l CENTERf0R ENERGY PERRY NUCLEAR POWER PLANT Mail Address: Donald C. SheltOn 10 CENTER ROAD SENIOR VICE PRESIDENT RR , O 10 44081 PERRY, OHIO 44081 NUCLEAR (216) 259-37J7 March 15, 1996 PY-CEI/NRR-2036L United States Nuclear Regulatory Commission Document Control Desk >

Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen:

Attached is the February 1996 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very truly your ec.

for Don d C. Shelton GMN sc Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III 9603200165 960229 PDR ADOCK 05000440 R PDR Opero'mg Compan.es C: eve:aN Eiec"'c tNmmot ng ) j Toledo Ed son

~

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT February 1, 1996 - February 29, 1996 ,

MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 l

LICENSE NUMBER: NPF-58 i

l l

I

,_7

Table of Conten_ts Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . . . . 1

' Operating Data Report .......................... 2 Unit Shutdowns and Power Reductions ............. ...... 3 1

l l

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-440 UNIT Perry One DATE 3/15/96 CONTACI G.M.Neuman TELEPHONE (216)280-5815 MONTH February 1996 g AVERAGE D&ILY POWER MVEL M AVERAGE DAILY POWER IEVEL QWe-Net) (MVe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 '

12 0 28 0  ;

13 0 29 0 14 0 30 N/A 15 0 31 N/A 16 0 l

OPERATING DATA REPORT UNIT: Perry One DATE: 3/15/96 OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: February 1996
3. Utility contact: G.M.Neuman
4. Licensed Thermal Power (MWt): 3579
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (Net MWe): 1191
7. Maximum Dependable Capacity (Gross MWe): _1225
8. Maximum Dependable Capacity (Net MWe): 1166
9. If Changes Occur in capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level to Which Restricted, if any (Net MWe): 100%
11. Reasons for Restrictions, if any: Operating License This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 696.0 1440.0 72,612.0
13. Hours Reactor was Critical 0 626.7 50,935.1
14. Reactor Reserve Shutdown Hours 0 0.0 0.0
15. Hours Generator On-Line 0 625.2 49,089.1
16. Unit Reserve Shutdown Hours 0 0.0 0.0
17. Gross Thermal Energy (MWH) 0 1,806,763 166,883,855
18. Gross Electrical Energy (MWH) 0 608,929 57,215,000
19. Net Electrical Energy (MWH) 0 577,443 54,374,090
20. Unit Service Factor 0 43.4% 67.6%
21. Unit Availability Factor 0 43.4% 67.6%
22. Unit Capacity Factor (Using MDC Net) 0 34.4% 64.7%
23. Unit Capacity Factor (Using DER Net) 0 33.7% 62.9%
24. Unit Forced Outage Rate 0.0% 0.0% 10.5%
25. Forced Outage Hours 0.0% 0.0% 5,779.1%
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Entered Refuel Outage #5, on 1/27/96 @l10

27. If Shutdown at end of Report Period, Estimated Date of Startup:

March 28,19%

_3__

INIT SHUIDOWNS AIO POWER REDUCTIONS . ' *. *'

REPORT M0lG11 February 1996 .

D0GET NO. 50-440 INIT One NAME Perry One DATE 3/15/%

CONTACT G.M.Neuman TEMPHONE (216)280-5815 NO. DATE TYPE DWLATION REASON METHOD IER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 8 4 5 RECtRRENCE

%-01 1/27/% S 6%.0 C 4 N/A N/A N/A Refuel Outage #5

SUMMARY

Perry Unit One continued Refuel Outage 65 activities through the month.
1. TYPE: 2. REASON: 3. METHOD 4. EXHIBIT G- Instructions F: Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) file D-Regulatory Restriction 4-Continued (NLREG 1022)

E-Operator Training & 5-Reduced load License Examination 9-Other 5. EXHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain)