ML20044F993

From kanterella
Jump to navigation Jump to search
Revised Quad-Cities Unit 1,Cycle 13 Colr
ML20044F993
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 05/21/1993
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20044F990 List:
References
NUDOCS 9306010293
Download: ML20044F993 (19)


Text

,,6an,-

,a

-a..

2 M

G 9

9 b

l t

1 QUAD CITIES UNIT 1 CYCLE 13 CORE OPERATING LIMITS REPORT i

i i

9306010293 930521' ADOCK 05000254 PDR PDR P

Core Operating Limits Report ISSUANCE OF CHANGES

SUMMARY

f Affected Affected Section Pages Summary of Changes Date All All Original issue (Cycle 11) 06/89 All All Original issue (Cycle 12) 10/90 All All Original Issue (Cycle 13) 11/92 2

iv. 2 Converted Figures 2-1 through 2-8 to 03/93 2 2-8 actual tables from References 4 and S.

Added Section 2.3 on SLO.

r I

i l

Quad Cities Unit 1 Cycle 13 1

Core Operating Limits Report h

TABLE OF CONTENTS t

R EF E R E N C ES...................................................................................................... i i i L I ST O F TA B L ES................................................................................................ iv LI ST O F F I G U R ES.............................................................................................. v 1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION..................1 1.1. TECH NICAL SPECIFICATION

REFERENCE:

......................................1 i

1. 2. D ES C RI PT l O N :................................................................................ 1 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)........... 2 2.1 TECHNICAL SPECIFICATION

REFERENCE:

....................................... 2 2.2 D ES C R I PTI O N :.............................................................................. 2 2.3 SINGLE LOOP OPERATION M U LTIPLIER:......................................... 2 3.0 LIN EAR H EAT GEN ERATION RATE (LHG R)........................................... 3 3.1 TECH NICAL S PECIFICATION

REFERENCE:

...................................... 3 3.2 D ES C R I PTI O N :.............................................................................. 3 4.0 MINIM U M CRITICAL POWER RATIO (MCPR)............................................ 4 4.1 TECH N1 CAL SPECIFICATION

REFERENCE:

....................................... 4 4.2 D ES C R I PTl O N :............................................................................. 4 t

I ii Quad Cities Unit 1 Cycle 13 r

~

Core Operating Limits Report REFERENCES 1.

Commonwealth Edison Company and lowa-Illinois Gas and Electric Company Docket No. 50-254, Quad Cities Station, Unit 1 Facility Operating License.

License No. DPR-29.

7 2.

Letter from D. M. Crutchfield to All Power Reactor Licenses and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Technical Specifications.

3.

Supplemental Reload Licensing Report for Quad Cities Nuclear Power Station, Unit 1 Reload 12 Cycle 13,23A7176 Revision 0, Class I, April 1992.

4.

Quad Cities Nuclear Power Station, Units 1 and 2, SAFER /GESTR - LOCA Loss-of-Coolant Accident Analysis, NEDC-31345P, Revision 2, Class Ill, July 1989 (as i

amended).

5.

Loss-of-Coolant Accident Analysis Report for Dresden Units 2,3 and Quad Cities Units 1,2 Nuclear Power Stations, NEDO-24146A, Revision 1, Class I, April 1979.

6.

General Electric Standard Application for Reactor fuel (CESTAR),

NEDE-24011-P-A 10, Class lil, February 1991.

7.

Extended Operating Domain and Equipment Out-Of-Service for Quad Cities Nuclear Power Station Units 1 and 2, NEDC-31449, Revision 1, Class 11, April 1992.

8.

General Electric Procedure Y1003V43,' Thermal-Mechanical Limit Evaluation,'

Revision 4, February 1991.

i 9.

R. E. Parr letter to R.J. Chin, 'QC1/QC2 SAFER /CESTR Single Loop Operation Analysis with Delayed LPCI Injection,' dated February 12,1993, REP:93-020.

i iii i

6 l

Quad Cities Unit.1 Cycle 13 i

Core Operating Limits Report i

'I LIST OF TABLES Table Title Page Maximum Average Planar Linear Heat Generation 2-1 Rate'(MAPLHGR) vs. Average Planar Exposure for 2-1 GE7B-P8DRB299-7G4.0-80M-14 5-T, Maximum Average Planar Linear Heat Generation

.j 2-2 Rate (MAPLHGR) vs. Average Planar Exposure for 2-2 GE78-P8DRB282-7G 3.0-80M-14 5-T.

Maximum Average Planar Linear Heat Generation 23 Rate (MAPLHGR) vs. Average Planar Exposure for

.2-3 G E88-P8DQB 300-7G4.0-80M-4WR-14 5-T.

i Maximum Average Planar Linear Heat Generation 2-4 Rate (MAPLHGR) vs. Average Planar Exposure for 2-4 GE88-P8DQB300-9G4.0-80M-4WR 14 5-T.

Maximum Average Planar Linear Heat Generation 2-5 Rate (MAPLHGR) vs. Average Planar Exposure for 2-5 G E8 B-P8 DWB 301 -9GZ-80 M-4WR-145-T.

Maximum Average Planar Linear Heat Ger.eration-2-6 Rate (MAPLHGR) vs. Average Planar Exposure for 2-6 t

GE9B-P80WB258-4 G4.0/3 G 3.0-80M-14 5-7.

Maximum Average Planar Linear Heat Generation 27 Rate (MAPLHCR) vs. Average Planar Exposure for

.2-7 l

GE98-P8DWB258-9GZ-80M-14 5-T.

Maximum Average Planar Linear Heat Generation 2-8 Rate (MAPLHCR) vs Average Planar Exposure for 2-8 GE98-P8DWB305-7CZ-80M-14 5-T.

[

i s

iv I

Quad Cities Unit 1 Cycle 13

.y s

Core Operating Limits Report -

t t

3 l

ti LIST OF FIGURES Figure Title Page 4-1 Kf Factor vs. % Core Flow.

4-1 l

't t

I t

i 1

4

- i I

e t

e i

k I

i i

L i

i I

i i

fi F

i i

1 I

t i

v f

f 6

Quad Cities Unit 1 Cycle 13'

-t 5

Core Operating Limits Report 1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION (3.2/4.2) 1.1.

TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification Table 3.2-3 and 3.6.H r

1.2. DESCRIPTION

The Rod Withdrawal Block Monitor Upscale Instrumentation Trip Setpoint for two recirculation loop operation is determined from the following relationship:

s_ (0.65)Wd + 43% **

    • Clamped, with an allowable value not to exceed the allowable value for recirculation loop drive flow (Wd) of 100%.

Wd is the percent of drive flow required to pioduce a rated core flow of 98 million Ib/hr. Trip level setting is in percent of rated power (2511 MWth).

t i

Page1 Quad Cities Unit 1 Cycle 13

Core Operating Limits Report 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) (3.5/4.5) 2.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification 3.5.1

2.2 DESCRIPTION

MAPLHCR versus Average Planar Exposure for GE7B-P8DRB299-7G4.0-80M-145-T is determined from Table 2-1.

MAPLHCR versus Average Planar Exposure for GE7B-P8DRB282-7G3.0-80M-145-T is determined from Table 2-2.

MAPLHGR versus Average Planar Exposure for GE88-P8DQB300-7G4-80M-4WR 145-T is determined from Table 2-3.

MAPLHGR versus Average Planar Exposure for CE88-P8DQB300-9G4-80M-4WR-145-T is determined from Table 2-4.

MAPLHCR versus Average Planar Exposure for GE88-P8DWB301-9GZ-80M-4WR-145-T is determined from Table 2-5.

MAPLHCR versts Average Planar Exposure for GE98-P8DWB258-4G4.0/3G3.0-80M-145-T is determined from Table 2-6.

?

MAPLHCR versus Average Planar Exposure for GE9B-P8DWB258-9GZ-l 80M-145-T is determined from Table 2-7.

MAPLHCR versus Average Planar Exposure for GE9B-P8DWB305-7CZ-l i

80M-145-T is determined from Table 2-8.

2.3 SINGLE LOOP OPERATION MULTIPLIER i

The tabulated values are multiplied by 0.85 whenever Quad Cities enters Single Loop Operation (Reference 9).

