i 3

a i

i QUAD CITIES UNIT 1 CYCLE 13-

)

CORE OPERATING LIMITS REPORT i

9 i

9212100044 921203 PDR ADOCK 05000254 P

PDR

4 Core Operating. Limits Report ISSUANCE OF CHANGES

SUMMARY

Affected Affected Sectica Pages Summary of Changes Date All All Original Issue (Cycle 11) 06/89 All All Original Issue (Cycle 12) 10/90 All All Original Issue (Cycle 13) 11/92 i

i Quad Cities Unit 1 Cycle 13

Core Opemting Limits Report 4

4

.I TABLE OF CONTFETS REFEREN C ES.......................................................................... iii LI ST OF FI G URES..................................................................... i v 1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION I

(3.2/4.2)....................................................................... 1 1.1. TECHNIC AL S PECIFICATION

REFERENCE:

....................... I

1.2. DESCRIPTION

...................................................... 1 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

(3.5/4.5)..............................................................................2 2.1 TECHNICAL SPECIFICATION

REFERENCE:

...................... 2

2.2 DESCRIPTION

........................................................ 2 3.0 LINEAR HEAT GENERATION RATE (LHGR) (3.5/4.5)................ 3 1

3.1 TECHNICAL SPECIFICATION

REFERENCE:

.................. 3

3.2 DESCRIPTION

.......... 3 4.0 MINIMUM CRITICAL POWER RATIO (MCPR) (3.5/4.5)................ 4 4.1 TECHNIC AL S PECIFIC ATION

REFERENCE:

...................... 4 4.2 DES C RIPTI ON :...........................................................4 i

11 Quad Cities Unit 1 Cycle 13

Core Operating Limits Report REFERENCES 1.

Commonwealth Edison Company and Iowa-Illinois Gas and Electric Company Docket No. 50-254, Quad Cities Station, Unit 1 Facility Operating License, License No. DPR-29 2.

Letter from D. M. Crutchfield to All Power Reactor Licenses and Applicants, Generic Ixtter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Technical Specifications.

3.

Supplemental Reload Licensing Report for Quad Cities Nuclear Power Station, Unit 1 Reload 12 Cycle 13,23A7176, Revision 0, Class I, April 1992.

l 4

4.

Quad Cities Nuclear Power Station, Units 1 and 2, SAFER /GESTR - LOCA Loss-of-Coolant Accident Analysis, NEDC-31345P, Revision 2, Class III, July 1989 (as amended).

5.

General Electric Standard Application for Reactor fuel (GESTAR),

NEDE-24011-P-A-10, Class III, February 1991.

6.

Extended Operating Domain and Equipment Out-Of-Service for Quad Cities Nuclear Power Station Units 1 and 2, NEDC-31449, Revision 1, Class II, July 1992.

7.

General Electric Procedure Y1003V43, ' Thermal-Mechanical Limit Evaluation,'

Revision 4, Fehmary 1991.

i iii Quad Cities Unit 1 Cycle 13

Core Operating Limits Report i

LIST OF FIGURES Figure Title Page i

. Maximum Avemge Planar Linear Heat Genemtion l

2-1 Rate (MAPLHGR) vs. Average Planar Exposure for 2-1 i

GE7B-P8DRB299-7G4.0-80M-145-T.

4

{

Maximum Average Planar Linear Heat Generation j

2-2 Rate (MAPLHGR) vs. Average Planar Expusure for 2-2 GE7B-P8DRB282-7G3.0-80M-145-T.

Maximum Average Planar Linear Heat Generation 2-3 Rate (MAPLHGR) vs. Average Planar Exposure for 2-3 G E8B-P8 DQB300-7G4-80M-4WR-145-T.

I Maximum Average Planar Linear Heat Generation 2-4 Rate (MAPLHGR) vs. Average Planar Exposure for -

2-4 GEf 3-P8DQB300-9G4-80M-4WR-145-T.

Maximum Average Planar Linear Heat Generation t

i 2-5 Rate (MAPLHGR) vs. Average Planar Exposure for 2-5 G E8 B-P8 DWB301 -9 G Z-80M-4WR-145 -T.

l Maximum Average Planar Linear Heat Generation i

2-6 Rate (MAPLHGR) vs. Average Planar Exposure for 2-6 G E9B-P8 DWB258-4G 4/3 G3-80M-145-T.

{

Maximum Avenge Planar Linear Heat Generation 2-7 Rate (MAPLHGR) vs. Average Planar Exposure for 2-7 i

GE9B-P8DWB258-9GZ-80M-145-T.

i Maximum Average Planar Linear Heat Generation 2-8 Rate (MAPLHGR) vs. Average Planar Exposure for 2-8 1

i -

GE9B-P8DWB305-7GZ-80M-145-T.

4-1 Kf Factor vs. Core Flow %.

4-1 4

iv 0

i-4 Quad Cities Unit 1 Cycle 13 i

Core Operating Limits Report 1.0 CONTROL ROD WITIIDRAWAL 3 LOCK INSTRUMENTATION (3.2/4.2) l.1.

TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification Table 3.2-3 and 3.6.H

1.2. DESCRIPTION

The Rod Withdrawal Block Monitor Upscale Instnamentation Trip Setpoint for two recirculation loop opemtion is determined from the following relationship:

s (0.65)Wd + 43 % **

4

    • Clamped, with an allowable value not to exceed the allowable vahte for recirculation loop drive flow (Wd) of 100%.

Wd is the percent of drive flow required to produce a rated core flow of 98 million Ib/hr. Trip level setting is in percent of rated power (2511 MWth).

f a

'f I

J Pagei Quad Cities Unit 1 Cycle 13

a Core Operating Limiis Report i

j

.2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)- (3.5/4.9 4

-2.1 TECHNICAL SPECIFICATION

REFERENCE:

i -

Technical Specification 3.5.I i

2.2 DESCRIWION

The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR).

versus Average Planar Exposure for GE7B-P8DRB299-7G4.0-80M-145-T i

is determined from Figure 2-1.

l l

The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR)

{

versus Average Planar Exposure for GE7B-P8DRB282-7G3.0-80M-145-T

{

is determined from Figure 2-2.

I The Maximum Average Pl: tar Linear Heat Genemtion Rates (MAPLHGR) l Versus Avemge Planar Exposure for GE8B-P8DQB300-7G4 80M-4WR-145-T

'i.

is determined from Figure 2-3.

i The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR) versus Average Planar Exposure for GE8B-P8DQB300-9G4-80M-4WR-145-T is determined from Figure 2-4.

1 The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR) l Versus Avemge Planar Exposure for GE8B-P8DWB301-9GZ-80M-4WR-145-T is deteimined from Figure 2-5.

The Maximum Average l'lanar Linear Heat Generation Rates (MAPLHGR) versus Average Planar Exposure for GE9B-P8DWB258-4G4/3G3-80M-145 T is determined from Figure 2-6.

The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR) versus Average Planar Exposure for GE9B-P8DWB258-9GZ-80M-145-T is determined from Figure 2-7.

The Maximum Average Planar Linear Heat Generation Rates (MAPLHGR) versus Average Planar Exposure for GE9B-P8DWB305-7GZ-80M-145-T -

is determined from Figure 2-8.

i Page 2 1

Quad Cities Unit 1 Cycle 13 4

..,....,,,--,,,m

,+,,,..r,

.nr e-_

,,r,v.,

y,

_.,-..,,..,,..-+,m,-,.

. c # -,

e.r m,

.w,w,

MAPLHGR vs. Average Planar Exposure i

GE7B-P8DRB299-7G4.0-80M-145-T

~

i MAPLHGR (kW/ft) 14 i

1 l

t i.

?

4 12 --./*y

  • N1 i

i i

i j

10 7-N sj-i N.

i I

4.-

t I

i j'

6 0

10 20 30 40 i

Average Planar Exposure (GWd/ST)

+ Figure 2-1 i

Quad Cities 1 Cycle 13 l

Core Operating Umits lleport j

Page 2-1 I

i i

MAPLHGR vs. Average Planar Exposure

.GE7B-P8DRB282-7G3.0-80M-145-T

~

MAPLHGR (kW/ft) 14 j

i 12 T

T -----

... ' / w_;;

N*

i 4

l I

10

-l-

-f

--- N - b -

~.

..._..._...__-i_.____.____.

_,L._._.

+. _.. _.

g l

6 0

10 20 30 40 Average Planar Exposure (GWd/ST)

-+-Figure 2-2 l

l Quad Cities Unit 1 Cycle 13 i

Core Operating Limits Report Page 2-2

e MAPLHGR vs Average Planar Exposure GE8B-P8DQB300-7G4-80M-4WR-145-T

~

MAPLHGR (kW/ft) 14 i

.s x.%

l i

i 12 -- / -

4 I

x\\

L

\\--

7 l

i 10 j

)

i

~

l 8

-~

~

- L i

A N*

i l.

6 0

10 20 30 40 i

Average Planar Exposure (GWd/ST)

+ Figure 2-3 i

i Quad Cities Unit 1 Cycle i3 Core Operating Umits Report i

Page 2-3 l

MAPLHGR vs Average Planar Exposure GE8B-P8DQB300-9G4-80M-4WR-145-T

~

MAPLHGR (kW/ft) 14

/./.

