Monthly Operating Rept for June 1995 for Perry NPP
ML20086K140
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/30/1995
From: Neuman G, Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1967, NUDOCS 9507200029
Download: ML20086K140 (6)


Text

-. _. . _ . . _ . _ _ .. _ . _ . _ _. _ _ _ _ _ _ _ . - _ - _ _ _ _ _ _ _ - _

a CENTE8 HOR*

ENERGY PERRY NUCLEAR POWER PLANT Mail Address:

N O VICE PR S DENT 10 CENTER ROAD PERRY, OHIO 44081 NUCLEAR PERRY, OHIO 44081 (216) 259-3737 July 14, 1995 PY-CEI/NRR-1967L United States Nuclear Regulatory Commission Document Control Desk Vashington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen Attached is the June 1995 Honthly Operating Report for the Perry Nuclear Power Plant, Unit 1. This report is submitted in accordance with Technict1 Specification 6.9.1.8.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very truly yours, cY r [ e GMN:sc Attachment cc: ?GC Project Manager NRC Resident Inspectors Office NRC Region III I l

.n,n

. ,. U()a '.I cwa ~;cr wes cwec- Em c eec-;

N' f W 9507200029 950630 PDR ADOCK 05000440 yMY R PDR

///

, 1 ,

. I l

l l

l CLEVELAND ELECTRIC ILLUMINATING COMPANY l PERRY NUCLEAR POWER PLANT June 1, 1995 - June 30, 1995 i

MONTHLY OPERATING REPORT TO THE NRC DOCKET NUMBER : 50-440 i LICENSE NUMBER: NPF-58

(

i h

8 h

s i

t I

I i

'l l

1

r l

Table of Contents Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . . I r

Operating Data Report . . . . .... ... .... ..... .... 2 Unit shutdowns and Power Reductions . ....... ......... 3 i

I I

I i

l 4

I I

g  :

  • 4 4

AVERAGE DAILY UNIT POVER LEVEL DOCKET NO. 50-440 UNIT Perry One DATE 7/14/95 CONTACI G.M.Neuman TELEPHONE (216)280-5815 MONTH June 1995 MY AVERAGE MILY POWER LEVEL DAY AVERAGE MILY POWER 12 VEL i (MWe-Net) (MWe-Net) '

1 1149 -

17 1157 )

2 1143 18 1152 i 3 1061 19 1148 4 1043 20 1146 5 1152 21 1155 6 1143 22 1156 7 1140 23 1150 8 1157 24 1155 9 1162 25 1153 10 1156 26 1150 11 1158 27 1148 12 1166 28 1147 13 1165 29 1149 14 1160 30 1149 15 1164 31 N/A 16 1164 i

I i

- . , _ .. +-- . _ . - _ _ _ _ . - - - - . - -

I 1

.  : . . l

  • 1 l

.- l 1

OPERATDC DATA REPORT UNIT: Perry One DATE: 07/14/95 OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: June 1995
3. Utility

Contact:

G.M.Neuman

4. Licensed Thermal Power (MVt): 3579
5. Nameplate Rating (Gross MVe): 1250
6. Design Electrical Rating (net MVe): 1191
7. Maximum Dependable Capacity (Gross MVe): 1225
8. Maximum Dependable Capacity (Net Mwe): 1166
9. If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level to Which Restricted, IF any (Net MVe): 100%
11. Reasons for Restrictions, IF Any: Operating License f

This Month Yr-to-Date Cumulative

12. Hours In Reporting Period 720.0 4,343.0 66,755.0
13. Hours Reactor was Critical 720.0 4,189.2 46,119.6
14. Reactor reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 720.0 4,103.6 44,391.6
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross thermal Energy (MVH) 2,562,233 14,214,387 151,210,292
18. Gross Electrical Energy (MVH) 864,329 4,855,856 51,905,602
19. Net Electrical Energy (MVH) 825,532 4,635,104 49,319,931
20. Unit Service Factor 100.0% 94.5% 66.5%
21. Unit Availability Factor 100.0% 94.5% 66.5%
22. Unit Capacity Factor (using MDC Net) 98.3% 91.5% 63.9%
23. Unit Capacity Factor (Using DER Net) 96.3% 89.6% 62.0%
24. Unit Forced Outage Rate 0.0% 5.5% 10.9%
25. Forced Outage Hours 0.0 239.4 5,434.4
26. Shutdowns Scheduled Over Next 6 Months (Type, Dr.te, and Duration of Each):

None

27. If Shutdown at end of Report Period, Estimated Date of Startup:

N/A

[ NIT SHUIV0VNS AND POWER REDUCTIONS .

REPORT MONTH JINE 1995 -

D0GET NO. 50-440 .

LNIT NAME Perry One .

DATE 7/14/95

  • CONTACE G.M.Neuman TELEPHONE (216)280-5815 NO. DATE TYPE DURATION REASON METHOD LER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 # 4 5 RECURRENCE

SUMMARY

Perry Unit One started and ended the month at full power.
1. TYPE: 2. REASON: 3. METHOD 4. EXHIBIT G- Instructions F: Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) file D-Regulatory Restriction 4-Continued -(NUREG 1022)

E-Operator Training & 5-Reduced load License Examination 9-Other- 5. EXHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain)