PY-CEI-NRR-2158, Monthly Operating Rept for March 1997 for Pnpp

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for March 1997 for Pnpp
ML20137W637
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/31/1997
From: Coon H, Myers L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2158, NUDOCS 9704180163
Download: ML20137W637 (4)


Text

.

l

<. C$ Rgi Power Generation Group

Petry Nuclear Power Plant ' Mail Address: 216-2846915 Law W. Myers 10 corder Road RO. Box 97 FAX: 216-280-8029 Vice President Perry. ONo 44081 Perry. OH 44081 e

P April 14,1997 PY-CEl/NRR-2158L ,

United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant .

Docket No. 50-440 License No. NPF-58  ;

Monthly Operating Report Gentlemen:

Attached is the March 1997 Monthly Operating Report for Perry Unit 1. Page 1 is the Average Daily Unit Power Level, page 2 is the Operation Data Report, and page 3 is the Unit Shutdowns and Power Reductions Chart. This report is submitted in accordance with Technical Specification 5.6.4. y If you have questions or require additional information, please contact Mr. llenry L. Hegrat, Manager - Regulatory Affairs at (216) 280-5606.

Very truly yours, I

&O ff /

HMC:s l Attachment

. cc: NRC Region 111 Administrator  !

NRC Project Manager i NRC Resident inspector  ;

w

'9704180163 970331

= ^=" ""S*Ji appupppppp5 j

[ , i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-440 UNIT Pernt One DATE 4/14/97 CONTACT H. M. Coon TELEPHONE (216) 280-5434

+

MONTH Merch 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne0 1 1181 17 1191 2 1190 18 1195 3 1193 19 1197 4 1192 20 1195 5 9 11.92 21 1188 6 1194 22 1195 7 1195 23 1197 s 8 1193 24 1196 9 903 25 1188 i

10 11gg 26 1192 ,

11 1192 27 1?!I 12 1194 28 1183 13 11Q5 29 1186 14 1190 30 1187 15 1195 31 1194 16 11QQ page1 i

l

,. [ .

  • . OPERATING DATA REPORT UNIT: Perry One DATE: 4/14/97

' 1. Docket: 50-440

2. Reporting Period:J!ard 1997

'3. Utility

Contact:

H M. Coon 4 Licensed Thermal Power (MWt): 3179

5. Nameplate Rating (Gross MWe): j.210

! 6. Design Electrical Rating (Net MWe): 1191 ,

7. . Maximum Dependable Capacity (Gross MWe): 12j.2
8. . Maximum Dependable Capacity (Net MWe):jj.QQ
9. If Changes Occur in Capacity Ratings (item Numbers 4 through 8) Since Last Report, Give Reasons:

- d!B

10. Power Level to Which Restricted, if any (Net MWe): 100 %
11. Reasons for Restrictions, if Any: Operatina License This Month Yr-to-Date Cumulative
12. Hours in Repo'rting Period 744 0 2.160.0 82.116 0
13. Hours Reactor was Critical 744 0 2.104 2 59.193.5
14. Reactor Reserve Shutdown Hours 00 00 0.0
15. Hours Generator On-Line -__

744 0 2.068.7 57.207.0

16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross Thermal Energy (MWtH) 2.640.943 7.247.353 195.290.322
18. Gross Electrical Energy (MWeH) 922.395 2.515.520 66.967.297 5
19. Net Electrical Energy (MWeH) 879.695 2.396.038 63.665.639
20. Unit Service Factor 100.0 % 95 8% 69.7 %
21. Unit Availability Factor 100.0 % 95.8% 69.7 %
22. . Unit Capacity Factor (Using MDC Net) 101.9 % 95.6 % 67.0 %
23. Unit Capacity Factor (Using DER Net) 99 3 % 93.1 % 65.1 %
24. . Unit Forced Outage Rate 00% 42% 98%

25.- Forced Outage Hours 0.0 91.3 6.193.0  ;

l

26. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): Refueling Outage, i starting September 12,1997 for 37 days.

. 27. If Shutdown at end of Report Period, Estimated Date Of Startup: N/%

i

}

page 2

]

I p

1

~i

UNIT SHUTDOWNS AND POWER REDUCTIONS _'

REPORT MONTH - MARCH 1997 '.

DOCKET NO. 50-440 UNIT one NAME Perry One DATE 4/14/97 CONTACT H. M. Coon TELEPHONE C216) 280-5434 NO. DATE TYPE DURATION REASON METHOD LER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 8 4 5 RECURRENCE 97-03 3/9/97 S B 5 PLANNED: Rod Sequence Exchange

SUMMARY

Perry Unit One remained on-line the entire month of March,1997
1. TYPE: 2. REASON: 3. METHOD: 4. EXHIBIT G-Instructens F: Forced A-Equiprnent Failure (explain) 1 - Manual for preparation of data S: Scheduled B - Maintenance or Test 2- Manual Scram entry sheets for Licensee C - Refueling 3 - Automatic Scram Event Report (LER) file D - Regulatory Restriction 4 - ContryJed (NUREG 1022)

E - Operating Training & 5- Reduced Load License Examinaton 9 - Other 5. EXHIBIT 1 - Same Source F- Administative G - Operational Error (explain)

H-Other (explain) page 3

_ _ _ _ - _ _ _ - _ - _ _ - - _ . - _ - - _