Page 2 P

Quad Cities Unit 1 Cycle 13

Core Operating Limits Report TABLE 2-1 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE78-P8DRB299-7G4.0-80M-145-T LATTICE 488 P8DRLO71-NOG-80M-T LATTICE 487 P8DRL319-7G4.0100M-T i

AVERAGE MAPLHGR LIMITS PLANAR (KW/FT)

EXPOSURE 488 487 (GWd/ST) 0.2 10.90 10.90 1.0 11.00 11.00 5.0 11.50 11.50 10.0 12.00 12.10 2

15.0 12.10 12.10 20.0 11.90 11.90 25.0 11.40 11.50 30.0 10.80 11.00 35.0 10.30 10.30 40.0 9.60 9.70 45.0 8.90 9.00 k

i Page 2-1 Quad Cities Unit 1 Cycle 13

Core Operating Limits Report TABLE 2-2 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE7B-P8DRB282-7G3.0-80M-145-T LATTICE 488 P8DRLO71-NOG-80M-T LATTICE 482 : P8DRL301-7C3.0-80M-T AVERAGE MAPLHGR LIMITS PLANAR (KW/FT)

EXPOSURE 488 482 (GWd/ST) 0.2 10.90 11.20 1.0 11.00 11.20 5.0 11.50 11.80 10.0 12.00 12.00 15.0 12.10 12.10 20.0 11.90 11.90 25.0 11.40 11.40 30.0 10.80 10.80 35.0 10.30 10.30 40.0 9.60 9.60 45.0 8.90 8.90 i

i Page 2-2 Quad Cities Unit 1 Cycle 13

~

~

Core Operating Limits Report l

TABLE 2-3 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR EUNDLE TYPE GE88-P8DQB300-7G4.0-80M-4WR-145-T LATTICE 565 P8DQLO71-NOG-80M-4WR-T LATTICE 584 : P8DQL319-7G4.0-80M-4WR-T LATTICE 649. P8DQLO71-7 gel-80M-4WR-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 565 584 649 (GWd/ST) 0.0 11.57 11.57 0.2 11.50 11.58 11.50 1.0 11.30 11.30 2.0 11.28 11.78 11.28 3.0 11.33 11.33 4.0 11.40 12.34 11 40 5.0 11 48 11.48 6.0 11.55 12.87 11.55 7.0 11.61 11.61 I

8.0 11.66 13.14 11.66 9.0 11.69 11.69 10.0 11.72 13.37 11.72 12.5 11.44 13.33 11.44 15.0 11.07 13.00 11.07 20.0 10.29 12.36 10.29 25.0 9.50 9.50 35.0 7.93 7.93 46.3 7.12 Page 2-3 Quad Cities Unit 1 Cycle 13

~

Core Operating Limits Report l

i TABLE 2-4 l

MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE88-P8DQB300-9G4.0-80M-4WR-145-T i

f LATTICE 565. P8DQLO71-NOG-80M-4WR-T LATTICE 644. P8DQL320-9G4.0-80M-4WR-T LATTICE 686 : P8DQLO71-9CE2-80M-4WR-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 565 644 686 i

(GWd/ST) 0.0 11.57 11.57 0.2 11.50 11.24 11.50 1.0 11.30 11.30 2.0 11.28 11.48 11.28 3.0 11.33 11.33 4.0 11.40 12.12 11.40 5.0 11.48 11.48 6.0 11.55 12.75 11.55 7.0 11.61 11.61 8.0 11.66 13.11 11.66 9.0 11.69 11.69 10.0 11.72 13.32 11.72 12.5 11.44 13.36 11.44 15.0 11.07 13.01 11.07 20.0 10.29 12.33 10.29 25.0 9.50 9.50 35.0 7.93 7.93 46.1 7.16 Page 2-4 Quad Cities Unit 1 Cycle 13.

Core Operating Limits Report TABLE 2-5 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE88-P8DW8301-9GZ-80M-4WR-145-T LATTICE 565. P8DQLO71-NOC-80M-T LATTICE 854 P8DQL320-6G2.0-80M-T LATTICE 855 P8DQL320-3G3.0/6G2.0-80M-T

+

LATTICE 856. P8DQLO71-9CE-80M-T AVERAGE MAPLHCR LIMITS (KW/FT)

PLANAR EXPOSURE 565 854 855 856 (GWd/ST) 0.0 11.57 12.18 11.41 11.57 0.2 11.50 12.23 11.49 11.50 1.0 11.30 12.34 11.63 11.30 2.0 11.28 12.60 11.94 11.28 3.0 11.33 12.89 12.34 11.33 4.0 11.40 13.01 12.61 11.40 5.0 11.48 13.14 12.82 11.48 6.0 11.55 13.24 13.02 11.55 7.0 11.61 13.31 13.18 11.61 8.0 11.66 13.34 13.28 11.66 9.0 11.69 13.35 13.34 11.69 10.0 11.72 13.35 13.37 11.72 12.5 11.44 13.33 13.31 11.44 15.0 11.07 12.95 12.94 11.07 20.0 10.29 12.23 12.21 10.29 25.0 9.50 11.50 11.48 9.50 35.0 7.93 10.13 10.11 7.93 45.0 8.52 8.48 50.0 6.27 6.21 Page 2-5 Quad Cities Unit 1 Cycle 13

~

Core Operating Limits Report i

TABLE 2-6 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNOLE TYPE GE98-P8DWB258-4G4.0/3G3.0-80M-145-T LATTICE 731. P8DWLO 71 -NOG-80M-T LATTICE 1002 : P8DWL278-4G4.0/3G3.0-80M-T LATTICE 1003 : P8DWL290-4G4.0/3G3.0-80M-T LATTICE 1004. P8DWLO71-7GE-80M-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1002 1003 1004 (GWd/ST) 0.0 11.64 12.02 11.23 11.64 0.2 11.57 12.09 11.30 11.57 1.0 11.38 12.25 11.47 11.38 2.0 11.36 12.46 11.69 11.36 3.0 11.41 12.66 11.98 11.41 4.0 11.49 12.86 12.20 11.49 5.0 11.56 13.07 12.40 11.56 6.0 11.63 13.20 12.54 11.63 7.0 11.69 13.30 12.69 11.69 8.0 11.74 13.40 12.84 11.74 9.0 11.78 13.46 12.97 11.78 i

10.0 11.81 13.50 13.06 11.81 12.5 11.54 13.44 13.04 11.54 15.0 11.16 13.07 12.79 11.16 20.0 10.37 12.34 12.29 10.37 25.0 9.58 11.66 11.75 9.58 35.0 8.01 10.34 10.24 8.01 43.7 4.71 4.71 45.0 8.33 8.15 50.9 5.10 52.4 4.90 Page 2-6 Quad Cities Unit 1 Cycle 13

i

~

Core Operating Limits Report TABLE 2-7 MAPLHGR vs. AVERAGE PLANAR EXPO 5URE FOR BUNDLE TYPE GE9B P8DWB258-9GZ-80M-145-T LATTICE 731 : P8DWLO71 -NOG-80M-T LATTICE 1005 : P8DWL277-7G3.0-80M-T LATTICE 1006. P8DWL288-7G3.0-80M-T LATTICE 1007 : P8DWL288-2G4.0/7G3.0-80M-T LATTICE 1008 : P8DWLO71-9CE-80M-T AVERAGE MAPLHCR LIMITS (KW/FT)

PLANAR EXPO 5URE 731 1005 1006 1007 1008 f

(GWd/ST) 0.0 11.64 12.07 11.27 10.75 11.64 0.2 11.57 12.14 11.35 10.85 11.57 1.0 11.38 12.33 11.55 11.04 11.38 2.0 11.36 12.56 11.80 11.33 11.36 3.0 11.41 12.79 12.10 11.70 11.41 4.0 11.49 13.03 12.31 11.99 11.49 5.0 11.56 13.23 12.53 12.25 11.56 6.0 11.63 13.33 1 2.71 12.47 11.63 7.0 11.69 13.41 12.84 12.67 11.69 8.0 11.74 13.45 12.94 12.86 11.74 9.0 11.78 13.47 13.00 12.99 11.78 10.0 11.81 13.47 13.05

-13.08 11.81 12.5 11.54 13.41 13.02 13.03 11.54 15.0 11.16 13.04 12.77 12.78 11.16 20.0 10.37 12.32 12.27 12.28 10.37 25.0 9.58 11.64 11.73 11.73 9.58 35.0 8.01 10.32 10.23 10.20 8.01 43.7 4.71 4.71 45.0 8.33 8.15 8.12 50.7 5.12 50.9 5.09 52.4 4.89 i

Page 2 7 Quad Cities Unit 1 Cycle 13

Core Operating Limits Report I

TABLE 2-8 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE98-P8DWB305-7GZ-80M-145-T LATTICE 731 - P8DWLO71 -NOC-80M-T LATTICE 1516 : P8DWL339-3G4.0/4G3.0-80M-T LATTICE 1517 : P8DWL339-7G3.0-80M-T LATTICE 1518 - P8DWL324-7G3.0-80M-T LATTICE 1061 P8DWLO71-7 gel-80M-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1516 1517 1518 1061 (GWD/ST) i 0.0 11.64 12.00 12.00 11.97 11.64 0.2 11.57 12.10 12.11 12.04 11.57 1.0 11.38 12.26 12.27 12.11 11.38 2.0 11.36 12.42 12.44 12.31 11.36 3.0 11.41 12.59 12.60 12.59 11.41 4.0 11.49 12.74 12.75 12.91 11.49 5.0 11.56 12.88 12.89 13.09 11.56 6.0 11.63 13.01 13.01 13.23 11.63 7.0 11.69 13.10 13.06 13.36 11.69 8.0 11.74 13.13 13.09 13.48 11.74 9.0 11.78 13.15 13.12 13.54 11.78 10.0 11.81

!3.16 13.15 13.56 11.81 12.5 11.54 13.07 13.08 13.52 11.54 15.0 11.16 12.72 12.73 13.12 11.16 20.0 10.37 12.04 12.05 12.35 10.37 25.0 9.58 11.39 11.40 11.60 9.58 35.0 8.01 10.15 10.15 10.19 8.01 43.7 4.71 4.71 45.0 8.69 8.69 8.68 50.66 5.90 50.68 5.89 51.2 5.78 Page 2-8 Quad Cities Unit 1 Cycle 13

e i

~

Core Operating Limits Report i

3.0 LINEAR HEAT GENERATION RATE (LHGR) (3.5/4.5) i 3.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification 3.5J

3.2 DESCRIPTION

A.

The LHCR limit is 13.4 Kw/ft for fuel types:

1.

GE7B-EP8DRB299-7G4.0-80M-14 5-T 2.

G E78-BP8DRB282-7G 3.0-80M-14 5-T B.

The LHCR limit is 14.4 Kw/ft for fuel types:

1.

G E8B-P8DQB300-7G4.0-80M-4WR-14 5-T 2.

GE88-P8DQB300-9G4.0-80M-4WR-14 5-T 3.

GE8B-P8DWB301-9GZ-80M-4WR 14 5 T 4.

GE9B-P8DWB258-4G4.0/3G3.0 80M-145-T 5.

GE9B-P8DWB258-9CZ-80M-14 5-T -

6.

GE9B-P8DWB305-7CZ-80M 145-T 1

e f

1 Page 3 l

Quad Cities Unit 1 Cycle 13

'l l

L Core Operating Limits Report 4.0 MINIMUM CRITICAL POWER RATIO (MCPR) (3.5/4.5) 4.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specifications 3.5.K and 3.6.H i

4.2 DESCRIPTION

During steady-state operation at rated core flow, the Operating Limit MCPR (OLMCPR) shall be greater than or equal.

1.27 for tave s 0.68 seconds 1.37 for tave 2 0.86 seconds (0.556)t ve +0.892 for 0.68 < tave < 0.86 seconds a

}

where t ve -mean 20% scram insertion time for all surveillance data a

from Technical Specification 4.3.C which hr.s been generated in the current cycle.

For core flows other than rated, these nominal values of OLMCPR shall i

be increased by a factor of Kf where Kfis as shown in Figure 4-1.

A cycle independent OLMCPR of 1.31 (Option B) was calculated (Reference 7) for operation with a Feedwater Heater Out-of-Service (FWHOOS). Therefore, the OLMCPR, calculated using the above r

information, shall be increased by 0.04 whenever operating with a t

FWHOOS. This event, which conservatively bounds the requirements detailed within the EOD/EOOS document (Reference 7), goes beyond all normal operating conditions in the SRLR (Reference 3).

i

-l Page 4

)

Quad Cities Unit 1 Cycle 13 i

FIGURE 4-1 Kf FACTOR 1.5 1.4 :--

s s

s i %.

a.

.a

\\

' '...Autornatic Flow Control M

1.2

--- - N 7 :'-

N

~___

N

~_ _ __

N j,j D

Manual Flow Cont N

'~-

N j

....(137% Max Flow).....

N._.

s.

0.925 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105

% Core Flow

-Quad Cities Unit 1 Cycle 13 Core Operating Limits Report Page 4-1

-..