PY-CEI-NRR-2014, Monthly Operating Rept for Dec 1995 for Perry Nuclear Power Plant

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1995 for Perry Nuclear Power Plant
ML20096D606
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/31/1995
From: Neuman G, Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2014, NUDOCS 9601190195
Download: ML20096D606 (6)


Text

. .- - .-

CENTERf0R ENERGY PERRY NUCLEAR POWER PLANT Mail Address: DOnski C. ShGitOM 10 CEMER ROAD SENIOR VICE PRESIDENT RR , O 10 44081 PERRY, OHIO 44081 NUCLEAR (316) 259-3737 January 15, 1996 PY-CEI/NRR-2014L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen:

Attached is the December 1995 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Kloosterr:an, Manager - Regulatory Affairs at (216) 280-5833.

Very tr ly yours, lf e J- C. S for nald C. She ton 1

GMN:sc Attachment cc: NRC Project Manager Nhc Resident Inspector Office i NRC Region III 9601190195 951231 PDR ADOCK 05000440 R PDR auccqg

, j Opera'mg Compcmes CleveionJ Electnc mummchng / g \

10se00 EC son

\

, . , j Y

l 4

I s

l

,j-CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT December 1, 1995 - December 31, 1995 ,

MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 I

l

. m - . - . . . _ - - .. _ - . _ . . _ . . ~ . . . . . _ . .- . . - . .. -, ... _ .. -. ... - _ _._ . _. _ _ _ _ . _ . , .,

l 1

l I

i i

j 1

l i

Table of Contents -!

l Average Daily Unit Power Level . . . . . . , , , , , , , , , , , , , , , , i l 1

Operating Data Report ........................... 2 I Unit Shutdowns and Power Reductions . . . .. .. , , , ,, , , , , , , , ,'3 q i

i 1

i i

l l

4 1

l j

r- ..e - - -~- -- - , - - ,

AVERAGE DAILY UNIT PO'4'ER LEVEL DOCKET NO. 50-440 J UNIT Perry One  !

DATE 1/15/96  !

CONIACT G.M.Neuman l TELEPHONE (216)280-5815 NONIH December 1995 MY AVERAGE DAILY POWER MVEL DAY AVERAGE MILY POWER MVEL (MVe-Net) (MVe-Net) 1 1154 17 1068 2 1146 18 1070 3 1142 19 1065 i l

4 1139 20 1%1 5 1132 21 1057 6 1129 22 1052

~

7 1125 23 1049 8 1121 24 1037 9 1074 25 1039 10 1114 26 1035 11 1103 27 1030 12 1098 28 1025 13 1087 29 1020 14 1084 30 998 15 1083 31 1006 16 1080

  • ' ~
  • OPERATING DATA REPORT UNIT: Perry One DATE: 1/15/96 OPERATING STATUS
1. Docket: 50-440
2. Reporting Period: December 1995
3. Utility

Contact:

G.M.Neuman

4. Licensed Thermal Power (MVt): 3579
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (net MWe): 1191
7. Maximum Dependable Capacity (Gross MVe): 1225
8. Maximum Dependable Capacity (Net MVe): 1166
9. If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level to Which Restricted, IF any (Net MVe): 100%
11. Reasons for Restrictions, IF Any: Operating License This Month Yr-to-Date cumulative
12. Hours In Reporting Period 744.0 8,760.0 71,172.0 .
13. Hours Reactor was Critical 744.0 8,377.0 50,308.4 l
14. Reactor reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 744.0 -

8,175.9 48,463.9

16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross thermal Energy (MVH) 2,438,621 28,081,186 165,077,092
18. Cross Electrical Energy (MVH) 841,353 9,556,325 56,6C6,071
19. Net Electrical Energy (MVB) 802,040 9,111,820 53,796,647
20. Unit Service Factor 100.0% 93.3%- 68.1%
21. Unit Availability Factor 100.0% 93.3% 68.1%
22. Unit Capacity Factor (using MDC Net) 92.5% 89.2% 65.4%
23. Unit Capacity Factor (Using DER Net) 90.5% 87.3% 63.5%
24. Unit Forced Outage Rate 0.0% 6.7% 10.7%
25. Forced Outage Hours 0.0% 584.1 5,779.1
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

January 27, 1996, Refuel Outage #5. 62 day duration

27. If Shutdown at end of Report Period, Estimated Date of Startup:

tNIT SIRTIDOWNS AND POWER REDUCTIONS REPORT MONTH December 1995 ,'

D0GET NO. 50-440 LNIT One NAME Perry One ,'

DATE 1/15/%

CONTACT G.M.Neuman TELEPHONE (216)280-5815 NO. L%TE TYPE DURATION REASON METHOD LER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 # 4 5 RECURIURCE

SUMMARY

Perry Unit One continued to coastdown through the month of December 1995 to RFO-5. The unit was at approximately 86% at month's end.
1. TYPE: 2. REASON: 3. METHOD 4. EXHIBIT G- Instructions F: Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) file D-Regulatory Restriction 4-Continued (NUREG 1022)

E-Operator Training & 5-Reduced load License Examination 9-Other 5. EXHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain)

-_ _ _ _ _ - _ - - - _ - - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _