Text

- . . . . . - .-

W- -

ENERGY WI Address:

Do" PERRY NUCLEAR POWER PLANT gN V CE PRES DENT 10 CENTER ROAD PERRY OHIO 44081 NUCLEAR PERRY, OHIO 44081 (216) 259-3737 November 15, 1995 PY-CEI/NRR-2001L 1

United States Nuclear Regulatory Commission l Document Control Desk Vashington, D.C. 20555 i l

Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen:

Attached is the October 1995 Monthly Operating Rs, port for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Floosterman, Manager - Regulatory Affairs at (216) 280-5833.

1 Very t yours,

\\

GMN sc l Attachment cet NRC Project Manager NRC Resident Inspector Office NRC Region III 9 e c r c,

6. 12 u u d J Operor.g Compo,.es Ciese'or a Electric liiummof +g r I *30 E d "" 9511200014 951031 [ hp I PDR ADOCK 05000440 1

__ R. PDR .

I

}

c k

CLEVELAND ELECTRIC ILLUMINATING COMPANY ,

PERRY NUCLEAR POWER PLANT October 1, 1995 - October 31, 1995 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 i

I

. . _ . . ,_. . . _ ..___ _ . .. .. _.. _ _. _ . . . _ _ , - _ . _ _ _ . . _ _ . _ . _ . _ . _ - - . . . ~ _ . _ _ _

- . . _ . _ . l,

~

. i

j. .. ,

. g 4

i l

Table of Contents ,

I i

l i

Average Daily Unit Power Level . . . . . . . . . . . . . . . . . . . . . .

1- l

' Operating Data Report . - . . . ........... ........... 2 i

Unit Shutdowns and Power Reductions . . . , . . .......-....... 3 l 1

l l

l

?

1 f

k

, -y , -- y . .- -- . . . . . . . . - . - - --

d AVERAGE DAILY UNIT POWER LEVEL D0GET NO. 50-440 UNIT Perry One DATE 11/15/95 CONTACT G.M.Neuman TELEPHONE (216)280-5815 l 1

MON 111 October 1995 D&Y AVERAGE DAILY POWER IREL D&Y AVERAGE D&ILY POWER IJMIL (MWe-Net) (MWe-Net) 1 1157 17 1174 2 1163 18 1169 3 1165 19 1163 4 1163 20 1165 5 1160 21 1179 6 1161 22 1174 7 1090 23 1166 8 1172 24 1169 9 1171 25 1175 10 1166 26 1174 11 1165 27 1165 12 1161 28 1172 13 1160 29 1179 14 1165 30 1176 15 1173 31 1176 16 1174

~

OPilRATD8G DATA REPORT UNIT: Perry One DATE: 11/15/95 OPERATING STATUS

1. Docket: 50-440
2. Reporting Periol: October 1995
3. Utility contact: G.M.Neuman
4. Licensed Thermal Power (MVt): 3579
5. Nameplate Rating (Gross MWe): 1250
6. Design Electrical Rating (net MWe): 1191
7. Maximum Dependable Capacity (Gross MVe): 1225
8. Maximum Dependable Capacity (Net Hve): 1166
9. If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

None

10. Power Level to Which Restricted, IP any (Net MWe): 100%
11. Reasons for Restrictions, IF Any: Operating License This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 745.0 7,296.0 69,708.0
13. Hours Reactor was Critical 745.0 7,040.6 48,971.0
14. Reactor reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 745.0 6,886.8 47,174.8
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross thermal Energy (MUH) 2,656,159 23,905,328 160,901,233 l
18. Gross Electrical Energy (MWH) 908,022 8,121,205 55,170,951
19. Net Electrical Energy (MUH) 867,378 7,746,133 52,430,960
70. Unit Service Factor 100.0% 94.4% 67.7% ,
21. Unit Availability Factor 100.0% 94.4%- 67.7% l
22. Unit Capacity Factor (using MDC Net) 99.9% 91.1% 65.1%
23. Unit Capacity Factor (Using DER Net) 97.8% 89.1% 63.2%
24. Unit Forced Outage Rate 0.0% 5.6% 10.6%
25. Forced Outage Hours 0.0% 409.2 5,604.2
26. Shutdowns Scheduled Over Next 6' lion...a '(Type, Date, and Duration of Each): -

January 27, 1996, Refuel Outage #5. 57 daf duration '

27. If Shutdown at end of Report Period, Estimated Date of Startup:

l l

l l

TWIT SIRTfDOWS AM) POWER REDUCTIONS REPORT MONIH October 1995 -

t D0GET NO. 50-440 INIT One NAME Perry One . I DATE 11/15/95 -

CONTACT G.M.Neuman TELEPHONE (216)280-5815 j NO. DATE TYPE DLRATION REASON METHOD IER SYSTEM COMP. CAUSE & CORRECTIVE ACTION TO PREVENT 1 H0tRS 2 3 # 4 5 RECURRMCE l

)

SUMARY: Perry Unit One remained on line through the month of October 1995

1. TYPE: 2. REASON: 3. METHOD

.. SYRIBIT G- Instructions F: Forced A-Equipment Failure (explain) 1-Manual ft,? peparation of data S: Scheduled B-Maintenance or Test 2 h Scrre '

- try sheets for Licensee C-Refueling 3-Automatic 9.:::m Ecat Report (IB) file D-Regulatory Restriction 4-Continued (NLRblC 1022)

E-Operator Training & 5-Reduced ' M License Examination 9-Other 5. EIRIBIT l-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain)

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ _ _ _ _ _ - _