change 4 to Rev 1 of PDB-F0001, COLR for Perry Nuclear Power Plant,Unit 1 Cycle 4 (Reload 3). Change Incorporates TS Amend 48,which Transfers Simulated Thermal Power Time Constant from TS to COLR
ML20046C122
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/03/1993
From: Stratman R
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046C123 List:
References
PY-CEI-NRR-1672, NUDOCS 9308090221
Download: ML20046C122 (1)


Text

. . . . -. . . . _

' '{ 'CENTErf07  !

ENERGY i D

PERRY NUCLEAR POWER PLANT Mail Address:

Robert A. Stratman -

PO Box 97 PERRY. OHIO 44081 VICE PRESIDENT - NUCLEAR .

E RY. OHIO 4 081 (216) 259-3737 August.3, 1993 $

PY-CEI/NRR-1672 L  !

-U.S. Nuclear Regulatory Commission -

Document Control Desk  ;

Vashington, D. C. 20555 i l

Perry Nuclear Power Plant .;

Docket No. 50-440 Core Operating Limits Report for the Remainder of Cycle 4 Incorporating '

the Thermal Power Time Constant i'

Gentlemen: l

' Enclosed is a copy of the Core Operating Limits Report (COLR)'for Unit 1 of.the Perry Nuclear Power Plant (PNPP). The COLR has been revised to incorporate the j simulated thermal power time constant. Transfer of this parameter from.the i PNPP Technical Specifications to the COLR was approved by the NRC in License -

Amendment Number 48. This. submittal adds a section to the COLR specifying the.

simulated thermal power time constant for the fuel designs in use in the reactor. 'i should you have any questions or require additional information, please contact -;

Kevin Donovan, Manager - Licensing and compliance at (216) 259-3737 extension 5606.  ;

Sincerely, i

/ - ),

it f

/$obert . Stratman RAS:RAL:ss  !

Enclosure l cc: NRC Project Manager 'l NRC Resident Inspector Office i NRC Region III i

i Opero'ing Companies Cleveionc Electne thurnmotmg .

W*

10!ed0 Ed:500 9308090221 930803 0 PDR ADOCK 0500 g l[ ' .

[- ,