Text

-.

^

' CENTER 00R ENERCY Power Generation Group Pony Nuclear Power Ptart Mad Address: 216 259 3737 to Certer Fbad P.O. Box 97 FAX: 216-200 8002 Peny. Orso 44 cent Peny, oH 44081 September 10,1997 PY-CEl/NRR-2213L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 l Perry Nuclear Pe er Plant Docket No. 50-440 License No. NPF-58 hionthly Operating Report l

Ladies and Gentlemen:

Attached is the August 1997 hionthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns and Power Reductions Chart. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, " Revised Contents of the hionthly Operating Report."

If you have questions or require additional information, please contact hir. !ial Coon at (216) 280-5434.

Very truly yours, L

{ Mrs M)

  • Henry L. I grat hianager - Regulatory Affairs j

Hh1C:s Attachment f 2

cc: NRC Region til Administrator NRC Project hianager NRC Resident Inspector 9709170362 970831 PDR ADOCK 05000440 R PDR

c. 4 YS ^;

ll1.14lllll10lliW1.1!!111.11ll10illl

OPERATING DATA REPORT UNIT: Perry DATE: 9/9/97

1. Docket 50-440
2. Unit Name: Perv Nuclear Power Plant
3. Reporting Period; Auaust 1997
4. Utility

Contact:

H M Coon

5. Telephone: 216-280-5434
6. Design Electrical Rating (Net MWe)- 1191
7. Maximum Dependable Capacity (Net MW6: 11kQ This Month Yr-to-Dalg Cumulative
8. Hours Reactor was Cntical 744 0 5.430 3 62.519.,g
9. Hours Generator On-Line 728 7 5.350.7 60.489 0 1

l 10. Unit Reserve Shutdown Hours 00 00 00

11. Net Electrical Energy (MWeH) 816.422 6.117.649 67.387.250 1

UNIT SHUTDOWNS AND POWER REDUCTIONS , -

REPORT MONTH - AUGUST 1997 ,

DOCKET NO: 50-440 NAME: Pefiv Nuclear Power Plant .

DATE- 9/9/97 CONTACT: H. M. Coon TELEPHONE- r216) 280-5434 No. Date Tyre Duration Reason Method Cause and Cor ecbve Action to Prevent Recurrence 1 Hours 2 3 97-07 8/15/97 F 15.3 A 9 The turtme was taken off-line to repair an EHC leak.

97-08 8/2497 S O F 5 System Operaung Ceder-nurumum load requirements

SUMMARY

Perry Unit One was on4ne for 728.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. The turtine was taken off4ne on 8/1597 at 1533 to repar an EHC leak The unit was sp a m ad to the grid on 8/16 at 0652 and at 100% power on 8/17 at 0451. The unit remamed at 100% at months end.
1. TYPE: 2. REASON: 3. METHOD:

F: Forced A - Equipment Fadure (eqAain) 1 - Manual S: Scheduled B-Maintenance or Test 2- Manual Scram C - Refueling 3- Automahc Scram D - Regulatory Restriction 4- Conhnued E - Operatry Training & 5- Reduced Load License Emu A u. 9 - Other F- Admuvstrabve G-Operabonal Error (explain)

H-Other (explain) 2

)