Monthly Operating Rept for Jan 1996 for Pnpp Unit 1
ML20097G490
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/31/1996
From: Nueman G, Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2023, NUDOCS 9602210267
Download: ML20097G490 (6)


Text

l .

CENTERNHt

. ENERGY PERRY NUCLEAR POWER PLANT il Address: E to CENTER ROAD VICE S DENT PERRY, OHto 44081 PERRY, OHIO 44081 NUCLEAR (216) 259-3737 February '13, 1996 PY-CEI/NRR-2023L

. United States Nuclear Regulatory Commission Document Control-Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Honthly Operating Report Gentlemen Attached is the January 1996 Honthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very ly-yours 4

Donald C. Shelton GMN sc Attachment cc NRC Project Manager NRC Resident Inspector Office NRC Region III 21Anos 9602210267 9601.31 PDR ADOCK 05000440 R PDN Ope'a'mg Compon es

' ClewichJ Electne thumco'*g l ,

Toledo Edison j

+

)

i

1 l

1 CLEVELAND ELECTRIC ILLUMINATING COMPANY j PERRY NUCLEAR POWER PLANT January 1, 1996 - January 31, 1996 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 l

l

)

I i

s 4

5

,s .

A -

1 i

1 i

l Table of Contents I

Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . . . . 1 Operating Data Report . ....-............ .... ..... 2

........ 3

- Unit Shutdowns and Power Reductions . ... ...... .

t I

a S

4

+

h 4

i i

e $

s 4

4 5

5- .

4 4

(

, *:p ,

[

4 Y

I

AVERAGE DAILY LEIT POWER LEVEL DOCKET NO. 50-440 UNIT Perry One DATE 2/15/96 CONTACT G.M.Neuman TELEPHONE (216)280-5815 M0lmi January 19 %

DAY AVERAGE DAILY PORR IJMIL DAY AVERAGE DAILY PORR IJIVEL (MWe-Net) (MWe-Net) 1 1002 17 911 I

2 996 18 914 995 19 922 l 3

4 990 20 921 5 984 21 897 6 979 22 909 7 936 23 905 8 971 24 900 9 960 25 899 10 958 26 582 11 951 27 0 12 944 28 0

~

13 939 29 0 14 905 30 0 15 942 31 0 16 922

OPERATIIE IRTA REP (Mtf INIT: Perry One DATE: 2/15/96 l

OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: January 19%
3. Utility

Contact:

G.M.Neuman

4. Licensed Thermal Power (MWt): 3579
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (net We): 1191
7. Maximum Dependable Capacity (Gross MWe): 1225 8 .' Maximum Dependable Capacity (Net MWe): 1166

. 9. If Changes Occur in capacity Ratings (Item Numbers 4 through 8) Since .

Last Report, Give Reasons: l None

10. Power Level to Which Restricted, if any (Net MWe): 100%
11. Reasons for Restrictions, if any: Operating License I

This Month Yr-to-Date Cumulative

12. Hours In Reporting Period 744.0 744.0 71,916.0
13. Hours Reactor was Critical 626.7 626.7 50,935.1
14. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 625.2 625.2 49,089.1
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross Thermal Energy (MWH) 1,806,763 1,806,763 166,883,855
18. Gross Electrical Energy (MVH) 608,929 608,929 57,215,000
19. Net Electrical Energy (MVH) 577,443 577,443 54,374,090
20. Unit Service Factor 84.0% 84.0%- 68.3%
21. Unit Availability Factor 84.0% 84.0% 68.3%
22. Unit Capacity Factor (using MDC Net) 66.6% 66.6% 65.4%
23. Unit Capacity Factor (Using DER Net) 65.2% 65.2% 63.5%
24. Unit Forced Outage Rate 0.0% 0.0% 10.5%
25. Forced Outage Hours 0.0% 0.0 5,779.1
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

27.- If Shutdown at end of Report Period, Estimated Date of Startup:

March 28, 1996

4 INIT SHUIDOWNS AM) POWER REDUCTIONS .

REPORT MONTH Janaury 1996 -

D0GET NO. 50-440 -

INIT One -

NAME Perry One DATE 2/15/%

CONTAcr G.MJeuman TELEPHONE (216)280-5815 NO. DATE TYPE DLRATION REASON METHOD LER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 4 4 5 REClRRENCE 96-01 1/27/% S 118.8 C 1 N/A N/A N/A Refuel Outage 15

SUMMARY

Perry Unit One continuect to coastdown through the month of Janaury 1996 to RFO-5. The refuel outage started at 0110 on 1/27/% and continued through month's end.
1. TYPE: 2. REASON: 3. METHOD 4. EXHIBIT G- Instructions F Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (IER) file D-Regulatory Restriction 4-Continued (NLREG 1022)

E-Operator Training & 5-Reduced load License Examination 9-Other 5. EXHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain) i

. . _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ - . _ . _ _ . -.