Monthly Operating Rept for Apr 1996 for Perry Nuclear Power Plant Unit 1
ML20112A223
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/30/1996
From: Neuman G, Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2051, NUDOCS 9605200411
Download: ML20112A223 (6)


Text

. .- . . .- .- . - . _ . - - _ _ . . . . .- -_ _ _ . -

I csmismsoft ENERGY PERRY NUCLEAR POWER PLANT Mail Address: Donald C. Shelton 10 CENTER ROAD RR , O 10 44081 PERRY, OHIO 44081 NUCt. EAR (216) 259 3737 May 15, 1996 PY-CEI/NRR-2051L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen: $

Attached is the April 1996 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5333.

Very truly yours, vY for onald C. Shelton i

GMN:sc Attachment ec: NRC Project Manager l NRC Resident Inspector Office NRC Region III 200054 9605200411 960430 0 PDR ADOCK 0500 R

v operahng Compo".es I C' eve &d Electoc memat+g k beca Ed sor k -

s

I I

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT April 1, 1996 - April 30, 1996 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 I

)

i

e

  • i Table of Contents Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . . . . 1 Operating Data Report. .......................... 2 i Unit Shutdowns and Power Reductions . . . . . . . . . . . . . . . . . . . .-3 i

I

l j

1 l

l AVERAGE DAILY UNIT POVER LEVEL i DOCKET No. 50-440 UNIT Perry One DATE 5/15/96 CONTACT G.M.Neuman TELEPHONE (216)280-5815 i

MONTE APRIL 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 1042 2 0 18 1114 j 3 0 19 1103 4 0 20 930 5 0 21 1164 6 0 22 1154 7 0 23 1164 8 0 24 1161 9 0 25 1154 10 36 26 1159 11 411 27 1167 12 820 28 1165 13 1123 29 1162  ;

14 732 30 1161 l 15 321 31 N/A 16 459 l

OPERATING DATA REPORT UNIT: Perry One DATE: 5/15/96 OPERATING STATUS

1. Docket: 50-440
2. Reporting Period: APRIL 1996
3. Utility contact: G.M.Neuman
4. Licensed Thermal Power (MVt): 3579
5. Nameplate Rating (Gross MVe): 1250
6. Design Electrical Rating (Net MWe): 1191
7. Maximum Dependable Capacity (Gross MVe): 1225
8. Maximum Dependable Capacity (Net MWe): 1166
9. If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level to Which Restricted, if any (Net MWe): 100%
11. Reasons for Restrictions, if any: Operating License This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 719.0 2,903.0 74,075.0
13. Hours Reactor was Critical 552.1 1,178.8 51,487.2 l
14. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 478.6 1,103.8 49,567.7
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross Thermal Energy (MVH) 1,506,132 3,312,896.-~ 168,389,987
18. Gross Electrical Energy (MWH) 497,145 1,106,0'/4 57,712,145
19. Net Electrical Energy (MVH) 468,240 1,045,683 54,842,330
20. Unit Service Factor 66.6% 38.0% 66.9%
21. Unit Availability Factor 66.6% 38.0% 66.9%
22. Unit Capacity Factor (using MDC Net) 55.9% 30.9% 64.0%
23. Unit Capacity Factor (Using DER Net) . 54.7% 30.2% 62.2%
24. Unit Forced Outage Rate 2.5% 1.1% 10.5%
25. Forced Outage Hours 12.2 12.2 5,791.3
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

27. If Shutdown at end of Report Period, Estimated Date of Startup:

N/A

. ._ - _ . - . - . - . - . _ _ .- -- . . . - , - . - - -. .~ . - . . - . - . . . = . . . - . . . . _. . . . ,

+ .

UNIT SHUTD0VNS AND POWER REDUCTIONS

  • REPORT MONTH APRIL 1996
  • DOCKET NO. 50-440 UNIT NAME Perry One DATE 5/15/96 [

CONTACT G.M.Neuman TELEPHONE (216)280-5815 ,

NO. DATE TYPE DURATION REASON METHOD LER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 HOURS 2 3 4 4 5 RECURRENCE 96-02 4/15/96 F 12.2 A 1 N/A N/A N/A Steam Leaks on Motor Feed Pump i

SUMMARY

Perry Unit One was off-line until 4/10/96 for RF095. Cycle 6 started 4/10/96 at 1823. The unit ended the month at 100% power. ,
1. TYPE: 2. REASON: 3. METHOD 4. EXHIBIT G- Instructions F: Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee ,

C-Refueling 3-Automatic Scram Event Report (LER) file i D-Regulatory Restriction 4-Continued (NUREG 1022)

E-Operator Training & 5-Reduced Load License Examination 9-Other 5. EIHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain) p