PY-CEI-NRR-2189, Monthly Operating Rept for June 1997 for Perry Nuclear Power Plant,Unit 1

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1997 for Perry Nuclear Power Plant,Unit 1
ML20141H200
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/30/1997
From: Coon H, Hegrat H
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, PY-CEI-NRR-2189, NUDOCS 9707220094
Download: ML20141H200 (3)


Text

.

~

CENT REOR

  • ENERGY ,

. Power Generation Group Perry Nuclear Power Plant Mail Address: 216 259-3737 10 Center Road P.O. Box 97 FAX: 216-28M002 Perry, Ohc 44081 Perry, OH 44081 l

July 15,1997 PY-CE!/NRR-2189L l

United States Nuclear Regulatory Commission l

Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant '

Docket No. 50-440 License No. NPF-58 Monthly Op< . ting Report Ladies and Gentlemen:

Attached is the June 1997 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating l Data Report and page 2 is the Unit Shutdowns and Power Reductions Chart. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02 " Revised l Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Mr. Ital Coon at (216) 280-5434.

Very truly yours,  ;

u y4. & -

Henry L. Hegrat A4y Manager - Regulatory Affairs }

IIMC:s Attachment cc: 'NRC Region til Administrator NRC Project Manager NRC Resident inspector 9fd fiM 4 , m ao ~

llllililllll[lgill#lll Jig llll DR ADOCK 05000440

  • * =

PDR

, OPERATING DATA REPORT UNIT: Perry DATE: 7/15/97 l

1. Docket: 50-440
2. Unit Name: Perry Nuclear Power Plant
3. Reporting F eriod: June 1997
4. Utility

Contact:

H M. Coon

5. Telephone: 216-280-5434
6. Design Electrical Rating (Net MWe): 1191
7. Maximum Dependable Capacity (Net MWe): 1160 This Month Yr-to-Date Cumulative
8. Hours Reactor was Cntical 375 1 3.924 3 61.031.9
9. Hours Generator On-Line 346.3 3.878 0 59.016.3
10. Unit Reserve Shutdown Hours 00 0.0 00
11. Net Electrical Energy (MWeH) 365.718 4.450.043 65.719.644 I

l l

l

)

i i

i 1

i 4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - JUNE 1997 DOCKET NO:_5_0-440 NAME: Perry Nuclear Power Plant DATE: 7/15/97 CONTACT: H. M. Coon TELEPHONE: (216) 280-5434 5 No. Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence Date 1 Hours 2 3 97-06 6/5 F 170.9 A 3 Forced: Auxiliary transformer tnp due to fault in terminal box. Several unrelated NRC items 202.7 F were also addressed before startup.

SUMMARY

Peny Unit One was on-line until 6/5, when an automatic scram was caused after the trip Cf the unit one auxiliary transformer.

The unit was synchronized to the grid on 6/21/97 and remained on-line for the remainder of the month.

1. TYPE: 2. REASON: 3. METHOD:

F: Forced A - Equipment Failure (explain) 1 - Manual S. Scheduled B - Maintenance or Test 2- Manual Scram C - Refueling 3- Automatic Scram D - Regulatory Restriction 4 - Continued E - Operating Training & 5 - Reduced Load License Examination 9 - Other F- Administrative G - Operational Error (explain)

. H-Other (explain)

. 2

?