ML20117H879

From kanterella
Jump to navigation Jump to search
Revised COLR for Quad Cities Unit 2,Cycle 14
ML20117H879
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/31/1996
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20117H727 List:
References
NUDOCS 9605300015
Download: ML20117H879 (22)


Text

  • , Cora Oper:; ting Limits R: port May,1996 ISSUANCE OF CHANGES

SUMMARY

Affected Affected Section Pages Summary of Changes Date All All Original issue (Cycle 11). 10/89 All All Original lasue (Cycle 12), 11/91 Reissue. 2/92 All All Original Issue (Cycle 13). 2/93 2 2 Added Section 2.3 on SLO. 3/93 References, iii, 4 & 5 Revised References and Section 4.2 and 4/94 l 4.2 & 5 added Section 5.0 on Analytical Methods.

All All

)

Original Issue (Cycle 14). 6/95 l All All Latest Date Revised added to each COLR 5/96 page, Added Special Instructions and boxed in TSUP References for TSUP Implementation.

Added Control Rod Withdrawal Block Equation for Single Loop Operation.

i 9605300015 960522 Quad Cities Unit 2 Cycle 14 PDR ADOCK 05000254 P PDH

.* 1 i

', Cora Operating Limits R: port May,1996 1

l TABLE OF CONTENTS S P E C I A L I N ST R U CTI O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

REFERENCES................................................................................................iv 1

L I ST O F T A B L E S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

l l

LISTOFFIGURES..................................................................................

1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION .................1 1.1. TECHNICAL SPECIFICATION

REFERENCE:

....................................1 l

1. 2. D E S C R I PTl O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.3 D E S C R I PT l O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) ......... 2 2.1 TECHNICAL SPECIFlCATlON

REFERENCE:

.................................... 2

2. 2 D E S C R I PTI O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.3 SINGLE LOOP OPERATION MULTIPLIER: ...................................... 2 3.0 LIN E AR H EAT G EN ER ATIO N R ATE (LHG R) ...................... .............. ...... 3 3.1 TECHNICAL SPECIFICATION

REFERENCE:

................................... 3 ,

1 3.2 D E S C R I PT l O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 l 4.0 MINIMUM CRITICAL POWER RATIO (MCPR) ........................................ 4 4.1 TECHNICAL SPECIFICATION

REFERENCE:

.................................... 4 i

i 4.2 D E S C R I PT I O N : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 5.0 A N A LYTl C A L M ET H O D S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 i

< ii Quad Cities Unit 2 Cycle 14

-,. Core Operating Limits Rrport May,1996 f

SPECIAL INSTRUCTIONS

1. This Core Operating Limits Report (COLR) contains the applicable coactor core l limits and operational information mandated by Technical Specification 6.6.A.4, l (TSUP Technical Specification Section 6.9.A.6). When the COLR is referenced by applicable Technical Specifications or procedures for Technical Specification

! compliance, a controlled copy of this report shall be used as the official source

of the applicable limit or requirement.

l

2. Implementation of the Technical Specificat on i Upgrade Program (TSUP): The

! referenced Technical Specifications in this Naport contain a notation as shown

! below, when indicating the applicable TSUP st.ction(s). This reference is to be used when the COLR is used after the activation of TSUP, for the duration of the current operating cycles.

l Example of Technical Specification reference:

TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification 3.5.1 TSUP TECHNICAL SPECIFICATION: 3.11.A

iii l

Quad Cities Unit 2 Cycle 14

\

~

Cora Operating Limits Report l, May,1996 REFERENCES

1. Commonwealth Edison Company and lowa-Illinois Gas and Electric Company Docket No. 50 265, Quad Cities Station, Unit 2 Facility Operating License, License No. DPR-30. ,
2. Letter from D. M. Crutchfield to All Power Reactor Licenses and Applicants, Generic Letter 88-16; Concerning the Removal of Cycle-Specific Parameter Limits from Technical Specifications.

l

3. Supplemental Reload Licensing Report for Quad Cities Nuclear Power Station, I Unit 2 Reload 13 Cycle 14,25A5161, Revision 0, December,1994. )

l

4. Quad Cities Nuclear Power Station, Units 1 and 2, SAFER /GESTR - LOCA Loss-of- ,

Coolant Accident Analysis, NEDC-31345P, Revision 2, July 1989 (as amended). l

5. Extended Operating Domain and Equipment Out-Of-Service for Quad Cities l

Nuclear Power Station Units 1 and 2, NEDC-31449, Revision 1, April 1992, i

6. GE document GENE-637-037-1193, " Analysis of End of Full Power Capability Coastriown with Load Following for Quad Cities 1 and 2, dated November,1993.
7. Lattice Dependent MAPLHGR Report for Quad Cities Nuclear Power Station, Unit 2, Reload 13 Cycle 14,24A5161-AA Revision 0, December,1994.

l i

l l

l l

l i

IV I

1 Quad Cities Unit 2 Cycle 14 j

j- ..

,, Cera Opertting Limits Report May,1996 LIST OF TABLES i

Table Title Page 2-1 Maximum Average Planar Linear Heat Generation 2-1 Rate (MAPLHGR) vs. Average Planar Exposure for G E 88-P8 D OB 300-9 G 3.0-80 M-4WR-145-T.

1 2-2 Maximum Average Planar Linear Heat Generation 2-2 Rate (MAPLHGR) vs. Average Planar Exposure for G E 88-P8 D OB31 6-7 G4.0-80M-4W R- 145-T.

2-3 Maximum Average Planar Linear Heat Generation 2-3 Rate (MAPLHGR) vs. Average Planar Exposure for GE9B-P80WB310-9GZ-80M-145-T.

2-4 Maximum Average Planar Linear Heat Generation 2-4 Rate (MAPLHGR) vs. Average Planar Exposure for GE98-P8DWB299-11 GZ-80M-145-T.

2-5 Maximum Average Planar Linear Heat Generation 2-5 Rate (MAPLHGR) vs. Average Planar Exposure for GE98-P8DWB286-7G3.0-80M-145-T.

26 Maximum Average Planar Linear Heat Generation 26 Rate (MAPLHGR) vs. Average Planar Exposure for GE98-P8DWB286-9GZ-80M-145-T.

l 2-7 Maximum Average Planar Linear Heat Generation 2-7 l Rate (MAPLHGR) vs. Average Planar Exposure for ,

l GE98-P8DWB310-7G3.0-80M-145-T.

2-8 Maximum Average Planar Linear Heat Generation 2-8 Rate (MAPLHGR) vs. Average Planar Exposure for GE98-PSDW3308-10GZ1-80M-145-T.

2-9 Maximum Average Planar Linear Heat Generation 2-9

, Rate (MAPLHGR) vs. Average Planar Exposure for GE10-P8HXB316-8GZ-100M-145-T.

2-10 Maximum Averago Planar Linear Heat Generatio:1 2-10 Rate (MAPLHGR) vs. Average Planar Exposure for

, GE10-P8HXB312-7GZ-100M-145-T.

v 4

Quad Cities Unit 2 Cycle 14

[ _

. .- .=. . -- - . . - . __ .- -___... -.. . . . _ . . . . _ . _ - . _ - - - . _ . _. _. ._

  • Core Operating Limits R2 port May,1996 l

LIST OF FIGURES Figure Title Page 4-1 Kf Factor vs. Core Flow %. 41 l

l l

1 l

l l

t vi Quad Cities Unit 2 Cycle 14 s

,, Ccra Operating Limits R; port May,1996 l 1.0 CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION (3.2/4.2) 1.1. TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification Table 3.2-3 and 3.6.H.3.d 4

. TSUP Technical Specification: Table 3.2.E-1 (COLR 1.2],3.6.A.1.c

[COLR 1.31 2
  • ..2. DESCRIPTION:

The Rod Withdrawal Block Monitor Upscale Instrumentation Trip Setpoint for 3 two recirculation loop operation is determined from the following 4

relationship:

2

_< (0.65)Wd + 43% "

1.3. DESCRIPTION

The Rod Withdrawal Block Monitor Upscale Instrument Trip Setpoint for 4

Single Recirculation Loop Operation (SLO) is determined from the following relationship.

< (0.65)Wd + 39% '

a .

' Clamped, with an allowable value not to exceed the allowable value for  !

recirculation loop drive flow (Wd) of 100%. i Wd is the percent of drive flow .equired to produce a rated core flow of 98 million Ib/hr. Trip level setting is in percent of rated power (2511 l MWth).

i i

I

Fage 1 4

Quad Cities Unit 2 Cycle 14

J, Core Op3 rating Limits Report May,1996 2.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) (3.5/4.5) 2.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification 3.5.1 lTSUP Technical Specification 3.11.A

2.2 DESCRIPTION

MAPLHGR versus Average Planar Exposure for GE8B-P8DOB300-9G3.0-80M-4WR-145-T is determined from Table 2-1.

MAPLHGR versus Average Planar Exposure for GE8B-P8DOB316-7G4.0-80M-4WR-145-T is determined from Table 2-2.

MAPLHGR versus Average Planar Exposure for GE98-P8DWB310-9GZ-80M-145-T is determined from Table 2 3.

MAPLHGR versus Average Planar Exposure for GE9B-P8DWB299-11GZ-80M-145-T is determined from Table 2-4.

MAPLHGR versus Average Planar Exposure ice GE98-P8DWB286-7G3.0-80M-145-T is determined from Table 2-5.

MAPLHGR versus Average Planar Exposure for GE98-P8DWB286-9GZ-80M-145-T is determined from Table 2-6.

MAPLHGR versus Average Planar Exposure for GE98-P8DWB310-7G3.0-BOM-145-T is determined from Table 2-7.

MAPLHGR versus Average Planar Exposure for GE98-P8DWB308-10GZ1-80M-145-T is determined from Table 2-8.

MAPLHGR versus Average Planar Exposure for GE10-P8HXB316-8GZ-100M-145-T is determined from Table 2-9.

MAPLHGR versus Average Planar Exposure for GE10-P8HXB312-7GZ-100M-145-T is determined from Table 2-10.

2.3 SINGLE LOOP OPERATION MULTIPLIER:

The tabulated values are multiplied by 0.85 whenever Quad Cities enters Single Loop Operation.

Page 2 Quad Cities Unit 2 Cycle 14

~, Core Opsrating Limits Report May,1996 TABLE 2-1 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE88 P8DQB300-903.0-80M-4WR-145-T LATTICE 565 : P8 DOLO 71-NOG 80M-4WR-T LATTICE 671 : P8 DOL 320-9G3.0-80M-4WR-T LATTICE 686 : P8 DOLO 71-9GE2-80M-4WR-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 565 671 686 (GWd/ST) 0.00 11.57 11.39 11.57 0.20 11.50 11.42 11.50 1.00 11.30 11.50 11.30 2.00 11.28 11.75 11.28 3.00 11.33 12.08 11.33 _ , _ .

4.00 11.40 12.47 11.40 __

5.00 11.48 12.80 11.48 6.00 11.55 13.01 11.55 7.00 11.61 13.16 11.61 8.00 11.66 13.29 11.66 9.00 11.69 13.39 11.69 10.00 11.72 13.44 11.72 12.50 11.44 13.34 11.44 15.00 11.07 12.96 11.07 20.00 10.29 12.19 10.29 25.00 9.50 11.46 9.50 35.00 7.93 10.08 7.93 43.30 4.66 -

4.66 45.00 -

8.46 -

50.00 -

6.14 -

Page 2-1 Quad Cities Unit 2 Cycle 14

' Core Operating Limits Report May,1996 TABLE 2-2 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE GE88-P8DQ8316-7G4.0-80M-4WR-145-T LATTICE 565 : P8 DOLO 71-NOG-80M-4WR-T LATTICE 679 : P8DQL337-7G4.0-80M-4WR-T LATTICE 649 : P8 DOLO 71-7GE1-80M-4WR-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 565 679 649 (GWd/ST) 0.00 11.57 11.70 11.57 0.20 11.50 11.69 11.50 1.00 11.30 11.74 11.30 2.00 11.28 11.86 11.28 3.00 11.33 12.01 11.33 4.00 11.40 12.18 11.40 5.00 11.48 12.38 11.48 6.00 11.55 12.59 11.55 7.00 11.61 12.81 11.61 8.00 11.66 12.99 11.66 9.00 11.69 13.06 11.69 10.00 11.72 13.08 11.72 12.50 11.44 13.01 11.44-15.00 11.07 12.66 11.07 20.00 10.29 11.97 10.29 25.00 9.50 11.31 9.50 35.00 7.93 10.05 7.93 43.30 4.66 -

4.66 45.00 -

8.45 -

50.00 -

5.99 -

Page 2-2 Quad Cities Unit 2 Cycle 14

, Cora Operating Limits Rep::rt May,1996 TABLE 2-3 MAPLHOR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE95-P8DWB310-902-80M-145-T LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 847 : P8DWL334-7G3.0-80M-T LATTICE 848 : P8DWL350-7G3.0-80M-T LATTICE 849 : P8DWL350 2G4.0/7G3.0-80M-T LATTICE 846 : P8DWLO71-9GE1-80M-T AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 847 848 849 846 (GWd/ST) 0.00 11.64 12.25 11.78 11.31 11.64 0.20 11.57 12.32 11.85 11.39 11.57 1.00 11.38 12.46 11.99 11.55 11.38 2.00 11.36 12.62 12.19 11.78 11.36 3.00 11.41 12.79 12.36 12.02 11.41 4.00 -

11.49 12.96 12.52 12.22 11.49 5.00 11.56 13.14 12.69 12.44 11.56 6.00 11.63 13.23 12.81 12.60 11.63 7.00 11.69 13.30 12.93 12.77 11.69 8.00 11.74 13.38 13.04 12.93 11.74 9.00 11.78 13.43 13.14 13.08 11.78 10.00 11.81 13.46 13.21 13.20 11.81 12.50 11.54 13.41 13.21 13.21 11.54 15.00 11.16 13.02 12.94 12.93 11.16 20.00 10.37 12.28 12.30 12.29 10.37 25.00 9.58 11.57 11.61 11.60 9.58 35.00 8.01 10.27 10.29 10.27 8.01 43.70 4.71 - - -

4.71 45.00 -

9.02 8.98 8.92 -

51.10 - - -

5.90 -

51.20 -

5.96 5.90 - -

Page 2-3 Quad Cities Unit 2 Cycle 14

, Cora Oper ting Limits RIport 1-May,1996 4

TABLE 2 4 1

' MAPLHOR vs. AVERAGE PLANAR fiXPOSURE '

FOR BUNDLE TYPE : GE98-PSDWB29911GZ-80M-145 T 1

LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 850, P8DWL322-9G3.0-80M-T i LATTICE 851 : P8DWL337-9G3.0-80M-T j LATTICE 852 : P8DWL337-2G4.0/9G3.0-80kT i J, LATTICE 853 : P8DWLO71-11GE-80M-T i

I

AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 850 851 852 853 (GWF;T) 0.0L 11.64 11.49 11.31 10.87 11.64 0.20 11.57 11.52 11.38 10.96 11.57 1.00 11.38 11.62 11.56  ?.1.14 11.38 2.00 11.36 11.87 11J44 1s.44 11.36 3.00 11.41 12.19 12.05 11.70 11.41 4.00 11.49 12.57 12.21 11.88 11.49 5.00 11.56 12.94 12.37 12.07 11.56 6.00 11.63 13.04 12.54 12.27 11.63 7.00 11.69 13.14 12.73 12.50 11.69 8.00 11.74 13.21 12.90 12.72 11.74 '

9.00 11.78 13.26 13.03 12.92 11.78 l 10.00 11.81 13.28 13.11 13.07 11.81 12.50 11.54 13.21 13.07 13 06 11.54 15.00 11.16 12.82 12.81 12.81 11.16 20.00 10.37 12.07 12.30 12.30 10.37 25.00 9.58 11.36 11.66 11.64 9.58 35.00 8.01 10.07 10.29 10.27 8.01 43.70 4.71 - - -

4.71 45.00 -

8.61 8.85 8.82 -

50.60 -

5.89 - - -

E ' .00 - - -

5.84 -

L 1.20 - -

5.81 - -

i Page 2-4 Quad Cities Unit 2 Cycle 14 I

e Cora Operating Limits R;pirt May,1996 1

TABLE 2-5 '

l MAPLHGR vs. AVERAGE PLANAR EXPOSURE Fud BUNDLE TYPE : GE98-P8DW8286-7G3.0-80M-145-T LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 1059 : P8DWL306-7G3.0-80M-T LATTICE 1060 : P8DWL324-7G3.0-80M-T LATTICE 1061 : P8DWLO71-7GE1-80M-T AVERAGG MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 731 1059 1060 1061 (GWd/ST) 0.00 11.64 12.38 1 1. 9 5 11.64 0.20 11.57 12.45 1 *.:.03 11.57 1.00 11.38 12.54 12.11 11.38 2.00 11.36 12.65 12.30 11.36 3.00 11.41 12.75. 12.57 11.41

! 4.00 11.49 12.85 12.88 11.49 i

! 5.00 11.56 12.94 12.97 11.56 6.00 11.63 12.95 13.01 11.63 7.00 11.69 12.97 13.09 11.69 8.00 11.74 13.01 13.17 11.74 l 9.00 11.73 13.05 13.21 11.78 l 10.00 11.81 13.09 13.23 11.81  ;

i 12.50 11.54 13.04 13.16 11.54 1 15.00 11.16 12.71 12.79 11.16 {

20.00 10.37 12.06 12.06 10.37 '

25.00 9.58 11.43 11.37 9.58 35.00 8.01 10.04 10.12 8.01 43.66 4.71 - -

4.71 45.00 -

8.60 8.68 -

l 50.66 -

5.84 - -

f 50.75 - -

5.91 -

l l

! Page 2-5 i Quad Cities Unit 2 Cycle 14 4

, Cera Operating Limits Riport May,1996 TABLE 2-6 MAPLHOR vs. AVERAGE PLANAR EXPOSURE l FOR BUNDLE TYPE GE98-P8DWB286-9GZ-80M-145-T l

LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 1059 : P8DWL306-7G3.0-80M-T LATTICE 1060 : P8DWL324 ~/G3.0-80M-T LATTICE 1000 : P8DWL324-2G4.0/7G3.0-80M-T LATTICE 1001 : P8DWLO71-9GE-80M-T l

l AVERAGE MAPLHGR LIMITS (KW/FT)  ;

PLANAR '

EXPOSURE 731 1059 1060 1000 1001 (GWd/ST)  ;

0.00 11.64 12.38 11.95 11.42 1i.64 O.20 11.57 12.45 12.03 11.51 11.57 1.00 11.38 12.54 12.11 11.59 11.38 l 2.00 11.36 12.65 12.30 11.82 11.36 l 3.00 11.41 12.75 12.57 12.13 11.41 4.00 11.49 12.85 12.88 12.51 11.49 i 5.00 11.56 12.94 12.97 12.69 11.56 6.00 11.63 12.95 13.01 12.80 11.63 i 7.00 11.69 12.97 13.09 12.92 11.69 l 8.00 11.74 13.01 13.17 13.04 11.74 l 9.00 11.78 13.05 13.21 13.14 11.78 l 10.00 11.81 13.09 13.23 13.20 11.81 12.50 11.54 13.04 13.16 13.14 11.54

! 15.00 11.16 12.71 12.79 12.77 11.16 i 20.00 10.37 12.06 12.06 12.04 10.37 25.00 9.58 11.43 11.37 11.36 9.58 35.00 8.01 10.04 10.12 10.11 8.01 43.66 4.71 - - -

4.71 45.00 -

8.60 8.68 8.65 -

50.66 -

5.84 -

5.92 -

50.75 - -

5.91 - -

1 i

I j Page 2-6 l

l Quad Citiss Unit 2 Cycle 14 i

)

, Cora Operating Limits Report i- May,1996 I l

TABLE 2-7 i MAPLHGR vs. AVE? AGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE98-P8DWB310-7G3.0-EOM-145-T l LATTICE 731 : P8DWLO71-NOG-80M-T l LATTICE 1644 : P8DWL334-7G3.0-80M-T LATTICE 1645 : P8DWL350-7G3.0-80M-T l LATTICE 1004 : P8DWLO71-7GE-80M-T l

l AVERAGE MAPLHGR LIMITS (KW/FT)

[ PLANAR l EXPOSURE 731 1644 1645 1004 (GWd/ST) 0.00 11.64 12.25 11.78 11.64 l 0.20 11.57 12.32 11.85 11.57  ;

1.00 11.38 12.46 11.99 11.38 l 2.00 11.36 12.62 12.19 11.36 , , _ . , . _ .

3.00 11.41 12.79 12.36 11.41 __.

4.00 11.49 12.96 12.52 11.49 5.00

)

11.56 13.14 12.69 11.56 6.00 11.63 13.23 12.81 11.63 7.00 11.69 13.30 12.93 11.69 l 8.00 11.74 13.38 13.04 11.74

! 9.00 11.78 13.43 13.14 11.78 ,

10.00 11.81 13.46 13.21 11.81 i

12.50 11.54 13.41 13.22 11.54 I 15.00 11.16 13.03 12.95 11.16 l 20.00 10.37 12.29 12.31 10.37  !

! 25.00 9.58 11.58 11.62 9.58 {

35.00 8.01 10.28 10.31 8.01 43.66 4.71 - -

4.71 45.00 -

9.04 9.01 -

51.41 - -

5.88 -

51.43 -

5.94 - -

l l

1 J

Page 2-7 i
Quad Cities Unit 2 Cycle 14 I

' Core Operating Limits Rgport May,1996 l l TABLE 2-8 '

! l MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE98-P8DWB308-10GZ1-80M-145-T l LATTICE 731 : P8DWLO71-NOG-80M-T LATTICE 1642 : P8DWL332-8G4.0/2G3.0-80M T LATTICE 1669 : P8DWL348-8G4.0/2G3.0 80M-T LATTICE 1188 : P8DWLO71-10GE-80M-T l l l

l AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR l

EXPOSURE 731 1642 1669 1188 (GWd/ST) 0.00 11.64 11.63 11.24 11.64 0.20 11.57 11.69 11.31 11.57 ,

I 1.00 11.38 11.83 11.44 11.38 l 2.00 11.36 12.04 11.62 11.36 3.00 11.41 12.25 11.82 11.41 4.00 11.49 12.48 12.02 11.49 5.00 11.56 12.58 12.24 11.56 l 6.00 11.63 12.69 12.44 11.63 l 7.00 11.69 12.86 12.62 11.69 l 8.00 11.74 13.04 12.75 11.74 9.00 11.78 13.19 12.90 11.78 10.00 11.81 13.31 13.05 11.81 12.50 11.54 13.32 13.14 11.54 15.00 11.16 12.96 12.92 11.16 l l 20.00 10.37 12.22 12.25 10.37 l

25.00 9.58 11.53 11.57 9.58 35.00 8.01 10.24 10.26 8.01 43.66 4.71 - -

4.71 45.00 -

8.93 8.93 -

51.09 -

5.96 - -

51.15 - -

5.90 -

1 1 Page 2-8 Quad Cities Unit 2 Cycle 14

, Ccra Operating Limits R port May,1996 l TABLE 2 9 MAPLHGR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE10-P8HX8316-8GZ-100M-145-T l

LATTICE 7400 : P8H'XLO71-NOG-100M

! LATTICE 7'467 : P8HXL341-6G4.0/2G3.0-100M i

LATTICE 7469 : P8HXL357-6G4.0/2G3.0-100M LATTICE 7468 : P8HXL341-8G3.0-100M LATTICE 7404 : P8HXLO71-8GE-100M AVERAGE MAPLHGR LIMITS (KW/FT)

PLANAR EXPOSURE 7400 7467 7469 7468 7404 (GWd/ST) 0.00 11.85 12.00 11.11 12.08 11.85 l 0.20 11.78 12.06 11.14 12.15 11.78 1.00 11.59 12.18 11.24 12.30 11.59 l 2.00 11.57 12.36 11.44 12.53 11.57 3.00 11.61 12.50 11.70 12.68 11.61 4.00 11.68 12.60 11.99 12.82 11.68 5.00 11.75 12.71 12.26 12.96 11.75 l 6.00 11.81 12.84 12.37 13.12 11.81 l 7.00 11.86 13.01 12.51 13.29 11.86 8.00 11.91 13.20 12.68 13.44 11.91 9.00 11.94 13.39 .2.86 13.53 11.94 l 10.00 11.97 13.52 1:2.01 13.55 11.97 12.50 11.75 13.44 13.09 13.44 11.75 15.00 11.38 13.06 12.84 13.07 11.38 l 20.00 10.59 12.32 12.21 12.33 10.59 l 25.00 9.81 11.60 11.54 11.61 9.81 35.00 8.26 10.21 10.25 10.22 8.26 44.89 4.93 - - -

4.93 45.00 -

8.72 8.82 8.72 -

50.76 - - -

5.87 -

50.78 -

5.86 - - -

50.88 - -

5.90 - -

Page 2-9 Quad Cities Unit 2 Cycle 14 l

. - . - - . .. . = . .

, Cors Operating Limits Rgport May,1996 TABLE 2-10 MAPLHOR vs. AVERAGE PLANAR EXPOSURE FOR BUNDLE TYPE : GE10-P8HXB312-7GZ-100M-145-T t

LATTICE 7400 : P8HXLO71-NOG-100M LATTICE 7405 : P8HXL336-3G4.0/4G3.0-100M LATTICE 7406 : P8HXL354-1G4.0/6G3.0-100M LATTICE 7407 : P8HXL336-7G3.0-100M LATTICE 7408 : P8HXLO71-7GE-100M AVERAGE MAPLHGR LIMITS (KW/FT) -

. PLANAR EXPOSURE 7400 7405 7406 7407 7408 i (GWd/ST) i 0.00 11.85 12.01 11.27 12.04 11.85

< 0.20 11.78 12.08 11.31 12.11 11.78 1.00 11.59 12.23 11.42 12.27 11.59 2.00 11.57 12.43 11.65 12.49 11.57 3.00 11.61 12.65 11.93 12.72 11.61 4.00 11.68 12.88 12.24 12.96 11.68 5.00 11.75 13.09 12.58 13.15 11.75 6.00 11.81 13.22 12.94 13.30 11.81 1 7.00 11.86 13.32 13.15 13.41 11.86 l 8.00 11.91 13.40 13.32 13.46 11.91 9.00 11.94 13.45 13.43 13.47 11.94 10.00 11.97 13.47 13.50 13.45 11.97 l 12.50 11.75 13.35 13.45 13.35 11.75 15.00 11.38 12.97 13.10 12.97 11.38 20.00 10.59 12.23 12.41 12.24 10.59 25.00 9.81 11.51 11.74 11.52 9.81 35.00 8.26 10.14 10.41 10.15 8.26 44.89 4.93 - - -

4.93 45.00 -

8.61 9.01 8.60 -

50.55 - - -

5.85 -

50.59 -

5.85 - - -

51.56 - -

5.86 - -

Page 2-10 Quad Cities Unit 2 Cycle 14

.s

, Cora Operating Limits Report May,1996 3.0 LINEAR HEAT GENERATION RATE (LHGR) (3.5/4.5) 3.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specification 3.5.J TSUP Technical Specification 3.11.D l

3.2 DESCRIPTION

A. The LHGR limit is 14.4 Kw/ft for all fuel types:

1. G E 8 B-P8 D OB300-9 G 3.0-80M-4WR-145-T l 2. G E 8 B-P8 D OB 316-7 G4.0-80 M-4WR-145-T
3. GE9B-P8DWB310-9GZ-80M-145-T
4. GE9B-P8DWB299-11 GZ-80M-145-T
5. GE98-P8DWB286-7G3.0-80M-145-T i 6. GE9B-P8DWB286 9GZ-80M-145-T
7. GE9B-P8DWB310-7G3.0-80M-145-T
8. GE98-P8DWB308-10GZ1-80M-145-T
9. GE10-P8HXB316-8GZ-100M-145-T
10. GE10-P8HXB312-7GZ-100M-145-T l

I l

i 3

Page 3 il l

Quad Cities Unit 2 Cycle 14 l

1 i

~

, Cora Operating Limits Raport May,1996 1

4.0 MINIMUM CRITICAL POWER RATIO (MCPR) (3.5/4.5)

! 4.1 TECHNICAL SPECIFICATION

REFERENCE:

Technical Specifications 3.5.K and 3.6.H lTSUP Technical Specification 3.11.Cl

4.2 DESCRIPTION

During steady-state operation at rated core flow, the Operating Limit MCPR (OLMCPR) shall be greater than or equal:

1.28 for tave 10.68 seconds (0.555)tave + 0.903 for 0.681 tave 10.86 seconds where tave = mean 20% scram insertion time for all surveillance data from Technical Specification 4.3.C which has been generated in the current cycle.

For core flows other than rated, these nominal values of OLMCPR shall be increased by a factor of Kf where Kf is as shown in Figure 4-1.

The (tau-ave dependent) OLMCPR limit stated above is valid for all planned Operational modes, including increased Core Flow (ICF) and Final Feedwater l Temperature Reduction (FFTR). The value corresponds to the cycle specific determination of the bounding event. For Unit 2 Cycle 14 this event is the Load Reject w/o Bypass (LRNB), with the above Operational modes incorporated.

This value was determined to be 1.32 for the minimum tau-ave of .68 seconds.

This limit matches the cycle independent limit from the Quad Cities Equipment Out-Of-Service / Emended Operating Domain analysis.

Unit Two has been approved for opeating up to 15% (Reference 6) above equilibrium coastdown power level with multiple control rods inserted. At End of Full Power Capability (EFPC) a generic MCPR operating limit MCPR penalty of 0.06 must be added to the operating limit MCPR in order to exceed equilibrium coastdown power.

t 3

Page 4 Quad Cities Unit 2 Cycle 14 l

O FIGURE 4-1 Kf FACTOR 1.5 .

1.4 :---- s, N.. _

\ '

~~_ Autorr atic Flow Control

= ~z ;'

52 1.2 ----- -----

%N ------ - - - - - - -----

~__

N ~_ __

N ~

1.1 N - - - - ------ ---_' '-~ ----- - - - - - - ------ -- ----- -

N ~~ __

Manual F. low Control N 's_.

~

w N ~~__'

1


----- ------ -- (- - - - -07%------Max Flo - --- ---)- ----- -----N --

0.9 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100105

% Core Flow .

Quad Cities Unit 2 Cycle 14 jj May,1996 Core Operating Limits Report j Page 4-1

[ Cora Opersting Limits Report May,1996 5.0 Analytical Methods The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC in the latest approved revision or supplement of the topical reports describing the methodology. For Quad Cities Unit 2, the topical reports are:

(1) NEDE-24011-P-A " General Electric Standard Application for Reactor Fuel,"

(latest approved revision).

(2) Commonwealth Edison Topical Report NFSR-OO85, " Benchmark of BWR Nuclear Design Methods," (latest approved revision). 4 (3) Commonwealth Edison Topical Report NFSR-OO85, Supplement 1, Quad Cities Gamma Scan Comparisons," (latest approved revision).

(4) Commonwealth Edison Topical Report NFSR-OO85, Supplement 2, Design Methods - Neutronic Licensing Analyses," (latest approved revision).

t l

l t

j Page 5 i

l Quad Cities Unit 2 Cycle 14 l

i. . - _. .-. _ _ .