.OPERATIN3 DATA REPORT-UNIT: Eeny.
DATE: 1/12/98
- 1.
Docket; $0:41Q r
2.
Unit Name: Perry Nuclear Power Pig
. 3.
Reporting Period: December 1997 4.
Utility Contact;
.H.M. Coon-
- 5..
Telephone: 216-280-5434 6.
Design Electrical Rating (Net MWe):
1191 7.
Maximum Dependable Capacity (Net MWo):
1100 This Month Yr-to-Date Cumulative.
8.
Hours Reactor was Critical 693.5 7.415.4 64.504.7 9.
Hours Generator On-Line 673.7 7.181.1 61.319.4 10.
- Unit Reserve Shutdown Hours 0.0 0.0 0.0 782.008 8 151.829 69.421.430 11.
Net Electrical Energy (MWeH) _
i R.
FDR s
.t
,.p..
~.
UNIT SHUTDOWNS AND POWER REDUCTIONS i-REPORT MONTH - DECEMBER 1997 DOCKET NO: 50-440 NAME PNrv Nuclear Power Plant DATE: 1/12/98 CONTACT: H. M. Coon TELEPHONE- (216) 280-5434 No.
Date Type Duraton Reason Method Cause and Corrective Acton to Prevent Recurrence 1
Hours 2
3 97-13 12/19/97 F
70.3 A
3 An automate reactor scrLa occurred on 12/19/97 due to an eWydrauhc leak on a turtune con *Jol watve.
SUMMARY
- Perry Unit One remained on irne until the automate scram on 12/19. The und was back on t*e gnd at 0756 on 12/22 and at 100% power on 12/23 at 1327.
The unit rema:ned at 100% power for the remainder of the month.
- 1. TYPE:
2, REASON:
3 METHOD.
i F: Forced A - Equipment Failure (explain) 1 - Manual i
S Scheduled B - Maintenance of Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D -Regulatory Restrction 4 - Continued E - Operating Training &
5 - Reduced Load License Examination 9 - Other F-Administratsve G - Operatonal Error (explain)
H-Other (explain) 2
,