ML20045B458

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1993 for Pnpp,Unit 1.W/930615 Ltr
ML20045B458
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/31/1993
From: Hegrat H, Stratman R
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1666, NUDOCS 9306170386
Download: ML20045B458 (6)


Text

_

i
l

'*{ CEN1rERf0R i O ENERGY D  !

PERRY NUCLEAR POWER PLANT Mail Address: f 10 CENTER ROAD PERRY, OHIO 44081 VICE PRESIDENT NUCLEAR  !

PERRY. OHIO 44081 (216) 259-3737 i

i l

June 15, 1993 PY-CEI/NRR-1666 L '

U.S. Nuclear Regulatory Commission .

Document Control Desk  ;

Vashington, D.C. 20555 ';

Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen-

)

Attached is the May 1993 Monthly Operating Report for Perry Unit 1. This  ;

report is submitted in accordance with Technical Specification 6.9.1.8.

If there are any questions, please feel free to call.

I 1

Sincerely, f i

8t h<b?%

Robe' t A. Stratman r

l RAS : DC: ss Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III Director, Office of Resource Management Ohio EPA t

OMra',ng Comp 3mes k i Cleveion: f tec! :: mammat ng '

beco Edson L

9306170386 930531 ' I{

PDR ADOCK 05000440 y R: PDR - y

--=

t

- \

i j

l i

i CLEVELAND ELECTRIC ILLUMINATING COMPANY f PERRY NUCLEAR POVER PLANT t

t l

May 1, 1993 - May 31, 1993 .

t HONTHLT OPERATING REPORT TO NRC i

t i

DOCKET NUMBER : 50-440  ;

i LICENSE NUMBER: NPF-58  ;

i i

t i

'l s

i

.1 1

l

)

i i

I i p.. ')

1 1

.- .I 4

l i

i I

i i

i 1

i l

l Table of Contents 3

I Average Daily Unit Power Level . . . . . . . . . . . . . . . . . .. 1

]

Operating Data Report .

. . . ................. ... 2 Unit Shutdowns and Power Reductions . .... ............ 3 'l

-. t l

}

l l

l d

l

.i l

1 t

.')

1

'i 1

1

Average Daily Unit Power Level DOCKET NO. 50-440 UNIT Perry-1 DATE 06/15/93 Contact H. L. Hegrat Telephone (216)259-3737 HONTH May 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MVe-Net) (MWe-Net) 1 0 17 0' 2 0 18 0 3 0 ~-

19 0 4 0 20 0 5 0 21 0-6 0 22 0 7 0 23 0 8 0 24 0 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0-13 0 29 0 14 0 30 0 15 0 31 0 16 0 e

. 3_

1

. . i

.- i Operating Data Report

~

UNIT: PERRY-1 l DATE: 06/15/93

{

OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: May 1993  !
3. Utility

Contact:

H. L. Hegrat (216) 259-3737 l

4. Licensed Thermal Power (MVt): 3579 j
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (Net MVe): 1191 l
7. Maximum Dependable Capacity (Gross MVe): 1225 i
8. Maximum Dependable Capacity (Net MVe): 1166 l
9. If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:

None '

10. Power Level To Vhich Restricted, If Any (Net MVe): 100%
11. Reasons for Restrictions, If Any: Operating License Limit }

i This Mont Yr-to-Date Cumulative i

12. Laurs In Reporting Period 744.0 3,623.0 48,515.0 ,
13. Hours Reactor Vas Critical 0.0 676.8 33,989.0 -
14. Reactor Reserve Shutdown Hours 0.0 0.0 0.0- I
15. Hours Genetator On-Line 0.0 551.4 32,830.6 l
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0  !
17. Gross Thermal Energy-(MVH) 0.0 1,741,878 112,231,849-
18. Gross Electrical Energy (MVH) 0.0 586,737 38,602,734'
19. Net Electrical Energy (MVH) 0.0 542,530 36,662,247-
20. Unit Service Factor 0.0% 15.2% 67.7%
21. Unit Availability Factor 0.0% 15.2% -67.7%
22. Unit Capacity Factor (Using MDC Net) 0.0% 12.8% 65.6%
23. Unit Capacity Factor (Using DER Net) 0.0% 12.6%- 63.4%
24. Unit Forced Outage 7+?te 100.0% 74.3% -11.8%
25. Forced Outage Hout 744.0, 1,591.6 4,382.7
26. Shutdowns Schedule. ' ext 6 Months (Type, Date and Duration of Each):

None

27. If Shut Down at end of Report Period, Estimated Date of Startup:

PNPP Unit 1 Generator was synchronized to the grid on June 2, 1993-a CODED /7680/SS r

,-s, a UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50-440 /

UNIT NAME Perry - 1 REPORT MONTH okw 1993 DATE ng /1c;/97 CONTACT n _ r.. Mc m-M TELEPHONE (216)259-3737 1

w4 LJ 5- m E "t Licensee g gn Cause and Corrective No. Date Q 'd C g yO { Event 5% 5.g Action to R gg g 5 y @h Report R] @O Prevent Recurrence

g g 8 j mu- g H-S5 E No.

93-02 03/26/93 F 744 A 2- 93-010 173 PSX The unit rennined shutdown throughout the nonth due to maintenance activities following the service water (P41) pipe nipture on burch 26, 1993

SUMMARY

During May, 1993, Perry-1 began and ended the ncnth shutdown due to maintenance activities following the mrvice water pipe n2pture on March 26, 1993. The generator was synchronized to the grid on June 2, 1993.

' F: iorced deason: . .

Method: Exhibit'C-Instructions for S: Scheduled .A-Equipment Failur: .( Explain) 1-Manual Preparation of Data Entry B-Maintenance or T.rst 2-Manual Scram Sheets for Licensee Event C-Re fueling _

3-Automatic Scram Report (LER) File (NUREG1022)

D-Regulatory Restriction 4-Continued E-Operator Training & 5-Reduced-Load 5 Exhibit I-Same Source

' License Examination- 9-Other F-Administrative t G-Operationni Error.(Explain)'

li-Other'(Explain)

,-_.,-E_,_ ..s ,-w v.<-,,-w.-- - < < , , , _ , - . . --- - - - , . _-em. ,v..-w< ' . - -r-+,w--c--+--ee..-ww--..we,,w-.+,w-ve-e, -ws.-m,r-.ee, w w --u -ww. v ,--w w -- edw+-,,=- w E w ,e **ww--.- w ww w ,,. --,w.w w . w w. ew i ,w ,v, ,,hv +