.OPERATIN3 DATA REPORT-UNIT: Eeny.

DATE: 1/12/98

- 1.

Docket; $0:41Q r

2.

Unit Name: Perry Nuclear Power Pig

. 3.

Reporting Period: December 1997 4.

Utility Contact;

.H.M. Coon-

- 5..

Telephone: 216-280-5434 6.

Design Electrical Rating (Net MWe):

1191 7.

Maximum Dependable Capacity (Net MWo):

1100 This Month Yr-to-Date Cumulative.

8.

Hours Reactor was Critical 693.5 7.415.4 64.504.7 9.

Hours Generator On-Line 673.7 7.181.1 61.319.4 10.

- Unit Reserve Shutdown Hours 0.0 0.0 0.0 782.008 8 151.829 69.421.430 11.

Net Electrical Energy (MWeH) _

i R.

FDR s

.t

,.p..

~.

UNIT SHUTDOWNS AND POWER REDUCTIONS i-REPORT MONTH - DECEMBER 1997 DOCKET NO: 50-440 NAME PNrv Nuclear Power Plant DATE: 1/12/98 CONTACT: H. M. Coon TELEPHONE- (216) 280-5434 No.

Date Type Duraton Reason Method Cause and Corrective Acton to Prevent Recurrence 1

Hours 2

3 97-13 12/19/97 F

70.3 A

3 An automate reactor scrLa occurred on 12/19/97 due to an eWydrauhc leak on a turtune con *Jol watve.

SUMMARY

Perry Unit One remained on irne until the automate scram on 12/19. The und was back on t*e gnd at 0756 on 12/22 and at 100% power on 12/23 at 1327.

The unit rema:ned at 100% power for the remainder of the month.

1. TYPE:

2, REASON:

3 METHOD.

i F: Forced A - Equipment Failure (explain) 1 - Manual i

S Scheduled B - Maintenance of Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D -Regulatory Restrction 4 - Continued E - Operating Training &

5 - Reduced Load License Examination 9 - Other F-Administratsve G - Operatonal Error (explain)

H-Other (explain) 2

,