ML20045A548
ML20045A548 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 05/31/1993 |
From: | COMMONWEALTH EDISON CO. |
To: | |
Shared Package | |
ML20045A547 | List: |
References | |
NUDOCS 9306110050 | |
Download: ML20045A548 (1) | |
Similar Documents at Quad Cities | |
---|---|
Category:FUEL CYCLE RELOAD REPORTS
MONTHYEARML20196G1241998-11-30030 November 1998
[Table view]COLR for Quad Cities Unit 1 Cycle 16 ML20247N6281998-05-19019 May 1998 Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 ML20198R1451997-11-0404 November 1997 Rev 1 to Quad Cities,Unit 2 Cycle 15 Colr ML20198R1911997-11-0404 November 1997 COLR for Quad Cities Unit 2 Cycle 15 ML20117H8791996-05-31031 May 1996 Revised COLR for Quad Cities Unit 2,Cycle 14 ML20117H7321996-05-31031 May 1996 Revised COLR for Quad Cities Unit 1,Cycle 15 ML20077E3421994-12-0606 December 1994 Revised COLR for Quad-Cities Unit 2 Cycle 13 ML20069F7221994-05-31031 May 1994 Cycle 14 Core Operating Limits Rept ML20045A5481993-05-31031 May 1993 Quad-Cities Nuclear Power Station Unit 1,Summary of Fuel Performance,End-of-Cycle 12, May 1993 ML20044F9731993-05-21021 May 1993 Revised, Quad-Cities Unit 2,Cycle 13 Colr. ML20044F9931993-05-21021 May 1993 Revised Quad-Cities Unit 1,Cycle 13 Colr. ML20125B5301992-12-0303 December 1992 Cycle 13 Colr ML20101A0201992-01-31031 January 1992 Core Operating Limits Rept Quad Cities Nuclear Power Station,Unit 2,Reload 11 (Cycle 12) ML20066F4001991-01-21021 January 1991 Core Operating Limits Rept for Quad-Cities Unit 1 Cycle 12 ML19325C9081989-10-11011 October 1989 Core Operating Limits Rept for Quad Cities Nuclear Power Station Unit 1,Reload 10 (Cycle 11). ML20247D3071989-05-31031 May 1989 Core Operating Limits Rept for Quad Cities Nuclear Power Station Unit 1,Reload 9 (Cycle 10) ML20247D3171989-05-31031 May 1989 Core Operating Limits Rept for Quad Cities Nuclear Power Station Unit 2,Reload 9 (Cycle 10) ML20148N4111988-01-31031 January 1988 Rev 0 to, Supplemental Reload Licensing Submittal for Quad Cities Nuclear Power Station Unit 2,Reload 9,Cycle 10 ML20215A5451986-08-31031 August 1986 Errata & Addenda Sheet 14,replacing Pages v/vi,3-2,4-3,4-10, 4-15 & 4-16,to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Station ML20215A5271986-07-31031 July 1986 Rev 0 to Supplemental Reload Licensing Submittal for Quad Cities Nuclear Power Station,Unit 2,Reload 8 (Cycle 9) ML20215A5341986-05-21021 May 1986 Errata & Addenda Sheet 15,replacing Pages v/vi,3-2,4-3 & 4-16,to LOCA Analysis Rept for Dresden Units 2 & 3 & Quad Cities 1 & 2 Nuclear Power Station ML20212Q2301985-08-31031 August 1985 Rev 0 to Supplemental Reload Licensing Submittal for Quad Cities Nuclear Power Station Unit 1,Reload 8 (Cycle 9) ML20024C2481983-05-31031 May 1983 Rev 0 to Supplemental Reload Licensing Submittal for Quad Cities Nuclear Power Station,Unit 2,Reload 6 (Cycle 7). 1998-05-19 Category:TEXT-SAFETY REPORT MONTHYEARML20217A9931999-09-30030 September 1999
[Table view]NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With ML20205D1311998-12-31031 December 1998 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With ML20196C8391998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196G1241998-11-30030 November 1998 COLR for Quad Cities Unit 1 Cycle 16 ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196C8731998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With1998-10-31031 October 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20153D0191998-09-18018 September 1998 Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu ML20153C6771998-09-17017 September 1998 Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed ML20151T2711998-09-0404 September 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 ML20151Y7261998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20151Y7301998-07-31031 July 1998 Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20237A6251998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2 SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With1998-07-15015 July 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 ML20247N6281998-05-19019 May 1998 Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 ML20216C0561998-04-30030 April 1998 Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize Figures SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20217D0281998-04-22022 April 1998 Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies ML20217G3951998-04-0808 April 1998 TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 1999-09-30 |
Text
m q
QUAD-CITIES NUCLEAR POWER STATION UNIT ONE
SUMMARY
STATUS OF FUEL PERFORMANCE i
END OF CYCLE TWELVE MAY.1993 At the end of this reporting period, Quad-Cities Unit One has completed twelve Reactor cycles of operation. During that time, 2,656 fuel assemblies had seen duty in the Unit One core.
Sipping was performed on one reload fuel assembly, LYJ449. LYJ449 was prepared as the Barrier Lead Test Assembly (BLTA) for carrying six high exposure rods from the discharged BLTA bundle LYD396. The six high exposure rods were discharged upon examination due to pitted corrosion in two of the six rods. LYJ449 was returned to its original configuration and was sipped successfully and reinserted in the core for cycle thirteen. '
No sipping was performed on the remaining reload fuel assemblies at the end of cycle twelve. This decision was based on chemical and radiochemical data collected during cycle twelve, which showed no indication of leakage or fuel failure.
For Unit One Cycle 13,152 new YJ3-GE9B (barrier clad) assemblies were visually inspected and loaded into the Unit One Reactor. ;
f 9306110050 DR 930518 p ADOCK 05000254 i PDR STMGRio7591RLB