+-.x

~

N i

o,,N l

12

,/

l

'\\)

lN 10 1

i i

i j

e

_7 i

i s.

j y

I 6

0 10 20 30 40 j-Average Planar Exposure (GWd/ST) i j

+ Figure 2-4 1

f Quad Cities Unit 1 Cycle 13 Core Operating Limits Report l

Page 2-4

MAPLHGR vs. Average Planar Exposure GE8B-P8DWB301-9GZ-80M-4WR-145-T MAPLHGR (kW/ft) i i

13

,.*... -..i. s.

t i

.N 4

11

+

l-N I-I i

i I

i i

a 9

-t-N N

N 7

r-

- r --

i -- -

s N;

i 5

I O

10 20 30 40 50 l

Avurage Planar Exposure (GWd/ST) l

+ Figure 2-5 l

i l'

Quad Cities Unit 1 Cycle 13 l

Core Operating Umits Report -

l Page 2-5

MAPLHGR vs. Average Planar Exposure GE9B-P8DWB258-4G4/3G3-80M-145-T l

MAPLHGR (kW/ft) 14 j

i i

1,

.~* x ;:

i qN.

12

+

~.N i

10

,i x

N-!

8 i

6

- - - +

- - m i- -

i N

j i

4 j

o 10 20 30 40 50 Average Planar Exposure (GWd/ST)

  • -Figure 2 !

j Quad Cities Unit 1 Cycle 13 j

Core Operating Limits Report Page 2-6

MAPLHGR vs. Average Planar Exposure GE9B-P8DWB258-9GZ-80M-145-T

~

MAPLHGR (kW/ft) 14 j

,:'*.."..-4-.s* N *-

i t

N.,~ y,

~

+

12 10 N

I 8

1 4---

C

\\

i s

6

~ - - -

- - - -- - i - -

h l

+-

l i

  • ~.

i I

l 4

l i

0 10 20 30 40 50 I

j Average Planar Exposure (GWd/ST) l

+ Figure 2-7 i

i l

Quad Cities Unit 1 Cycle 13 l~

Core Operating Limits Report i

Page 2-7 1

MAPLHGR vs. Average Planar Exposure GE9B-P8DWB305-7GZ-80M-145-T MAPLHGR (kW/ft) l

  • ,. y... + *-*~*~* ~
  • x. x.

I 13 x *e l

x 11 i-7 l N *x l

j t

9 i

j.

,x I

\\x 7

~

I 5

i 0

10 20 30 40 50 l

Average Planar Exposure (GWd/ST) i l

+ Figure 2-8 i

f Quad Cities Unit 1 Cycle 13 j,

Core Operating Umits Report Page 2-8 i

. - -. ~... -... _.. -. _.

I Core Operating Limits Report 4

i i

V j

3.0 LINEAR IIEAT GENERATION RATE (LILG_R) (3.5/411 i

l 3.1 TECHNICAL SPECIFICATION

REFERENCE:

i I

Technical Specitication 3.5.J j

i

3.2 DESCRIPTION

i f

A.

The LHGR limit is 13.4 Kw/ft for fuel types:

1.

GE7B-BP8DRB299-7G4.0-80M-145-T i

2.

GE7B-BP8DRB282-7G3.0-80M-145-T i

i i

B.

The LHGR liinit is 14.4 Kw/ft for fuel types:

1.

GE8B-P8DQB300-7G4 80M-4WR-145-T i

2.

GE8B-P8DQB300-9G4-80M-4WR 145-T 3.

GE8B-P8DWB301-9GZ-80M-4WR-145-T 4

l 4.

GE9B-P8DWB258-4G4/3G3-80M 145-T l

5.

GE9B-P8DWB258-9GZ-80M-145-T l

6.

GE9B-P8DWB305-7GZ-80M-145-T l

i i

l I

i 3

1

?

i i

i l

Page 3 j

Quad Cities Unit 1 Cycle 13 r

v-,m.

.,.A--,,,,...___,,._...,_.,

_ _.. - ~,,,,,... - -,..-,.. _,..-,,.

..m_..._,,,.

..-.--,.-,.J._.,-_,,~..

Core Operating Limits Report 4.0 511NINIUNI CRITICAL POWER RATIO (N1CPR) (3.5/4.5) 4.1 TECHNICAL SPECIFICATION

REFERENCE:

4 Technical Specifications 3.5.K and 3.6.H 4.2 DESCRII' HON:

A q

During steady-state operation at rated core flow, the Operating Limit htCPR (OLhiCPR) shall be greater than or equal:

1.27 for t ve s 0.68 seconds a

1.37 for t ve 2 0.86 seconds a

(0.556)t ve +0.892 for 0.68 < tave < 0.86 seconds a

where t ve = mean 20% scram insertion time for all suneillance data from a

Technical Specification 4.3.C which has been generated in the current cycle.

For core flows other than rated, these nominal values of OLhtCPR shall be increased by a factor of Kf where Kf is as shown in Figure 4-1.

A cycle independent OLhtCPR of 1.31 (Option B) was calculated (Reference 6) for operation with a Feedwater Heater Out-of-Service (FWHOOS). Therefore, the OLhfCPR, calculated using the above information, shall be incmased by 0.04 whenever operating with a FWHOOS.

This event, which conservatively bounds the requirements detailed within the EOD/EOOS document (Reference 6), goes beyond all normal opemting conditions in the SRLR j

(Tleference 3).

Page 4 Quad Cities Unit 1 Cycle 13